ML17312B181

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-528/96-17,50-529/96-17 & 50-530/96-17 on 961117-1228 & Notice of Violation
ML17312B181
Person / Time
Site: Palo Verde  
Issue date: 01/14/1997
From: Dyer J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: James M. Levine
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17312B182 List:
References
NUDOCS 9701210443
Download: ML17312B181 (11)


See also: IR 05000528/1996017

Text

CATEGORY 2

REGULATORY INFORMATION DISTRIBUTION SYSTEM

(RZDS)

ACCESSION NBR:970

FACIL:STN-50-528

STN-50-529

STN-50-530

AUTH.NAME

DYERiJ.E.

RECIP.NAME

LEVINE,J.M.

DOCKET I

05000528

05000529

05000530

1210443

DOC.DATE: 97/01/14

NOTARIZED: NO

Palo Verde Nuclear Station, Unit 1, Arizona Publi

Palo Verde Nuclear Station, Unit 2, Arizona Publi

Palo Verde Nuclear Station, Unit 3, Arizona Publi

AUTHOR AFFILIATION

Region

4 (Post

820201)

RECIPIENT AFFILIATION

Arizona, Public Service

Co. (formerly Arizona Nuclear

Power

SUBJECT: Forwards insp repts

50-528/96-17,50-529/96-17

a 50-530/96-

17 on 961117-1228

a notice of violation.

DISTRIBUTION CODE:

ZE01D

COPIES

RECEIVED:LTR

J

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Vino ation Response

NOTES:STANDARDIZED PLANT

Standardized

plant.

Standardized

plant.

Sw 3S

05000528

05000529

05000530

0

RECIPIENT

ID CODE/NAME

PD4-2

PD

INTERNAL: ACRS

FILE CENTER

FB

NRR/DRPM/PERB

OE

DZR

RGN4

FILE

01

EXTERNAL: LITCO BRYCE,J

H

NRC PDR

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

CLIFFORD,J

AEOD/SPD/RAB

DEDRO

NRR/DISP/PIPB

NRR/DRPM/PECB

NUDOCS-ABSTRACT

OGC/HDS2

. NOAC

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1'

1

D

0

E

NOTE TO ALL "RIDS" RECIPIENTS:

e

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATIONREMOVED FROM DISTRIBUTION LISTS

OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION

CONTACT THE DOCUMENT CONTROL

DESK

(DCD)

ON EXTENSION 415-2083

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

19

ENCL

19

<gAS AECOC

Wp

+

0

+~

~O

+**<<+

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZADRIVE,SUITE 400

ARLINGTON,TEXAS 76011.8064

January

14, 1997

James

M. Levine, Senior Vice

President,

Nuclear

Arizona Public Service Company

P.O. Box 53999

Phoenix, Arizona 85072-3999

SUBJECT:

NRC INSPECTION REPORT 50-528/96-17; 50-529/96-17; 50-530/96-17 AND

NOTICE OF VIOLATION

Dear Mr. Levine:

An NRC inspection was conducted

November 17 through December 28, 1996, at your

Palo Verde Nuclear Generating Station, Units 1, 2, and 3 reactor facilities. The enclosed

report presents the scope and results of that inspection.

During the 6-week period covered by this inspection, your conduct of activities at the Palo

Verde facility was generally characterized

by safety conscious operations,

sound

engineering

and maintenance

practices, and careful radiological controls.

However, three

violations of NRC requirements

occurred.

One violation involved three examples of failure

to follow procedures.

One example involved the failure of operations to manually input an

alarm into the safety equipment status system when one emergency'core

cooling system

train was made inoperable for testing.

The two additional examples involved failure to

follow procedures

during the installation of a temporary restraining device on the shaft of a

reactor coolant pump during the Unit 1 refueling outage.

Although the installation of the

restraining device was supervised

by the mechanical maintenance

engineering organization,

It was not described by work instructions and was not adequately covered under an

equipment clearance.

The second violation included two examples of failure to follow written instructions.

In

one example, maintenance

and operations failed to adequately discuss

and implement the

requirements

of a charging pump seal leakoff drain system test.

As a result, a significant

amount of water entered the crankcase

oil of a charging pump, placing it in a degraded

condition.

