ML17313A523
| ML17313A523 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 08/06/1998 |
| From: | Zell L ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML17313A524 | List: |
| References | |
| IA-98-016, IA-98-16, NUDOCS 9808110181 | |
| Download: ML17313A523 (5) | |
Text
0 CATEGORY 2 ~
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
DOCKET 05000528 05000529 05000530
SUBJECT:
Responds to NRC 980710 ltr re violations noted in investigation repts 4-97-022S 6 4-1998-014.Corrective actions: conducted presentations
&, discussions of incident w/Palo Verde SRO licensed personnel
& personnel in training.
DISTRIBUTION CODE:
IEOID COPIES RECEIVED:LTR g ENCL
(
SIZE: +
7 TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response ACCESSION NBR:9808110181 DOC.DATE: 98/08/06 NOTARXZED: NO FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi AUTH.NAME AUTHOR AFFILIATION ZELL,L.C.
Arizona Public Service Co.
(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)
NOTES: STANDARDIZED PLANT Standardized plant.
Standardized plant.
050005280 05000529 05000530/
~RECIPZENT XD CODE/NAME PD4-2 PD INTERNAL: ACRS AEOD NRR/DRPM/PECB NUDOCS-ABSTRACT OGC/HDS2 EXTERNAL: LZTCO BRYCE,J H NRC PDR COPXES LTTR ENCL 1
'1 2
2 1
1 1
1 1
1 1
1 1
1 1
1 1
1 RECZPXENT XD CODE/NAME FIELDS,M AEOD/SPD/RAB DEDRO NRR/DRCH/HOHB NRR/DRPM/PERB OE DIR RGN4 FILE 01 NOAC NUDOCS FULLTEXT COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 D
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTc OR REDUCE THE. NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 19 ENCL 19
Leo C. Zell Arizona Public Service Company PO Box 52034, MS 7605 Phoenix, Arizona 85072-2034 August 6, 1998 US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
Reference:
NRC letter dated July 10, 1998, NOTICE OF VIOLATION(NRC Investigation Report Nos. 4-97-022S and 4-1 998-014)
Dear Sirs:
Subject:
REPLY TO A NOTICE OF VIOLATION(IA98%16, Docket No. 55-50234, License No. SOP-50274-1)
Enclosed is my response to the Notice of Violation sent under your cover letter dated July 10, 1998.
Sincerely, Leo C. Zell cc:
Regional Administrator US Nuclear Regulatory Commission, Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011 9808iiOi8i 98080b PDR
- ADQCK 05000528 8
REPLY TO A NOTICE OF VIOLATION This willrespond to the Notice ofViolation ("NOV")sent under your cover letter ofJuly 10, 1998.
The reason for the violation, the corrective steps taken, and the corrective steps taken to avoid further violations have been previously addressed in my testimony to the OQice ofInvestigations, in my testimony and written statements provided to the Nuclear Regulatory Commission ("NRC")
at the March 31, 1998 Arizona Public Service Company ("APS") pre-decisional enforcement conference, in statements I have made to APS during its investigation into this matter, and in a statement I provided to the NRC on-April 15, 1998. I respectfully refer the NRC to these materials in response to the NOV.
Attached hereto'is a redacted copy ofmy April 15, 1998 Declaration, which has previously been provided to the NRC in unredacted form. I request that the redacted portions ofmy April 15 Declaration be withheld &omthe copy placed in the Public Document Room. The redactions relate to my salary information and other personal details ofthe disciplinary action that APS has taken against me. This is highly personal and private information that should not be made public.
Finally, in further response to the NOV,I have now completed additional corrective actions relating to this matter. In particular, I have conducted presentations and discussions ofthis incident with Palo Verde SRO licensed personnel and personnel in training to obtain RO and SRO licenses.
These presentations were completed July 31, 1998. I have also conducted similar presentations with personnel Rom the followingdepartments: Nuclear Regulatory Affairs, Nuclear Training, Procurement, Financial, Fire Protection and Outage/Scheduling.
Making these presentations has had a large impact on me. Moreover, based upon the feedback I have received, these briefings have had a powerful impact on those who have attended them. The briefings have permitted others to learn from our mistake better than any other method of communication could possibly have done. The presentations that we have planned have been concluded; however, we willcontinue to give presentations ifthey are requested in the future. In sum, the corrective actions related to this matter have been completed.
I declare under penalty ofperjury that the foregoing is true and correct.
August 1998 eo Charles Zell 204717 vl