INDIANA 4 MICHIGAN P. O. BOX 18 BOWLING OREEH STATION KEW YORK, K. Y. 10004
.M~~,
Cg~;~u POWER COMPANY July 25, 1979 AEP: NRC: 00185B Donald C.
Cook Nuclear Plant Units 1
8 2
Docket Nos.
50-315 and 50-316 License Nos.
DPR-58 and DPR-74 Mr. James G. Keppler, Regional Director U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region III 799 Roosevelt Road Glen El lyn, Illinois 60137 i, 'i goal gi'QiliiiL"ii (ii*ggiljI'iiuLJ'<t
Dear Mr. Keppler:
This letter supplements our letter of May 1, 1979 (AEP:NRC:00185) in response to IE Bulletin 79-06A, Revision 1.
On June 20, 1979 we
- received, by telecopy, a request for additional information as a result of the NRC Staff review of our May 1, 1979 response.
The attachment to this letter contains our responses to the requests resulting from your evaluation of our May 1, 1979 submittal.
In a phone conversation held Friday, June 22, 1979 with members of the NRC Staff in Bethesda, Md., we were requested to supply responses to some parts of Action Items 4, 7, 8,
and 10 before Unit 2 would be allowed to return to power.
We provided you with our responses to those action items in our June 25, 1979 letter.
These responses are included again, with minor corrections, in the attachment to this letter.
Please note that we are members of a Westinghouse Owner's Group on the Three Mile Island Accident formed at the recomendation of the Commission.
Active discussions are now taking place between the Group, Westinghouse, and the NRC, where some of the issues contained in your requests are being evaluated.
We therefore reserve the right to modify our responses, actions or commitments once a final position is reached.
Very truly yours, JED/emc Attachment ohn
. Dolan ice President Sworn
~a d subscribed to before me this~day of July, 1979 in New York County, New York Notary Publ c
GREGORY M. GURICAN Notary Public. State of New York Ho. 314643431 Ouatlficd in New York CountVo Cornrntsston Exolres Mare 30. tgQlr giUt oOI878 r o o92 8 (gg q
Mr. J.
G. Keppler AEP:NRC:00185B cc:
R.
C. Callen G.
Char noff R.
W. Jurgensen R. S. Hunter D. V. Shaller - Bridgman S. A. Varga -
NRC N.
C. Moseley -
NRC
ATTACHMENT ACTION ITEN ~',
Listed below is instrumentation which could be used, under certain circumstances, to recognize void formation in the Reactor Coolant System (RCS):
A)
Pressurizer Pressure B)
Core Outlet Temperature 1) incore ther'mocouples 2) wide range hot leg temperatures C)
Pressurizer Level D)
Nuclear Instrumentation Pressurizer pressure and core outlet temperature would primarily be used to verify subcooled liquid in the RCS.
Pressurizer level would be used to verify adequate coolant inventory.
Large sudden changes in these parameters might provide indication of potential or actual voiding in the RCS.
Data has been collected from the in-core neutron flux system corresponding to many reactor conditions.
This data could be used as a
basis of comparison with the signals obtained from a core where local bubbles or voids existed.
Operators are instructed to keep system pressure greater than the saturation pressure corresponding to the highest indicated temperature under forced and natural circulation modes.
This can be accomplished by increasing pressure or decreasing temperature.
One method of control will be by increasing pressure with the pressurizer heaters, if available, or system cooldown by steam release from the Steam Generators.
If a voiding condition develops anyway, there are modes of operation which can be used to remove the void.
Our response to Action Item 12, con-cerning hydrogen removal from the RCS describes these modes of operation and the circumstances under which they would be employed.
Part of the Westinghouse Owners'roup scope includes preparation of generic emergency instructions for natural circulation.
These instructions are expected to be available by September 1, 1979.
Subsequent to their receipt we will write and issue a new operating procedure whose purpose will be to identify and maintain natural circulation consistent with the Group's generic instructions.
In the interim we have put together a review package for all licensed personnel consisting of the following information.
(1)
Chronological sequence of the TMI-2 accident.
(2)
IE Bulletin 79-06 "Review of operating errors and system malfunctions identified during the Three Mile Island Incident".
(3)
Westinghouse's article entitled,"Steady State Natural Circu>tion, Calculation and Verification."
