Forwards Insp Repts 50-528/95-25,50-529/95-25 & 50-530/95-25 on 951217-960127 & NOV
ML17312A551
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 02/23/1996
From: Dyer J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17312A552 List:
References
NUDOCS 9602260377
Download: ML17312A551 (10)


See also: IR 05000528/1995025

Text

~y,g Alger~

(4

4

0

Cy

I

o

o4;

/p

    • g%

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON,TEXAS 76011.6064

FEB 23

J996

Arizona

Publ i c Ser vi ce

Company

ATTN:

William LE Stewart

Executive Vice President,

Nuclear

P.O.

Box 53999

Phoenix,

Arizona

85072-3999

SUBJECT:

NRC

INSPECTION

REPORT 50-528/95-25;

50-529/95-25;

50-530/95-25

AND

NOTICE OF VIOLATION

This refers to the inspection

conducted

by Hr. K. Johnston

and other

inspectors

of this office on December

17,

1995,

through January

27,

1996, at

the Palo Verde Nuclear Generating Station,

Units 1,

2,

and 3, facility.

The

purpose of the inspection

was to determine

whether activities authorized

by

the license

were conducted

safely

and in accordance

with NRC requirements.

At

the conclusion of the inspection,

the findings were discussed

with you and

those

members of your staff identified in the enclosed

report.

Areas

examined during the inspection

are identified in the report.

Within

these

areas,

the inspection consisted

of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observation

of

activities in progress.

Based

on the results of this inspection,

the

NRC has determined that three

violations of NRC requirements

occurred.

These violations are cited in the

enclosed

Notice of Violation (Notice)

and the circumstances

surrounding

them

are described

in detail

in the subject inspection report.

The violations

relate to issues

identified during

a review of the essential

chilled water

system.

The review focused

on the control of chiller refrigerant

and oil

levels,

and the control of essential

chilled water leakage.

Although the

three violations relate to the

same

system,

they highlight different

programmatic

weaknesses

that were identified throughout the assessment

of the

essential

chilled water system.

Violation A concerns

the failure to identify significant changes

in chiller

refrigerant

as

a condition adverse

to quality.

We are concerned

that

maintenance

personnel

corrected

an immediate deficiency without documenting

the problem

as required

by your prescribed

corrective action processes,

with

the result that you missed

an opportunity to assess

the potential

impact

on

system

performance

and operability.

Violation

B concerns

the failure to document

an operability determination,

as

required

by your procedure,

when manual

actions

were

implemented

as

compensation

for a degraded

condition.

We are concerned

that this violation

apparently resulted

from weaknesses

in communications

between

the maintenance,

operations,

and engineering

organizations'602260377

960223

PDR

ADQCK 05000528

6

PDR

~

'

f

l

1

Sr

Arizona Public Service

Company

Violation

C concerns

the failure to perform testing for emergency chiller

system leakage.

We are concerned

that engineering failed to communicate

recognized

design

and testing deficiencies to the operations

and maintenance

organizations

and failed to assure

that measures

were established

and

implemented within a reasonable

period of time to verify the continued

operability of the chilled water cooling system.

You are required to respond

to this letter

and should follow the instructions

specified in the enclosed

Notice when preparing your response.

In your

response,

you should document

the specific actions

taken

and

any additional

actions

you plan to prevent recurrence.

Your response

may reference

or

include previous

docketed

correspondence, if the correspondence

adequately

addresses

the required

response.

After reviewing your response

to this

Notice, including your proposed corrective actions

and the results of future

inspections,

the

NRC will determine whether further

NRC enforcement

action is

necessary

to ensure

compliance with NRC regulatory requirements.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter, its enclosure(s),

and your response will be placed in the

NRC

Public Document

Room

(PDR).

To the extent possible,

your response

should not

include

any 'personal

privacy, proprietary,

or safeguards

information so that

it can

be placed in the

PDR without redaction.

The responses

directed

by this letter

and the enclosed

Notice are not subject

to the clearance

procedures

of the Office of Management

and Budget

as required

by the Paperwork Reduction Act of 1980,

Pub.

L. No. 96.511.

~

II

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Dockets:

50-528

50-529

50-530

Licenses:

NPF-41

NPF-51

NPF-74

Sin

rely,

J.

E. Dyer,

Division of

rector

actor projects

Enclosures:

1.

Notice of Violation

2

~

NRC Inspection

Report

50-528/95-25;

50-529/95-25;

50-530/95-25

f,

Arizona Public Service

Company

cc w/encl osures:

Arizona Corporation

Commission

ATTN:

Hr. Steve

Olea

1200

W. Washington Street

Phoenix,

Arizona

85007

Southern California Edison

Company

ATTN:

T.

E. Oubre,

Esq.

P.O.

Box 800

Rosemead,

California

91770

Arizona Radiation Regulatory Agency

ATTN:

Aubrey V. Godwin, Director

4814 South

40 Street

Phoenix,

Arizona

85040

Maricopa County Board of Supervisors

ATTN:

Chairman

ill South Third Avenue

Phoenix,

Arizona

85003

Palo

Verde Services

ATTN:

Curtis Hoskins,

Executive

Vice President

and

Chief Operating Officer

2025

N. 3rd Street,

Suite

220

Phoenix, Ariz'ona'5004

Akin, Gump, Strauss,

Hauer

and Feld

El

Paso Electric Company

ATTN:

Roy P.

Lessey, Jr.,

Esq.

1333

New Hampshire

Avenue, Suite

400

Washington,

D.C.

20036

Arizona Public Service

Company

ATTN:

Angela K. Krainik, Hanager

Nuclear Licensing

P,O.

Box 52034

Phoenix,

Arizona

85072-2034

e

If

lif

E-Hail req rt to D. Nelson

(DJN)

E-Hail report to

NRR Event Tracking System

( IPAS)

,bcc;to 'DHB '(IEO1):-y

j'cc

distrib.

by RIV:

L. J, Callan

DRSS-F IPB

Branch Chief (DRP/F,

WCFO)

Senior Project Inspector

(DRP/F,

WCFO)

Leah Tremper

(OC/LFDCB, HS:

TWFN 9E10)

Resident

Inspector

HIS System

RIV File

Branch Chief (DRP/TSS)

H.

Hammond

(PAO,

WCFO)

DOCUHENT NAHE:

R:K PVKPV525RP.KEJ

To receive copy of docrlnent, indicate in bor. "C" ~ Copy without enciosures

E" ~ Copy with enclosures "tt" ~ No copy

SRI:P

E

KEJo

2

'96

C:DRP/

DFKi

2/

6

D:DRP

E

EDy

2/

96

0

C A

OR

COP

Q P'000

Arizona Public Service

Company

E-Mail report to D. Nelson

(DJN)

E-Hail report to

NRR Event Tracking System

(IPAS)

bcc to

DMB (IE01)

bcc distrib.

by RIV:

L. J. Callan

DRSS-FIPB

Branch Chief (DRP/F,

WCFO)

Senior Project Inspector

(DRP/F,

WCFO)

Leah Tremper

(OC/LFDCB, HS:

TWFN 9E10)

Resident

Inspector

MIS System

RIV File

Branch Chief (DRP/TSS)

H.

Hammond

(PAO,

WCFO)

DOCUMENT NAME:

R:i PV~tPV525RP.KEJ

To receive copy of docrxsent, indicate in box: "C" ~ Copy without enclosures

E" ~ Copy with enclosures "ii" ~ No copy

SRI:P

E

KEJo

2

96

C:DRP/

DFKi

2/

6

D:DRP

E

EDy

2/

96

0

C A

COR

COP

f

I