ML17312B461

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-528/97-05,50-529/97-05 & 50-530/97-05 on 970323-0503 & Notice of Violation
ML17312B461
Person / Time
Site: Palo Verde  
Issue date: 05/20/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: James M. Levine
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17312B462 List:
References
50-528-97-05, 50-528-97-5, 50-529-97-05, 50-529-97-5, 50-530-97-05, 50-530-97-5, NUDOCS 9706020017
Download: ML17312B461 (10)


See also: IR 05000528/1997005

Text

CATEGORY 2

'EGULATORY

INFORMATION DISTRIBUTION SYSTEM (RIDS)

1

ACCESSION NBR:970

ACIL:STN-50-528

STN-50-529

STN-50-530

AUTH.NAME

G'rUYNN,T. P.

RECiP.NAME

LE'v' NE J

M ~

6020017

DOC.DATE: 97/05/20

NOTARIZED:

NO

DOCKET

Palo Verde Nuclear Station,

Unit 1, Arizona Publi

05000528

Palo Verde Nuclear Station,

Unit 2, Arizona Publi

05000529

Palo Verde Nuclear Station,

Unit 3, Arizona Publi

05000530

AUTHOR AFFILIATION

Region

4 (Post

820'201)

RECIPIENT AFFILIATION

Arizona Public Service

Co.

(formerly Arizona Nuc'ear

Power

SUBJECT:

Forwards

insp repts

50-528/97-05,50-529/97-05

& 50-530/97-05

on

970323-. 0503

& notice of violation.

e

DISTRIBUTION CODE: IEOIF

COPIES

RECEIVED:LTR

t

ENCL

(

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

C

NOTES:STANDARDIZED PLANT

Standardized

plant.

Standardized

plant.

05000528

05000529

05000530

RECIPIENT

ID CODE/NAME

PD4-2

PD

INTERNAL: ACRS

LE CENTER

NR

. HP

NRR/DRPM/PERB

OE DIR

RGN4

=FILE

01

EXTERNAL: LITCO BRYCE,J

H

NRC

PDR

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

CLIFFORDFJ

AEOD/SPD/RAB

DEDRO

NRR/DISP/PIPB

NRR/DRPM/PECB

NUDOCS-ABSTRACT

OGC/HDS2

NOAC

NUDOCS FULLTEXT

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

D

0

LOADED PRO;";

I ~ NRG FLGPPY

E

N

t

NOTE TO ALL "RIDS" RECIPZENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRZBUTION LISTS

OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANZZATION, CONTACT THE DOCUMENT CONTROL

DESK

(DCD)

ON EXTENSION 415-2083

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

20

ENCL

.20

4

I

I

l

,I

~gg RECT

Wp0

n

e

t

q'"

I

~o

)tp*~ +

UN IT E D STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON,TEXAS 76011 8064

May 20, 1997

James

M. Levine, Senior Vice

President,

Nuclear

Arizona Public Service. Company

P.O. Box 53999

Phoenix, Arizona 85072-3999

SUBJECT:

NRC INSPECTION REPORT 50-528/97-05; 50-529/97-05; 50-530/97-05 AND

NOTICE OF VIOLATION

Dear Mr. Levine:

An NRC inspection was conducted

March 23 through May 3, 1997, at your Palo Verde

Nuclear Generating Station, Units 1, 2, and 3 reactor facilities. The enclosed report

presents

the scope and results of that inspection.

During the 6-week period covered by this inspection, your conduct of activities at the Palo

Verde facility was generally characterized

by safety conscious operations,

sound

engineering

and maintenance

practices,

and careful radiological controls.

However, two

violations of NRC requirements

occurred.

The first violation involved two examples where

electrical maintenance

personnel

did not follow a cable installation specification when

performing corrective maintenance.

The second violation involved the failure to assure that

appropriate quality standards

were specified in the plant database

for penetrations

in

barriers performing safety related functions.

These violations are cited in the enclosed

Notice of Violation (Notice) and the

circumstances

surrounding the violations are described

in detail in the enclosed report.

Please note that you are required to respond to this letter and should follow the

instructions specified in the enclosed

Notice when preparing your response.

The NRC will

use your response,

in part, to determine whether further enforcement

action is necessary

to ensure compliance with regulatory requirements.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of this letter,

its enclosures,

and your response

will be placed in the NRC Public Document Room (PDR).

To the extent possible, your response

should not include any personal privacy, proprietary,

or safeguards

information so that it can be placed in the PDR without redaction.

9706020017

'iI70520

PDR

ADQCK 05000528

8

PDR

IIIIIIIIIIIIIIIIIIIIllllllllllllllllllll

Arizona Public Service

-2-

Should you have any questions

concerning this inspection, we will be pleased to discuss

them with you.

Sincerely,

Thomas

P. Gwynn, Director

Division of Reactor Projects

Docket Nos.:

50-528

50-529

50-530

License Nos.:

NPF-41

NPF-51

NPF-74

Enclosures:

1.

Notice of Violation

2.

NRC Inspection Report

50-528/97-05; 50-529/97-05; 50-530/97-05

cc w/enclosures:

Mr. Steve Olea

Arizona Corporation Commission

1200 W. Washington Street

Phoenix, Arizona 85007

Douglas K. Porter, Senior Counsel

Southern California Edison Company

Law Department,

Generation

Resources

P.O. Box 800

Rosemead,

California 91770

Chairman

Maricopa County Board of Supervisors

301 W. Jefferson,

10th Floor

Phoenix, Arizona 85003

Aubrey V. Godwin, Director

Arizona Radiation Regulatory Agency

4814 South 40 Street

Phoenix, Arizona 85040

Arizona Public Service

-3-

Angela K. Krainik, Manager

Nuclear Licensing

Arizona Public Service Company

P.O. Box 52034

Phoenix, Arizona 85072-2034

John C. Horne, Vice President

Power Supply

EI Paso Electric Company

2025 N. Third Street, Suite 220

Phoenix, Arizona 85004

Terry Bassham,

Esq.

General Counsel

EI Paso Electric Company

123 W. Mills

El Paso, Texas

79901

Mr. Robert Burt

Los Angeles Department of Water & Power

Southern California Public Power Authority

111 North Hope Street, Room 1255-B

Los Angeles, California 90051

Mr. David Summers

Public Service Company of New Mexico

414 Silver SW, ¹0604

Albuquerque,

New Mexico 87102

Mr. Brian Katz

Southern California Edison Company

14300 Mesa Road, Drop D41-SONGS

San Clemente, California 92672

Mr. Robert Henry

Salt River Project

.6504 East Thomas Road

Scottsdale,

Arizona 85251

0

-4-

E-Mail report to T. Boyce (THB)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bcc to DCD IE01

bcc distrib. by RIV:

Regional Administrator

DRP Director

Branch Chief (DRP/F, WCFO)

Senior Project Inspector (DRP/F, WCFO)

Branch Chief (DRP/TSS)

WCFO File

Resident Inspector

DRS-PSB

MIS System

RIV File

M. Hammond (PAO, WCFO)

DOCUMENT NAME: R:i PViPV705RP.KEJ

To receive copy of document,

indicate in box: "C" = Copy witho t en

osu es

"E" = Copy with enctosures

"N" = No copy

RIV:RI:DRP/F

KEJohnsto

05// /97

C:DRP/F

DFKirsch

05/ /97

D:DRP

D:WCFO

TPG

nn

0

/97

KEPer kin

05gg97

OFFICIAL RECORD COPY

05/ /97