ML17317A952

From kanterella
Jump to navigation Jump to search
Forwards Copy of Response to App a Branch Technical Position 9.5-1 as Requested in 760716 & s.W/Encl Proposed Tech Spec for Fire Protection Sys for Unit 1 as Requested in
ML17317A952
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 01/31/1977
From: Tillinghast J
INDIANA MICHIGAN POWER CO.
To: Rusche B
Office of Nuclear Reactor Regulation
Shared Package
ML17317A953 List:
References
FOIA-79-12, FOIA-79-A-2 NUDOCS 7902260479
Download: ML17317A952 (2)


Text

Attachment 2 tq AHP:NRC:0692BB ISN OWER CCNPANY LETTEREGM)

I January 31, 1977 Donald C. Cook NucLear Plant Docket No. 50-315 and Ho. 50-316 DPR Ho.

58 and CPPR No. 61 iU:. Benard C. Rusche, Director Office of Nuclear Reactor Regulation U.S.:nuclear Regulatory Commission Washington, D.C.

20555 Dear Mr. Ruschec In our August 9, 1976 letter, ve inforand you that we would file a submittal supplying the infor;,ation you requested in your July 16 and July 30, 1976 letters, pertaining to fire protection far both Units 1 and 2 of the Donald c.

Cook Nuclear Plant hy January 31, 1977.

You requested that we conduct an exanination comparing the existing fire protection prograa at Q:e Cook Nuclear plant to the guidelines of the Branch Te"hnical Position APCSB 9.5-1.

Your September 30, 1976 letter trans-rd.tted to us Appendix A to Branch Technical Position 9.5-1 and requested that, we respond to this Appendix in conducting the rc-evaluation of our fire protection program.

With this letter we are transmitting a copy of our response to A~pendix A Branch Technical Position 9.5-1.

Under separate

cover, we have mailed 39 additional copies.

Your SepterMr 30, 1976 letter requested that ve yrovide you with a date when ve intended to meet Section B of Appendix A, Administrative Procedures, Controls and d'ire

~

~

~

,Brigade.

The Cook Nuclear Plant is already in caap).iance with all of the guidelines of Section B of Appendix A except guideline"

3. (c), procedures for which vill be established by July 31, 1977.

'r

Hr Senard C, Rusche January 31, 1977

hlso, as rogues,ted by your September 30, letter, we are suhai.tting herewith proposed Technical Specifications for fire protection systems for Unit l of the Cook Nuclear plant.

The sample Technical Specificati.ons in your December 2, 1976 letter were used as guidance in developing these Technical Specifications.

fire protection Technical Specifications for Unit 2 will be sub-ILitted with the caaplete proposed Technical Specifications for Unit 2.

Very truly yours.

Vice President Sworn and subscribed to before rae on this 31st day ot January, 1977 in New York County, New York jigH.!~

Motary Public DAVIDG. fR>fE HOYARY PUbLIC, sa' os "ea Yorh

.4o. 3L-L608LL3 Qualiiied in New fa:t C=enty Commissron fxssires March 30, I)U I

cc b O. Charno ff P. N. Steketee R. J. Uollen R. C. Callen R. Nalsh R. %. Jurgensan - Bridgman

. R. 8. Hunter