(4)
A set of operating charts wi% written explanation of a Cook Unit 1
trip from 100" power on March 23, 1979.
The Unit scram was caused by the tripping of two vital instrument buses.
The reactor was in a stable condition on natural circulation for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and 52 minutes at which time a reactor coolant pump was restarted.
This information has been made a required review for all licensed per-
.sonnel.
Group review sessions have been held in which open discussion was encouraged and received.
In this review, natural circulation was dis-cussed in detail and it was pointed out that the major difference between forced and natural circulation is that the, Reactor Coolant Pumps are not in operation while on natural circulation.
In both cases the system pressure must be maintained higher than hot leg saturation.
The pressurizer level must be maintained on scale to indicate adequate RCS water inventory.
The steam generator level must be maintained to assure adequate secondary side water inventory for heat removal.
No further procedure revisions in this re-gard are required a t this time, as the above key points are adequately covered.
ACTION ITEN 3:
In our Nay 1, 1979 submittal (AEP:t<RC:00185),in response to Item 3
we indicated that, "All operations personnel were instructed to manually initiate safety injection during normal operation when the pressurizer pressure in-dication reaches the actuation setpoint, regardless of p%ssurizer
- level, on April 17, 1979".
Our instructions indicated that with an uncontrolled pressure reduction down to the safety injection actuation setpoint, safety injection should be manually initiated, regardless of the water level in the pressurizer.
As such, safety injection would be manually initiated by the operator at the setpoint for pressurizer pressure-low.
Excerpts from the instructions of April 7, 1979 are as follows:
"On Unit 1 with an uncontrolled reactor coolant system pressure reduction, when the pressure reaches 1800 psig manually initiate safety injection, re-gardless of pressurizer level."
"On Unit 2 with an uncontrolled reactor coolant system pressure reduction, when the pressure reaches 1900 psig manually initiate safety injection regardless of pressurizer level."
Since our Hay 1, 1979 response to Item 3, we have modified the automatic safety injection actuation logic to a 2 out of 3 channel logic on low pressure only.
Our 'submittal of June 6,
1979 (AEP:HRC:00185A) proposed changes to our Technical Specifications and described the new actuation logic.
On June 21, 1979 the HRC issued Amendment )los.
29 and 11 to the operating licenses for Units 1 and 2 and the related safety evaluation report on this matter.
ACTION ITEtl 4:
In our Hay 1, 19?9 response to Item 4 we indicated that we were reviewing containment isolation in light of the TtlI-2 Incident.
This review is completed with the results provided below which supplement our t1ay 1, 1979 submittal.
Our responses to Action Iterll" 7 and 12 indicate that it would be desirable, should an unsafe plant condition develop to b bl to o crate p
certain equipment inside the containment that becon d
y ase A and or a Phase 8 signal (automatic safety actuation).
Re-ecomes iso ate setting or overriding of the Phase A and/or Phase 8 containment isolation exam le c n signals would be required to place this equipment int F
p e, control air inside containment to the Power Operated Relief Valve (PORV) is isolated under Phase A.
e e ie aves r'he Reactor Coolant Pumps (RCP) can be operated under a Phase A 'contain-ment isolation.
The RCP seal water discharge is isolat d
b Ph A
ation.
However the seal water supply line is not isolated and the charging pumps can continue to supply seal water to the RCP's uider a Phase A
containment isolation.
A safety valve set at 150 si di h
pressurizer relief tan
- psi, isc arges to the ie ank to prevent the supply lines from overpressuriz~ng.
Operator action would be required to reset Phase A containmont t'
h seal water return line back into service by operation of each e
iso a ion isolation valve control switch for valves gCtl-250 and HACH-350.
Phase A
containment isolation will not be reset unless an unsafe plant condition develops in accordance with our response to Action Item 7.
Phas Similarly, Component Cooling Water (CCW) to'the RCP's is isolated under hase 8.
Operation without CCW wi 11 result in damage to the pumps.
Thus the RCP's should be manually tripped when Phase 8 is reached.
Component Cooling Water to and from the RCP oil coolers and thermal bar 's isolated under Phase 8 containment isolation.
