ML17319A533

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-315/80-11 & 50-316/80-09 on 800626 & 27 & Notice of Violation
ML17319A533
Person / Time
Site: Cook  
Issue date: 07/10/1980
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER CO., INC., INDIANA MICHIGAN POWER CO.
Shared Package
ML17319A534 List:
References
NUDOCS 8008120693
Download: ML17319A533 (2)


See also: IR 05000315/1980011

Text

1

t

~p,S AECy

(4

~4

0

Ct

)~l

OO

Ugi e~1atss<II.",1 t;IIf I'.Q

tjUGEIQgIthM l Pj/o~ggAIMlssfeN

~ill-M

9t GION III

799 ROOSEVELT ROAD

GLEN ELLYN.ILLINOIS60137

'JUL

~ F880

Docket No. 50-315

Docket No. 50-316

American Electric Power Service

Corporation

Indiana

and Michigan Power

Company

ATTN:

Mr. John E. Dolan

Vice Chairman

Engineering

2 Broadway

New York, NY

10004

Gentlemen:

This refers to the inspection

conducted

by Mr. R. D. Schulz

and

Mr. E. R.

Swanson

on June

26 and 27,

1980, of activities Donald

C.

Cook

Nuclear Plant, Units

1 and 2, at authorized

by NRC Operating License

No. DPR-58

and DPR-74 and to the discussion of our findings with

Mr. Shaller

and others of your staff at the conclusion of the inspection.

The enclosed

copy of our inspection report identifies areas

examined

during the inspection.

Within these

areas,

the inspection consisted

of a

selective

examination of procedures

and representative

records,

observa-

tions,

and interviews with personnel.

During this inspection,

certain of your activities appeared

to be in

noncompliance with NRC requirements,

as described in the enclosed

Appendix A.

This notice is sent to you pursuant

to the provisions of Section

2.201 of

the NRC's "Rules of Practice," Part 2, Title 10,

Code of Federal

Regu-

lations.

Section

2.201 requires

you to submit to this office within 20

days of your receipt of this notice

a written statement

or explanation in

reply, including for each item of noncompliance:

(1) corrective action

taken

and the results

achieved;

(2) corrective action to be taken to

avoid further noncompliance;

and (3) the date

when full compliance will

be achieved.

American Electric Power Service

Corporation

)g. ~] g

58O

In accordance

with Section

2.790 of the NRC's "Rules of Practice," Part

2, Title 10,

Code of Federal Regulations,

a copy of this letter, the

enclosures,

and your response

to this letter will be placed in the NRC's

Public Document

Room, except

as follows. If the enclosures

contain

information that you or your contractors believe to be proprietary,

you

must apply in writing to this office, within twenty days of your receipt

of this letter, to withhold such information from public disclosure.

The

application must include

a full statement

of the reasons

for which the

information is considered proprietary,

and should

be prepared

so that

proprietary information identified in the application is contained in an

enclosure

to the application.

We will gladly discuss

any questions

you have concerning this inspection.

R. F. Heishman,

Chief

Reactor Operations

and

Nuclear Support Branch

Enclosure:

IE Inspection

Report No. 50-315/80-11

and

No. 50-316/80-09

Appendix A, Notice of

Violation

cc w/encl:

Mr. D. V. Shaller,

Plant

Manager

Central Files

Reproduction Unit NRC 20b

PDR

Local

PDR

NSIC

TIC

Ronald Callen, Michigan Public

Service

Commission

~

RI

'an

o /cs

C

Cz

7/3/80

((o

RIII

>/iv/p-

RI

Hei hman