ML17318A664

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-315/80-02 & 50-316/80-02 on 791201-800111 & Notice of Violation
ML17318A664
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 02/16/1980
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
INDIANA MICHIGAN POWER CO.
Shared Package
ML17318A665 List:
References
NUDOCS 8004040436
Download: ML17318A664 (2)


See also: IR 05000315/1980002

Text

gp,R RE0y

~4

~o

Cy

0

V/+0

qO

+w*w~

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

799 ROOSEVELT ROAO

GLEN ELLYN,ILLINOIS60137

FEB 16 mao

CENTRAL FILEs

Docket No. 50-315

Docket No. 50-316

American Electric Power Service

Corporation

Indiana

and Michigan Power

Company

ATTN:

Mr. John E. Dolan, Vice

Chairman,

Engineering

2 Broadway

New York, NY 10004

Gentlemen:

This refers to the inspection

conducted

by Mr. R. E. Masse of this

office on December

1,

1979 - January ll, 1980, of activities at

Donald

C.

Cook Nuclear Plant authorized

by NRC Operating Licenses

No. DPR-58

and No. DPR-74 and to the discussion of our findings

with Mr. Shaller

and others of your staff at the conclusion of the

inspection.

The'enclosed

copy of our inspection report identifies areas

examined

during the inspection.

Within these

areas,

the inspection consisted

of a selective

examination of procedures

and representative

records,

observations,

and interviews with personnel.

During this inspection,

certain of your activities appeared

to be in

noncompliance with NRC requirements,

as described in the enclosed

Appendix A.

This notice is sent to you pursuant to the provisions of Section 2.201

of the NRC's "Rules of Practice," Part 2, Title 10,

Code of Federal

Regulations.

Section 2.201 requires

you to submit to this office

within twenty days of your receipt of this notice

a written statement

or explanation in reply, including for each item of noncompliance:

(1)

corrective action taken

and the results

achieved;

(2) corrective

action to be taken to avoid further noncompliance;

and (3) the date

when full compliance will be achieved.

In accordance

with Section 2.790 of the NRC's "Rules of Practice,"

Part 2, Title 10,

Code of Federal Regulations,

a copy of this letter,

the enclosures,

and your response

to this letter will be placed in

the NRC's Public Document

Room, except

as follows. If the enclosures

American Electric Power Service

- 2-

f85'

6 198o

contain information that you or your contractors

believe to be proprie-

tary, you must apply in writing to this office, within twenty days of

your receipt of this letter, to withhold such information from public

disclosure.

The application must include

a full statement

of the reasons

for which the information is considered proprietary,

and should

be pre-

pared

so that proprietary information identified in the application is

contained in an enclosure

to the application.

We will gladly discuss

any questions

you have concerning this inspection.

Sincerely,

R. F. Heishman,

Chief

Reactor Operations

and

Nuclear Support Branch

Enclosures:

l. IE Inspection Rpts

No. 50-315/80-02

and No.

50-316/80-02

2. Appendix A, Notice

of Violation

cc w/encl:

D. V. Shaller, Plant Manager

Central Files

Reproduction Unit NRC 20b

PDR

I,ocal

PDR

NSIC

TIC

Ronald Callen, Michigan Public

Service

Commission

RII

I'sse/jp

2/9/80

RIII

RII$

Hexshman

g(i(P