Non-essential Service Water (NESW) to and from the RCP tiotor Air Coolers and Air Cooler Vents are isolated under a Phase 8 containment isolation.
In summary, to operate a
RCP under Phase 8 isolation would require re-setting Phase 8 isolation, operating each CCH isolation valve control switch to place CCW into service and then restarting the RCP.
It should also be noted that when containment pressure high-high at 3 psig is reached and Phase 8 isolation is initiated, the containment sprays will also actuate.
Operation of the RCP's in a spray environment is uncertain.
Our letter of June 8, 1979 (AEP:NRC:00114A) described actions we have taken regarding the matter of overriding safety actuation signals by use of the reset feature mentioned above.
As it applies here a thorough review of the need to use the reset feature is required prior to the Senior Re-actor Operator granting approval to reset Phase A or Phase B contairrer t isolation signals.
When the reset is used, an alarm. will annunciate in the control room.
An evaluation of the status of the safety actuattcr.
sign~)
inputs will be performed prior to de-energizir.g this alan-.
If an unsafe p1ant condition develops or beco;.~s aggravated because of placing
<ri<0 OperatiOn a
RCP Or a PORV under PhaSe A ard/Or PhaSe B COntaie err'SOlaCfon conditions, then the RCP or PORV wi 11 b<< taken out of servlce and Phase A
and/or Phase B will be manually initiated.
The Cook Plant isolation system is designed to limit the leakage of radioactive materials through fluid lines penetrating the containment building.
Lines for which isolation is required are designed such that no single failure can prevent isolation.
The design criteria for containment isolation is such that it is not reset by the elimination or resetting of the initiating signals, for example by resettin~
Safety Injection.
Containment Isolation can only be reset by manual controls on the main control board as described earlier.
Control features are provided for the containment isol~on valves such that:
a)
The valves will remain in the closed position if the Phase A and or Phase B signal is reset.
b)
The containment isolation signals override all other automatic control signals.
c)
Each valve can be opened or closed normally after the Phase A and/or Phase B containment isolation signals are reset.
Thus the current design provides for containment isolation and includes provisions such that containment isolation is not degraded by reset of initiating signals.
Those lines that provide needed safety features or core cooling capability are not isolated.
Should an unsafe plant condition develop requiring the use of some of the lines that are isolated, design features and administrative controls are provided to allow these lines to be placed into service.
The lines automatically isolated by Phase A and Phase B containment isolation are listed in Table 3.6-1 of our Technical Specifications for both, Unit 1
and Unit 2.
Phase A containment isolation and main feedwater isolation are automatically initiated by a safety injection signal de-rived from the Reactor Protection System or Containment Pressure
- High at 1.2 psi.
Phase B containment isolation, main steam isolation and contain-ment spray are automatically initiated by Containment Pressure High-High at 3 psi.
Listed below are all lines penetrating the containment that do not automatically isolate on Phase A containment isolation signal.
Similarly, lines penetrating the containment that do not automatically isolate on a Phase B containment isolation are listed below.
Some of these lines are not in service or aligned with an operable flow path during power operation and are listed separately.
P
LINES'ttORMALLY Itl SERVICE OR ALIGttED WITH AN OPERABLE FLOit PATlt THAT 00 NOT BECOME ISOLATED Ott A PHASE "A" SIGttAL OR WAlt,'EED!ATER ISOLATIOrt S IGttAL l.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
Reactor Coolant Pump Seal Suey Upper Containment Spray Inlet Lower Containment Spray Inlet RHR to Containment Spray RHR Cooldown Suction RHR to RC Hot Legs (LHSI)
RHP, from Recirculation Sump Safety Injection - (High Head and Intermediate Head)
Boron Injection Line Auxiliary Feed tater*
Steam Generator Chemical Feed
'lteld Channel Pressurization Air CCW to hain Steam Penetrations CCW from Main Steam Penetrations CC!A to Pressure Equalizing Fans CCl! from Pressure Equalizing Fans Air Particulate-Radiogas Sample Return Contain,",!ent Pressure Transmitters CCW from Reactor Coolant Pump Oil Coolers CCW from Reactor Coolant Pump Thermal Barriers CCW to RCP Oil Coolers and Thermal Barriers Sample to Air Particulate
- Radiogas Detector Non-Essential Service Water from Containment, Coolers Non-Essential Service Water from Containment Coolers Non-Essential Service l!ater to Instrument Room Cooler Non-Essential Service Water from Instrument Room Cooler Non-Essential Service
!Hater to RCP Motor Air Coolers Non-Essential Service Water from RCP Motor Air Coolers Main Steam from Steam Generators.
