ML17312A551
| ML17312A551 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 02/23/1996 |
| From: | Dyer J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| Shared Package | |
| ML17312A552 | List: |
| References | |
| NUDOCS 9602260377 | |
| Download: ML17312A551 (10) | |
See also: IR 05000528/1995025
Text
~y,g Alger~
(4
4
0
Cy
I
o
o4;
/p
- g%
UNITEDSTATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZA DRIVE, SUITE 400
ARLINGTON,TEXAS 76011.6064
FEB 23
J996
Publ i c Ser vi ce
Company
ATTN:
William LE Stewart
Executive Vice President,
Nuclear
P.O.
Box 53999
Phoenix,
85072-3999
SUBJECT:
NRC
INSPECTION
REPORT 50-528/95-25;
50-529/95-25;
50-530/95-25
AND
This refers to the inspection
conducted
by Hr. K. Johnston
and other
inspectors
of this office on December
17,
1995,
through January
27,
1996, at
the Palo Verde Nuclear Generating Station,
Units 1,
2,
and 3, facility.
The
purpose of the inspection
was to determine
whether activities authorized
by
the license
were conducted
safely
and in accordance
with NRC requirements.
At
the conclusion of the inspection,
the findings were discussed
with you and
those
members of your staff identified in the enclosed
report.
Areas
examined during the inspection
are identified in the report.
Within
these
areas,
the inspection consisted
of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observation
of
activities in progress.
Based
on the results of this inspection,
the
NRC has determined that three
violations of NRC requirements
occurred.
These violations are cited in the
enclosed
Notice of Violation (Notice)
and the circumstances
surrounding
them
are described
in detail
in the subject inspection report.
The violations
relate to issues
identified during
a review of the essential
chilled water
system.
The review focused
on the control of chiller refrigerant
and oil
levels,
and the control of essential
chilled water leakage.
Although the
three violations relate to the
same
system,
they highlight different
programmatic
weaknesses
that were identified throughout the assessment
of the
essential
chilled water system.
Violation A concerns
the failure to identify significant changes
in chiller
refrigerant
as
a condition adverse
to quality.
We are concerned
that
maintenance
personnel
corrected
an immediate deficiency without documenting
the problem
as required
by your prescribed
corrective action processes,
with
the result that you missed
an opportunity to assess
the potential
impact
on
system
performance
and operability.
Violation
B concerns
the failure to document
as
required
by your procedure,
when manual
actions
were
implemented
as
compensation
for a degraded
condition.
We are concerned
that this violation
apparently resulted
from weaknesses
in communications
between
the maintenance,
operations,
and engineering
organizations'602260377
960223
ADQCK 05000528
6
~
'
f
l
1
Sr
Arizona Public Service
Company
Violation
C concerns
the failure to perform testing for emergency chiller
system leakage.
We are concerned
that engineering failed to communicate
recognized
design
and testing deficiencies to the operations
and maintenance
organizations
and failed to assure
that measures
were established
and
implemented within a reasonable
period of time to verify the continued
operability of the chilled water cooling system.
You are required to respond
to this letter
and should follow the instructions
specified in the enclosed
Notice when preparing your response.
In your
response,
you should document
the specific actions
taken
and
any additional
actions
you plan to prevent recurrence.
Your response
may reference
or
include previous
docketed
correspondence, if the correspondence
adequately
addresses
the required
response.
After reviewing your response
to this
Notice, including your proposed corrective actions
and the results of future
inspections,
the
NRC will determine whether further
NRC enforcement
action is
necessary
to ensure
compliance with NRC regulatory requirements.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter, its enclosure(s),
and your response will be placed in the
NRC
Public Document
Room
(PDR).
To the extent possible,
your response
should not
include
any 'personal
privacy, proprietary,
or safeguards
information so that
it can
be placed in the
PDR without redaction.
The responses
directed
by this letter
and the enclosed
Notice are not subject
to the clearance
procedures
of the Office of Management
and Budget
as required
by the Paperwork Reduction Act of 1980,
Pub.
L. No. 96.511.
~
II
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Dockets:
50-528
50-529
50-530
Licenses:
NPF-51
Sin
rely,
J.
E. Dyer,
Division of
rector
actor projects
Enclosures:
1.
2
~
NRC Inspection
Report
50-528/95-25;
50-529/95-25;
50-530/95-25
f,
Arizona Public Service
Company
cc w/encl osures:
Arizona Corporation
Commission
ATTN:
Hr. Steve
Olea
1200
W. Washington Street
Phoenix,
85007
Southern California Edison
Company
ATTN:
T.
E. Oubre,
Esq.
P.O.
Box 800
Rosemead,
91770
Arizona Radiation Regulatory Agency
ATTN:
Aubrey V. Godwin, Director
4814 South
40 Street
Phoenix,
85040
Maricopa County Board of Supervisors
ATTN:
Chairman
ill South Third Avenue
Phoenix,
85003
Palo
Verde Services
ATTN:
Curtis Hoskins,
Executive
Vice President
and
Chief Operating Officer
2025
N. 3rd Street,
Suite
220
Phoenix, Ariz'ona'5004
Akin, Gump, Strauss,
Hauer
and Feld
El
Paso Electric Company
ATTN:
Roy P.
Lessey, Jr.,
Esq.
1333
Avenue, Suite
400
D.C.
20036
Arizona Public Service
Company
ATTN:
Angela K. Krainik, Hanager
Nuclear Licensing
P,O.
Box 52034
Phoenix,
85072-2034
e
If
lif
E-Hail req rt to D. Nelson
(DJN)
E-Hail report to
NRR Event Tracking System
( IPAS)
,bcc;to 'DHB '(IEO1):-y
j'cc
distrib.
by RIV:
L. J, Callan
DRSS-F IPB
Branch Chief (DRP/F,
WCFO)
Senior Project Inspector
(DRP/F,
WCFO)
Leah Tremper
(OC/LFDCB, HS:
TWFN 9E10)
Resident
Inspector
HIS System
RIV File
Branch Chief (DRP/TSS)
H.
Hammond
(PAO,
WCFO)
DOCUHENT NAHE:
R:K PVKPV525RP.KEJ
To receive copy of docrlnent, indicate in bor. "C" ~ Copy without enciosures
E" ~ Copy with enclosures "tt" ~ No copy
SRI:P
E
KEJo
2
'96
C:DRP/
DFKi
2/
6
D:DRP
E
EDy
2/
96
0
C A
Q P'000
Arizona Public Service
Company
E-Mail report to D. Nelson
(DJN)
E-Hail report to
NRR Event Tracking System
(IPAS)
bcc to
DMB (IE01)
bcc distrib.
by RIV:
L. J. Callan
DRSS-FIPB
Branch Chief (DRP/F,
WCFO)
Senior Project Inspector
(DRP/F,
WCFO)
Leah Tremper
(OC/LFDCB, HS:
TWFN 9E10)
Resident
Inspector
MIS System
RIV File
Branch Chief (DRP/TSS)
H.
Hammond
(PAO,
WCFO)
DOCUMENT NAME:
R:i PV~tPV525RP.KEJ
To receive copy of docrxsent, indicate in box: "C" ~ Copy without enclosures
E" ~ Copy with enclosures "ii" ~ No copy
SRI:P
E
KEJo
2
96
C:DRP/
DFKi
2/
6
D:DRP
E
EDy
2/
96
0
C A
COR
f
I