05000315/LER-1979-040-03, /03L-0 on 790726:during Moderator Coefficient Test,Reactor Power Decreased from 79% to 58% in 43 Minutes. Iodine Isotopic Analysis Not Performed in Required Time. Caused by Poor Communication Between Operator & Supervisor

From kanterella
(Redirected from ML17317B496)
Jump to navigation Jump to search
/03L-0 on 790726:during Moderator Coefficient Test,Reactor Power Decreased from 79% to 58% in 43 Minutes. Iodine Isotopic Analysis Not Performed in Required Time. Caused by Poor Communication Between Operator & Supervisor
ML17317B496
Person / Time
Site: Cook 
Issue date: 07/26/1979
From: Rischling J
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML17317B495 List:
References
LER-79-040-03L, LER-79-40-3L, NUDOCS 7908290439
Download: ML17317B496 (2)


LER-1979-040, /03L-0 on 790726:during Moderator Coefficient Test,Reactor Power Decreased from 79% to 58% in 43 Minutes. Iodine Isotopic Analysis Not Performed in Required Time. Caused by Poor Communication Between Operator & Supervisor
Event date:
Report date:
3151979040R03 - NRC Website

text

I REGULATO INFORMATION D5STRjtBUTION ~STEM (RIDS) oS/22 ACQESS ION NBR: 7908290439 DOC, DATE: ~~c%

NOTARIZED:

NO DOCKET FACIE b0 315 Donald C,

Cook Nuclear Power Planti Unit ii Indiana L

,05000315 AUTH)NAME'UTHOR AFFILIATION RISCHLING<J ~ L ~

Indiana 8 Michigan Power Co, RECIPRNAME RECIPIENT AFFILIATION Region 3r ChicagoE Office of the Director

SUBJECT:

LER 79-040/03L 0

on 790726:during moderator coefficient test reactor power 'decreased from 79 to 58% in 34 minutes, Iodine isotopic analysis not performed within required time, Caused by lack communication between operator 8 supervisor.

DISTRIBUTION CODE:

AOOES COPIES RECEIVED:LTR / ENCL L

SIZE:

TITLE: INCIDENT REPORTS aPqWN

~ '

~

~et r ~

~ em~

~eeSR" REC IP IENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL ACTION:

05 BC ~~~ ~/

4 INTERNAL:

REG FI 0

14 TA/EDO 16 EEB 18 PLANT SYS BR 20 AD PLANT SYS 23 ENGR BR 25 PWR SYS BR 27 OPERA LIC BR 29 AUX SYS BR HANAUERpS ~

TMI H STREET 1

1 2

2 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 02 NRC PDR 11 MPA 15 NOVAK/KNIEL 17 AD FOR ENGR 19 ILC SYS BR 22 REAC SAFT BR 24 KREGER 26 AD/SITE ANAL 28 ACDENT ANLYS E, JORDAN/IE STS GROUP LEADR 1

1 3

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 EXTERNAL: 03 LPDR 29 ACRS 1

1 16 16 04 NSIC JUG 3 0 1979 Q(

s/

TOTAL NUMBER OF COPIES REQUIRED:" LTTR ~

ENCL

1'"

~ '

0 P

t f

I

'4 7

f f4 1,

1 I,

1 4

I' f

]

~

1

\\

p, 1l

)'~

g< ~ y j'o i" y

~

J

~ '4 I

,I I

Il(<

l 4t 4

il

~ p II d

. 'Wl

'1

- r maes <<t>>

~

I I

'I