Headered together with main feedwater downstream of the main feefwater isolation valve.
LINES NORMALLY IN SERVICE OR ALIGNED WITH AN OPERABLE FLOW PATH THAT DO NOT BECOME ISOLATED ON A PHASE 'B'R MAIN STEAM ISOLATION SIGflAL OR PHASE 'A'IGNAL 1.
Reactor Coolant Pump Seal Supply 2.,
Upper Containment Spray Inlet 3.
Lower Containment Spray Inlet 4.
RHR to Containment Spray 5.
RHR Cooldown Suction 6.
RHR to RC Hot Legs (LHSI}
7.
RHR from Recirculation Sump 8.
Safety Injection - (High Head and Intermediate Head) 9.
Boron Injection Line
- 10. Auxiliary Feed Water 11.
Steam Generator Chemical Feed 12.
Weld Channel Pressurization Air 13.
CCW to Main Steam Penetrations 14.
CCW from Main Steam Penetrations 15.
CCW to Pressure Equalizing Fans 16.
CCW from Pressure Equalizing Fans
- 17. Containment Pressure Transmitters LINES NOT NORMALLY IN SERVICE WHICH DO NOT RECEIVE PHASE A AND B SIGNALS LINE
- l. S. I. And Accumulator Test Line
- 2. Fuel Transfer Tube
- 3. Service Air to Containment
- 4. Ice Loading Supply Line
- 5. Containment Pressurization Test Line 6.
Ice Loading Return Line
- 7. Refueling Water Supply
- 8. Demineralized Water Supply
- 9. Refueling Cavity Drain 10.Dead Weight Test Connection ll.Lower Containment Radiation Sample 12.Upper Containment Radiation Sample
- 13. Instrument Room Radiation Sample
- 14. Incore Flux Detection System Access MEANS OF ISOLATION 2 Manual Valves - Locked Closed Blind Flange Manual Valve-Locked Closed and Blind Flange Blind Flange Blind Flange Blind Flange 2 Manual Valves - Locked Closed 2 Manual Valves - Locked Closed 2 Manual Valves - Locked Closed Manual Valve - Closed 2 Manual Valves - Closed 2 Manual Valves - Closed 2 Manual Valves - Closed Blind Flange
4 r
ACTION ITEM 7 Operating procedures and train'ing instructions have been reviewed and in no case is the operator instructed to reset or override any automatic ESF actuation signal.
The procedures have been changed to include the statement "unless it would result in unsafe plant conditions".
This requirement does not apply to spurious or inadvertent actuaXion when the cause is known.
0 After 50 F of sub-cooling has been achieved, termination of Safety Injection operation prior to 20 minutes is only permissible if it has been determined that continued operation would result in an unsafe plant condition.
This requirement does not apply to spurious or inadvertent actuation when the cause is known.
The following procedural steps exist requiring that a minimum of 2 Reactor Coolant Pumps remain in operation as long as the pump is providing forced flow and continued operation shall not result in any unsafe plant condition.
PROCEDURE STEPS KEY POINTS 4.2.7 Maintain a minimum of 2 Reactor Coolant pumps running for primary coolant circulation.
- l. It is essential that a
minimum of two R.C.P.'s be maintained in service in order to provide forced cooling of the Reactor core.
2.
Pump operation must be continued even though the normal minimum operating requirements may not be met.
- 3. If the continued operation of the R.C.P.'s threatens to cause an increase in the'everity of the accident condition, the pump or pumps should be removed from service.
- 4. If component cooling water flow to the R.C.P.'s is lost bearing failures will occur very rapidly and therefore the pump or pumps must be removed from service.
It is estimated that bearing failure may occur within 5 minute of loss of component cooling water.
~
~
I I
i ~
'I PI
ACTIOtl ITEYi 8 A complete valve lineup walk around of all safety related valves including locked valves has been performed prior to the startup following the hay 19, 1979 Unit 2 outage and following the April 6th outage of Unit l.
