ML17312A892
| ML17312A892 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 07/26/1996 |
| From: | Dyer J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Stewart W ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| Shared Package | |
| ML17312A893 | List: |
| References | |
| NUDOCS 9608060095 | |
| Download: ML17312A892 (10) | |
See also: IR 05000528/1996011
Text
CATEGORY 2
SUBJECT:
Forwards insp repts 50-528/96-11,50-529/96-11
& 50-530/96-11
on 960602-0713
6 NOV.Violations represent
common practice
for janitorial staff performing work at plant protected
area
access
a practice
accepted
by plant security.
DISTRIBUTION CODE:
IEOID
COPIES
RECEIVED:LTR
I
ENCL 1
SIZE:
t 0 2-Z-
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
E-
Q
05000528
05000529
05000530
R
NOTES: STA'JDARDIZED PLANT
Standardized
plant.
Standardized
plant.
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
CCESSION NBR:9608060095
DOC.DATE: 96/07/26
NOTARIZED:
NO
DOCKET I
CIL:STN-50-528 Palo Verde Nuclear Station,
Unit 1, Arizona Publi
05000528
STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi
05000529
STN-50-530 Palo Verde Nuclear Station,
Unit 3, Arizona Publi
05000530
AUTH.NAME
AUTHOR AFFILIATION
DYER,J.E.
Region
4 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
STEWART,W.L.
Arizona Public Service
Co. (formerly Arizona Nuclear
Power
RECIPIENT
ID CODE/NAME
PD4-2
CLIFFORD,J.
ERNAL: ACRS
AEOD/~TT.
DEFILE CENTE
NRR/DRCH HHFB
NRR/DRPM/PERB
OE DIR
RGN4
FILE
01
EXTERNAL: LITCO BRYCE,J
H
NRC
COPIES
LTTR ENCL
1
1
1
1
.2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
CLIFFORD,J
AEOD/SPD/RAB
DEDRO
NRR/DISP/PIPB
NRR/DRPM/PECB
NUDOCS-ABSTRACT
OGC/HDS2
NOAC
COPIES
LTTR ENCL
1
1
1
1
1
.
1
1
1
1
1
1
1
1
1
1
1
D
0
U
N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTEI
CONTACT THE DOCUMENT CONTROL DESK,
TO ELIMINATE YOUR NAME FROM
DISTRIBUTION LISTS
FOR
DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
20
ENCL
20
e
~gR SECOC
->~i
I
J
IP +**<<"
UNITEDSTATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZA DRIVE, SUITE 400
ARLINGTON,TEXAS 76011-8064
July 26,
1996
William L. Stewart,
Executive Vice
President,
Nuclear
Arizona Public Service
Company
P.O.
Box 53999
Phoenix,
85072-3999
SUBJECT:
NRC
INSPECTION
REPORT 50-528/9611;
50-529/9611;
50-530/9611
AND
Dear Mr. Stewart:
e
An NRC inspection
was conducted
June
2 through July 13,
1996,
at your Palo
Verde Nuclear Generating Station,
Units 1,
2,
and
3 reactor facilities.
The
enclosed
report presents
the
scope
and results of that inspection.
During the 6-week period covered
by this inspection,
your conduct of
activities at the Palo Verde facilities was generally characterized
by safety
conscious
operations,
sound engineering
and maintenance
practices,
and careful
radiological controls.
During this inspection,
the
NRC determined that two violations of NRC
requirements
occurred.
The firstviolation involved the. failure of
Instrumentation
and Controls maintenance
engineering to recognize that
a
change to the Unit 2 gualified Safety Parameter
Display System represented
a
change to the facility as described
in the safety analysis report
and to
review the change to determine
whether it represented
an unreviewed safety
question.
The second violation involved the failure of an individual to
process
themselves
and their hand carried
items through security search
equipment prior to entering the plant protected
area.
This item is of concern
since it represents
a
common practice for janitorial staff performing work at
the plant protected
area
access,
and this practice
was accepted
by plant
security.
These violations are cited in the enclosed
Notice of Violation (Notice)
and
the circumstances
surrounding
the violations are described
in detail
in the
enclosed
report.
Please
note that you are required to respond to this letter
and should follow the instructions specified in the enclosed
Notice when
preparing your response.
The
NRC will use your response,
in part, to
determine
whether further enforcement
action is necessary
to ensure
compliance
with regulatory requirements.
In accordance
with 10 CFR 2.790 of the
NRC's "Rules of Practice,"
a copy of
this letter, its enclosure(s),
and your response will be placed in the
NRC
Public Document
Room (PDR).
To the extent possible,
your response
should not
9608060095
960726
ADOCK 05000528
6
4
a
include
any personal
privacy, proprietary,
or safeguards
information so that
it can
be placed
in the
PDR without redaction.
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
Docket Nos.:
50-528
50-529
50-530
License Nos.:
NPF-51
J.
E. Dyer, Director
Division'f Reactor Projects
Enclosures:
1.
2.
NRC Inspection
Report
50-528/9611;
50-529/9611;
50-530/9611
cc w/enclosures:
Mr. Steve
Olea
Arizona Corporation
Commission
1200
W. Washington Street
Phoenix,
85007
Douglas
K. Porter,
Senior Counsel
Southern California Edison
Company
Law Department,
Generation
Resources
P.O.
Box 800
Rosemead,
91770
Aubrey V. Godwin, Director
Arizona Radiation Regulatory
Agency
4814 South
40 Street
Phoenix,
85040
Chairman
Maricopa County Board of Supervisors
111 South Third Avenue
Phoenix,
85003
1
t
Angela K. Krainik, Manager
Nuclear Licensing
Arizona Public Service
Company
P.O.
Box 52034
Phoenix,
85072-2034
John
C, Horne; Vice President
Power Supply
Palo Verde Services
2025
N. Third Street,
Suite
220
Phoenix,
85004
Mr. Roy P.
Lessy, Jr.
Akin, Gump, Strauss,
Hauer
E Feld,
L.L.P
1333
Avenue,
N.W.
Suite
400
D.C.
20036
0
E-Hail report to D. Nelson
(DJN)
E-Mail report to
NRR Event Tracking System
(IPAS)
E-Hail report to Michael Davis
(MJD1)
bcc to
DMB (IE01)
bcc distrib.
by RIV:
L. J. Callan
DRP Director
Branch Chief (DRP/F,
WCFO)
Senior Project Inspector
(DRP/F,
WCFO)
Branch Chief (DRP/TSS)
Leah Tremper
(OC/LFDCB,
MS:
TWFN 9E10)
Resident
Inspector
DRS-PSB
HIS System
RIV File
M,
Hammond
(PAO,
WCFO)
DOCUMENT NAME:
R:i PV611RPT. KEJ
'o
receive copy of document, indicate inbox: "C" ~ Copywithout enci
ures
"E" ~ Copy with enclosures "N
~ No copy
RIV:SRI: DRP/F
KEJoh
ton: jb
07/
/96
C:DRP/F
DFKirsch
07/
/96
D:WCFO
KEPerkins
07/
96
D:DRP
JEDyer
07/
/96
07/
/96
I
e
I
I