ML17313A898
| ML17313A898 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 04/26/1999 |
| From: | Stephen Dembek NRC (Affiliation Not Assigned) |
| To: | James M. Levine ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| Shared Package | |
| ML17313A899 | List: |
| References | |
| TAC-MA5248, TAC-MA5249, TAC-MA5250, NUDOCS 9904280202 | |
| Download: ML17313A898 (8) | |
Text
1
~R RE00
~4 0
'Cl ClO I
C 0
+~
'O
++*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 205SI001 April 26, 1999 Mr. James M. Levine Senior Vice President, Nuclear Arizona Public Service Company Post Office Box 53999 Phoenix, AZ 85072-3999
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION - APPROVAL OF INSERVICE INSPECTION RELIEF REQUESTS 11 AND 12 (TAC NOS.
MA5248, MA5249 AND MA5250)
Dear IVlr. Levine:
By letters dated April20 and 21, 1999, Arizona Public Service Company (APS) submitted Relief Requests Nos. 11 and 12 for the second 10-year inservice inspection interval for the Palo Verde Nuclear Generating Station, Units 1, 2, and 3. APS requested the use of alternatives to certain 10 CFR 50.55a(g) requirements pursuant to 10 CFR 50.55a(a)(3)(i).
The NRC staff has reviewed the requests and our evaluation is provided in the enclosed safety evaluation.
Relief Request No. 11 requests approval to use an alternative to IWA-5242(a) of Section XI to the American Society of Mechanical Engineers Code, which requires that insulation be removed from pressure-retaining bolted'connections during the pressure test of systems borated for reactivity control. The proposed alternative would allow insulation removal and visual examination of the bolted connections to be'done earlier in the refueling outage while the system is depressurized.
Relief Request No. 12 requests approval to use an alternative to IWA-5250(a) which requires that bolting be removed and visually inspected when leakage is detected at a bolted connection during the conduct of the system pressure test. The proposed alternative would allow an evaluation of other factors concerning the leakage joint as a possible alternative to disassembly and visual examination of the bolting.
I y(oh 9904280202 990426 PDR ADOCK 05000528 P
l
April 26, 1999 J.
M. Levine 2
The staff finds that the proposed alternatives provide an acceptable level of quality and safety and hereby authorizes the proposed alternatives in Relief Requests Nos. 11 and 12 pursuant to 10 CFR 50.55a(a)(3)(i) for the second 10-year inservice inspection interval.
Ifyou have any questions, please contact Mel Fields at (301) 415-3062.
Sincerely, Steve Dembek, Chief, Section 2 Project Directorate IV 8 Decommissioning Division of Licensing Project Management Offic'e of Nuclear Reactor Regulation Docket Nos. STN 50-528, STN 50-529 and STN 50-530
Enclosure:
Safety Evaluation cc w/encl: See next page DISTRIBUTION:
Doc et ile PUBLIC PDIV-2 Reading JZwolinski/S Black GHill (6)
DLange, EDO KBrockman, RIV OGC'CRS I
DOCUMENT NAME: A:WIA5248.wpd To receive a co of this document indicate in the box C=
w/o attachment/enctos e
- Co with attachment/enctosure N ~ No co OFFICE PDIV-2/PM E
PDIV-D/LA EMCB/B OGC PDIV-2/SC NAME DATE Mi ds:
W/99 CJamerson 0 / ~"/99 WBate
/ M99
/ ZZ/99 SDembek
/
/99 OFFICIALRECORD COPY Oooo
1 I',
J..M. Levine 2
The staff finds that the proposed alternatives provide an acceptable level of quality and safety and hereby authorizes the proposed alternatives in Relief Requests Nos. 11 and 12 pursuant to 10 CFR 50.55a(a)(3)(i) for the second 10-year inservice inspection interval.
Ifyou have any questions, please contact Mel Fields at (301) 415-3062.
Sincerely, Steve Dembek, Chief, Section 2 Project Directorate IV 8 Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. STN 50-528, STN 50-529 and STN 50-530
Enclosure:
Safety Evaluation cc w/encl: See next page
Mr. James M. Levine 3
cc w/encl:
Mr. Steve Olea Arizona Corporation Commission 1200 W. Washington Street
'hoenix, Arizona 85007 Douglas Kent Porter Senior Counsel Southern California Edison Company Law Department, Generation Resources P.O. Box 800
- Rosemead, California 91770 Senior Resident Inspector USNRC P. O. Box 40 Buckeye, Arizona 85326 Regional Administrator, Region IV U. S. Nuclear Regulatory Commission Harris Tower & Pavillion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Chairman, Board of Supervisors ATTN: Chairman 301 W. Jefferson, 10th Floor Phoenix, Arizona 85003 Mr. David Summers Public Service Company of New Mexico 414 Silver SW, ¹1206 Albuquerque, New Mexico 87102 Mr. Jarlath Curran Southern California Edison Company 5000 Pacific Coast Hwy Bldg.DIN San Clemente, California 92672 Mr. Robert Henry Salt River Project 6504 East Thomas Road Scottsdale, Arizona 85251 Terry Bassham, Esq, General Counsel EI Paso Electric Company 123 W. Mills El Paso, Texas 79901 Mr. John Schumann Los Angeles Department of Water & Power Southern California Public Power Authority P.O. Box 51111, Room 1255-C Los Angeles, California 90051 Mr. Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 South 40 Street Phoenix, Arizona 85040 Ms. Angefa K. Krainik, Manager Nuclear Licensing Arizona Public Service Company P.O. Box 52034
'hoenix, Arizona 85072-2034
~
Mr. John C. Horne, Vice President Power Generation El Paso Electric Company P.O, Box 982 El Paso, Texas 79960
I