In the second example, workers failed to implement the requirements

of a

piping design specification to verify pipe support to piping clearance.

The third violation

involved the failure of an escort to comply with requirements to maintain control of his

visitor inside a plant vital security area.

We are concerned that these situations regarding

failure to follow procedures

represents

a recent decline in your performance

in this area

and urge your continued attention to improve performance.

During this inspection period there were three problem situations which were not

documented

in a timely manner using your corrective action program method.

Over the

past year, the staff at Palo Verde has earned

a reputation for being diligent at identifying

problems and performing thorough evaluations

of. significant issues.

We are concerned

970iei0443 970ii4

PDR

ADOCK 05000528

8

PDR

V

Arizona Pub1ic Service

Company

-2-

that the problem identification and resolution issues

in this report appear to indicate a

degrading trend and urge your continued attention to improve performance

in this

important area.

These violations are cited in the enclosed

Notice of Violation (Notice) and the

circumstances

surrounding the violations are described

in detail in the enclosed report.

Please note that you are required to respond to this letter and should follow the

instructions specified in the enclosed

Notice when preparing your response.

The NRC will

use your response,

in part, to determine whether further enforcement action is necessary

to ensure compliance with regulatory requirements.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter,

its enclosure(s),

and your response

will be placed in the NRC Public Document Room

(PDR). To the extent possible, your response

should not include any personal privacy,

proprietary, or safeguards

information so that it can be placed in the PDR without

redaction.

Should you have any questions concerning this inspection, we will be pleased to discuss

them with you.

Sincerel,

J. E. Dyer, Director

Division of Reactor Projects

Docket Nos.:

50-528

50-529

50-530

License Nos.:

NPF-41

NPF-51

NPF-74

Enclosures:

1.

Notice of Violation

2.

NRC Inspection Report

50-528/96-1 7; 50-529/96-1 7; 50-530/96-1 7

cc w/enclosures:

Mr. Steve Olea

Arizona Corporation Commission

1200 W. Washington Street

Phoenix, Arizona 85007

Arizona Pub1ic Service

Company

-3-

Douglas K. Porter, Senior Counsel

Southern California Edison Company

Law Department, Generation

Resources

P.O. Box 800

Rosernead,

California 91770

Chairman

Maricopa County Board of Supervisors

301 W. Jefferson,

10th Floor

Phoenix, Arizona 85003

Aubrey V. Godwin, Director

Arizona Radiation Regulatory Agency

4814 South 40 Street

Phoenix, Arizona 85040

Angela K. Krainik, Manager

Nuclear Licensing

Arizona Public Service Company

P.O. Box 52034

Phoenix, Arizona 85072-2034

John C. Horne, Vice President

Power Supply

Palo Verde Services

2025 N. Third Street, Suite 220

Phoenix, Arizona 85004

Mr. Robert Burt

Los Angeles Department of Water tk Power

Southern California Public Power Authority

111 North Hope Street, Room 1255-B

Los Angeles, California 90051

Mr. David Summers

Public Service Company of New Mexico

414 SilverSW, 40604

Albuquerque,

New Mexico 87102

Mr. Brian Katz

Southern California Edison Company

14300 Mesa Road, Drop D41-SONGS

San Clemente, California 92672

I

l'

Arizona Pub1ic Service

Company

Mr. Robert Henry

Salt River Project

6504 East Thomas Road

Scottsdale,

Arizona 85251

l

-5-

E-Mail report to T. Boyce (THB)

E-Mail report to NRR Event Tracking System (IPAS)

'bcc to DMB '(IE01)~~

bcc distrib. by RIV:

L, J. Callan

DRP Director

Branch Chief (DRP/F, WCFO)

Senior Project Inspector (DRP/F, WCFO)

Branch Chief (DRP/TSS)

Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

Resident Inspector

DRS-PSB

MIS System

RIV File

M. Hammond (PAO, WCFO)

WCFO File

DOCUMENT NAME: R:i PV617RP.KEJ

To receive copy of document, indicate in box: "C" = Copy without enclosures

"E" =

Copy with enclosures

"N" = No copy

RIV:RI:

RP/F

KEJohn

o

01/ /97

C:DRP/F

DFKirsch

01// /97

D:WCFO

KEP rkins

01

/97

D:DRP

JEDyer

01

97

~1004'd/

l