ML17312B545
| ML17312B545 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 06/27/1997 |
| From: | Gwynn T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | James M. Levine ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| Shared Package | |
| ML17312B546 | List: |
| References | |
| 50-528-97-06, 50-528-97-6, 50-529-97-06, 50-529-97-6, 50-530-97-06, 50-530-97-6, NUDOCS 9707080370 | |
| Download: ML17312B545 (10) | |
See also: IR 05000528/1997006
Text
CATEGORY 2
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
DOCKET g
05000528
05000529
05000530
SUBJECT:
Forwards insp repts
50-528/97-06,50-529/97-06
6 50-530/97-06
on 970504-0614
& NOV.
DISTRIBUTION CODE:
IEOIF
COPIES
RECEIVED: LTR J
ENCL I
SIZE: Q'F I 7
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
CCESSION NBR:9707080370
DOC.DATE: 97/06/27
NOTARIZED: NO
ACIL:STN-50-528 Palo Verde Nuclear Station,
Unit 1, Arizona Publi
STN-50-529 Palo Verde Nuclear Station,
Unit 2, Arizona Publi
STN-50-530 Palo Verde Nuclear Station,
Unit 3, Arizona Publi
AUTH.NAME
AUTHOR AFFILIATION
GWYNN,T.P.
Region
4 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
LEVINE,J.M.,
Arizona Public Service
Co. (formerly Arizona Nuclear
Power
NOTES:STANDARDIZED PLANT
Standardized
plant.
Standardized
plant.
RECIPIENT
ID CODE/NAME
PD4-2
INTERNAI: ACRS
NRR/DRCH/HHFB
NRR/DRPM/PERB
OE DIR
RGN4
FILE
01
EXTERNAL: LITCO BRYCE,J
H
NRC PDR
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
THOMAS,K
AEOD/SPD/RAB
DEDRO
NRR/DISP/PIPB
NRR/DRPM/PECB
NUDOCS-ABSTRACT
OGC/HDS2
NOAC
NUDOCS FULLTEXT
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
05000528
E
05000529
05000530
0
'
D
0
I.OADED FROM
NRC FLOPPY
N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS
OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL
DESK
(DCD)
ON EXTENSION 415-2083
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
20
ENCL
20
1PR REGS
0
Cy
oO
I
0
Pp
/4,
+~*~0
UNITEDSTATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZA DRIVE, SUITE 400
ARLINGTON,TEXAS 76011-6064
June 27,
1997
James
M. Levine, Senior Vice
President,
Nuclear
Arizona Public Service Company
P,O. Box 53999
Phoenix, Arizona 85072-3999
SUBJECT:
NRC INSPECTION REPORT 50-528/97-06; 50-529/97-06'0-530/97-06
AND
Dear Mr. Levine:
An.NRC inspection was conducted May 4 through June 14, 1997, at your Palo Verde
Nuclear Generating Station, Units 1, 2, and 3 reactor facilities. The enclosed report
presents the scope and results of that inspection.
During the 6-week period covered by this inspection, your conduct of activities at the Palo
Verde facility was generally characterized
by safety conscious operations,
sound
engineering
and maintenance
practices,
and careful radiological controls; however,
a
violation of NRC requirements
occurred.
The violation involved three examples of
operations personnel failing to follow administrative requirements.
The violation is cited in the enclosed
Notice of Violation (Notice) and the circumstances
surrounding the violation are described
in detail in the enclosed report.
The NRC has
concluded that information regarding the reason for the violation, the corrective actions
taken and planned to correct the violation and prevent recurrence
are already adequately
addressed
on the docket in the enclosed inspection report.
Therefore, you are not required
to respond to this letter unless the description therein does not accurately reflect your
corrective actions or your position.
In that case, or if you choose to provide additional
information, you should follow the instructions specified in the enclosed
Notice.
Should you have any questions concerning this inspection, we will be pleased to discuss
them with you.
Sincerely,
Thomas
P. Gwynn, Director
Division of Reactor Projects
9707080370
970627
ADQCK 05000528
8
llillllllllllllllllll/IIIIIIIIIII
Arizona Public Service Company
-2-
Docket Nos.:
50-528
50-529
50-530
License'os.:
NPF-51
Enclosures:
2.
NRC Inspection Report
50-528/97-06; 50-529/97-06; 50-530/97-06
cc w/enclosures:
Mr. Steve Olea
Arizona Corporation Commission
1200 W. Washington Street
Phoenix, Arizona 85007
Douglas K. Porter, Senior Counsel
Southern California Edison Company
Law Department, Generation Resources
P.O. Box 800
Rosemead,
California 91770
Chairman
Maricopa County Board of Supervisors
301 W. Jefferson,
10th Floor
Phoenix, Arizona 85003
Aubrey V. Godwin, Director
Arizona Radiation Regulatory Agency
4814 South 40 Street
Phoenix, Arizona 85040
Angela K. Krainik, Manager
Nuclear Licensing
Arizona Public Service Company
P.O. Box 52034
Phoenix, Arizona 85072-2034
John C. Horne, Vice President
Power Supply
El Paso Electric Company
2025 N. Third Street, Suite 220
Phoenix, Arizona 85004
Arizona Public Service Company
-3-
Terry Bassham,
Esq.
General Counsel
EI Paso Electric Company
123 W. Mills
El Paso, Texas
79901
Mr. Robert Burt
Los Angeles Department of Water
Bc Power
Southern California Public Power Authority
111 North Hope Street, Room 1255-B
Los Angeles, California 90051
Mr. David Summers
Public Service Company of New Mexico
Albuquerque, New Mexico 87102
Mr. Brian Katz
Southern California Edison Company
14300 Mesa Road, Drop D41-SONGS
San Clemente, California 92672
Mr. Robert Henry
Salt River Project
6504 East Thomas Road
Scottsdale,
Arizona 85251
i
Arizona Public Service Company
-4-
report to T. Boyce (THB)
report to NRR Event Tracking System (IPAS)
report to Document Control Desk (DOCDESK)
report to Richard Correia (RPC)
report to Ronald Frahm, Jr. (RKF)
bcc to DCD (IE01)
bcc distrib. by RIV:
Regional Administrator
DRP Director
Branch Chief (DRP/F, WCFO)
Senior Project Inspector (DRP/F, WCFO)
Branch Chief (DRP/TSS)
WCFO File
Resident Inspector
DRS-PSB
MIS System
RIV File
M. Hammond (PAO, WCFO)
DOCUMENT NAME: R:5 PV<PV706RP.DMO
To receive copy of document, indicate In box: "C" = Copy without enciosures
"E" = Copy with enciosures
"N"= No copy
RIV:RI
DMOrsini
6
/97
C:DRP/F
DFKirsch
6
/97
D:DRP
D:WCFO
KEPerkins
TPGwy
6/
97
6Q /97
OFFICIAL
ECORD COPY