AppendixA NOTICE OF VIOLATION American Electric Power Service Corporation Docket No. 50-315; 50-316 Based on the inspection conducted on June 26 and 27, 1980, it appears that one of your activities was in noncompliance with NRC requirements, as noted below.
This item is a deficiency and applies to both units.
10CFR50.54 {i-1) requires the licensee to have in effect an operator requalification program which shall, as a minimum, meet the requirements of Appendix A of Part 55 of 10 CFR.
D.C.Cook License Operator Requali-fication Program states in the area of Facility Design Change, Procedure Change and Facility License Change Review:
"Each licensed operator is responsible for reviewing these revisions and documenting this review on Form G-4."
Contrary to this requirement, one shift - shift IV, had not documented review (Form G-4) of revisions on seven change notifications in a period from 2/26/80 to 5/12/80.