ENCLOSURE 1,
NOTICE OF DEVIATION
Publ i c Servi ce
Company
Palo Verde Nuclear Generating
Station
Docket:
50-528
L'icense:
During an
NRC inspection
conducted
on February
26 through April 8,
1995,
a
deviation of your Updated Final Safety Analysis Report was identified.
In
accordance
with the "General
Statement of Policy and Procedure for NRC
Enforcement Actions,"
10 CFR Part 2, Appendix C, the deviation is listed
below:
The Palo Verde Updated Final Safety Analysis Report,
Section
17.2F.6,
provides guality Assurance
commitments for station blackout coping
equipment.
Section 17.2F.6.3.2.3,
"Instructions,
Procedures,
and
Drawings," states,
in part, that ".
.
. tests
.
.
. for compliance with
10
CFR 50.63 shall
be prescribed
by documented
instructions,
procedures,
and drawings
and shall
be accomplished
in accordance
with these
documents."
In partial
implementation of these
commitments,
Procedure
Revision 0,
"GTG Parallel
Operation With Nonclass
1E Loads," provided
instructions for the testing of the gas turbine generators
(GTGs).
Step 8. 1. 11. 1 states,
in part, to complete Section 6.4 of
Procedure
"Gas Turbine Generator
1 Operating Instructions,"
prior to paralleling
GTG ¹I to offsite power.
Procedure
Section 6.4,
Step 6.4.3. 1, specifies that the operator
ensure that the
GTG
1 speed control isoch/droop
switch is in the droop position.
Contrary to the above,
on March 9,
1995, prior to paralleling
GTG
1 to
offsite power,
a nonlicensed
operator did not accomplish testing of
station blackout coping equipment
(the
GTGs) in accordance
with test
instructions in that
he did not ensure that the
GTG
1 speed control
isoch/droop
switch was in the droop position.
The switch remained
in
the isoch position
and
as
a result
GTG
1 tripped when it was paralleled
to offsite power.
Please
provide to the U.S. Nuclear Regulatory
Commission,
ATTN:
Document
Control
Desk,
D.C. 20555, with a copy to the Regional
Administrator,
Region
IV, 611
Ryan Plaza Drive, Suite 400, Arlington, Texas
76011,
and
a copy to the
NRC Resident
Inspector at the facility that is the
subject of this Notice, in writing within 30 days of the date of this Notice,
(1) the reason(s)
for the deviation, or if contested,
the basis for disputing
the deviation,
(2) the corrective steps that have
been taken
and the results
achieved,
(3) the corrective steps that will be taken to avoid further
deviations,
and (4) the date
when full compliance will be achieved.
Where
good cause is shown, consideration will be given to extending the response
t
time.
Dated at Arlington, Texas,
this 12th day of Hay 1995
'PSOSf90106
950512
ADQCK 05000528
6