4 Ct
ACTION ITEN 10 There is an administrative requirement which has been in effect over one year, since July 7, 1978, which instructs the Shift Supervisor, at the start of each shift, to place in his log all Technical Specification items that are inoperable.
The requirement also includes instructions to log any equipment that becomes inoperable during the shift and also any equipment that is returned tolerable status during the shift.
These logs must be reviewed by the incoming Shift Supervisor and verified by signoff.
In this manner, the status of safety related systems is known at a shift change.
ACTIOfl ITEi'l 12 Our response to Item 12, contained in our May 1, 1979 letter responding to IE Bulletin 79-06A, addressed hydrogen control in the containment.
This additional response to Item 12 addresses hydrogen control in the RCS and supplements our May 1, 1979 submittal.
The engineered safeguards atMok Plant are designed to meet the limits of 10 CFR 50.46 which require that the hydrogen generation from clad water reaction in a LOCA be limited to less than 1" of the clad metal, and no where exceed 1?<. of the clad thickness.
Hydrogen removal from the Reactor Coolant System (RCS) can be accomplished by operation of RCS letdown, Reactor Coolant
- Pumps, power operated relief valves and/or normal pressurizer pressure control.
Systems required to support these functions such as offsite power, component cooling water, compressed air and pressurizer heaters and sprays may not be available inside of the containment.
Their use is dependent upon the circumstances surrounding an event where their use may be desirable.
These systems are not essential for a safe shutdown of the plant during a design basis accident and are isolated on Containment Isolation (Phase A or Phase B).
Our supplemental response to Action Item 4 provides further information on containment isolation.
Containment Isolation Phase A is automatically initiated by a Safety Injection signal derived from the Reactor Protection System or Containment Pressure High at 1.2 psi.
Containment Isolation Phase B
is automatically initiated from Containment Pressure
- High-High at 3.0 psi. If the circumstances surrounding an event are such that the use of the above mentioned non-essential systems inside of the contain-ment is desirable and the containment is isolated then deliberate operator action is required.
After careful review of the need to break containment isolation the operator would have to reset and override the Containment Isolation signal (Phase A or B) and manually place the desired system or component into service.
Also, operating these systems during a station blackout would require operator action.
The modes for hydrogen removal described below can be utilized from the main control room.
are:
The modes for removing hydrogen from the reactor coolant system
- 1. Hydrogen can be stripped to the pressurizer vapor space by pressurizer spray operation if loop number 3 reactor coolant pump is operating and control air inside cpntainment is available.
ls 1
E ll I
ACTION ITEN 12 CONT'D.
2.
Hydrogen in the pressurizer vapor space can be vented and discharged to the pressurizer relief tank by operating the power operated relief valves if control air inside containment is available.'.
Hydrogen can be removed from the reactor coolant system by the letdown line and stripped in the volume control tank where it enters the waste gas system (if the letdown line is available).
If for some reason a non-condensible gas bubble becomes situated somewhere in the primary coolant system, there are several options for continued core cooling and removing the bubble.
If the gas bubble becomes located in the upper head, the following methods of core cooling are unaffected.
Steam generators can be used to remove decay heat using reactor coolant pump forced flow (if RCP is available) or natural circulation.
The safety injection system can be used to cool the core while venting through the pressurizer power operated relief valve if this method is available.
Core cooling by any of these methods can proceed indefinitely if the primary coolant pressure is held constant.
If the bubble were to grow to the top of the hot leg, it would slide across the hot leg and up into the steam generators.
As depressurization continues, the gas bubbles grow in the steam generators and upper head but the core remains covered and cooled by safety injection water.
If there is enough
- gas, the pressurizer surge line would eventually be "uncovered".
Some of the gas would burp into the pressurizer and out the valve.
This burping process would continue until the system were at the desired pressure.
At that time, the current cooling mode could be continued or the system could be placed in the RHR cooling mode if at the appropriate pressure for RHR operation.
Note that a gas bubble cannot be located in the steam generator with the reactor coolant pumps r'unning.
If a gas bubble forms in the steam generator during natural circulation, the reactor coolant pumps could be turned back on for degassing (if available) or safety injection flow could be initiated with the power operated relief valve open (if control air is available).