Forwards Insp Repts 50-528/95-06,50-529/95-06 & 50-530/95-06 on 950226-0408 & Notice of Deviation.Deviation of Concern Because of Poor Procedural Compliance & Poor Command & Control Associated W/Operation of Equipment
ML17311A876
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 05/12/1995
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Stewart W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17311A878 List:
References
NUDOCS 9505190095
Download: ML17311A876 (10)


See also: IR 05000226/2004008

Text

L~p,R REQIr

~C

1p0

P

$a

r4,

+>>**~

UNIT E O STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA ORIVE, SUITE 400

ARLINGTON,TEXAS 76011 8064

MAY

I 2 l995

Arizona Public Service

Company

ATTN:

William L. Stewart

Executive Vice President,

Nuclear

P.O.

Box 53999

Phoenix,

Arizona

85072-3999

SUBJECT:

NRC

INSPECTION

REPORT 50-528/95-06;

50-529/95-06;

50-530/95-06

AND

NOTICE OF DEVIATION

This refers to the inspection

conducted

by K. Johnston

and others of this

office on February

26 through April 8,

1995.

The inspection

included

a review

of activities authorized for your Palo Verde Nuclear Generating Station,

Units 1,

2,

and 3, facility.

At the conclusion of the inspection,

the

findings were discussed

with you and those

members of your staff identified in

the enclosed

report.

Areas

examined during the inspection

are identified in the report.

Within-

these

areas,

the inspection consisted

of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observation of

t

activities in progress.

The purpose of the inspection

was to determine

whether activities authorized

by the license

were conducted

safely

and in

accordance

with'RC requirements.

Overall, plant management

addressed

plant problems in an aggressive

and

thorough

manner with minimal

NRC involvement.

An example of this was the

engineering

response

to the fouling of the Unit 2 emergency diesel

generator

coolers.

Maintenance

management

was not as prompt in addressing

the

implication of control element drive mechanism

breaker failures.

It appeared

that the focus

was

on breaker

replacement

and not component operability.

Based

on the results of this inspection,

certain licensed activities appeared

to deviate

from your commitments in the Updated Final Safety Analysis

Report

(UFSAR),

as specified in the enclosed

Notice of Deviation (Notice).

The Notice involved the failure to follow procedures

for the testing of the

standby

gas turbine generators

as specified in the guality Assurance

Plan

described

in Chapter

17 of the

UFSAR.

As a result of not following testing

procedures,

one of the gas turbine generators

picked

up excessive

load when it

was paralleled with offsite power, resulting in a trip of the gas turbine.

The deviation is of concern

since the inspector

observed

poor procedural

compliance

and poor command

and control associated

with the operation of

equipment

designed

to mitigate station blackout conditions.

, This matter is

discussed

in Section

5. 1 of the enclosed report.

One unresolved

item was identified concerning

the conditions which led to the

t

licensee's

request for a Notice of Enforcement Discretion regarding

containment

penetration

overcurrent protection devices.

This matter is

discussed

in Section

2.2 of the enclosed

inspection report.

9505f90095 9505i2

PDR

ADOCK 05000528

6

PDR

~ ~

l

1

0

Arizona Public Service

Company

You are requested

to respond to this letter and should follow the instructions

specified

in the enclosed

Notice when preparing your response.

In your

response,

you should document the specific actions

taken

and any additional

actions you plan to prevent recurrence.

Your response

may reference

or

include previous docketed

correspondence, if the correspondence

adequately

addresses

the required response.

After reviewing your response

to this Notice, including your proposed

corrective actions

and the results of future inspections,

the

NRC will

determine

whether further

NRC enforcement

action is necessary

to ensure

compliance with NRC regulatory requirements.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter, its enclosures,

and your response will be placed in the

NRC

Public Document

Room

(PDR).

To the extent possible,

your response

should not

include

any personal

privacy, proprietary,

or safeguards

information so that

it can

be placed in the

PDR without redaction.

However, if you find it

necessary

to include such information, you should clearly indicate the

specific information that you desire

not to be placed in the

PDR,

and provide

the legal

basis to support your request for withholding the information from

the public.

The responses

directed

by this letter and the enclosed

Notice are not subject

to the clearance

procedures

of the Office of Management

and Budget

as required

by the Paperwork Reduction Act of 1980,

Pub.

L. No. 96;511.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

Dockets:

50-528

50-529

50-530

Licenses:

NPF-41

NPF-51

NPF-74

A. Bill Beach, Director

Division of Reactor

Projects

Enclosures:

I.

Notice of Deviation

t

2.

NRC Inspection

Report

50-528/95-06;

50-529/95-06;

50-530/95-06

Arizona

Publ i c Ser vice

Company

cc w/enclosures:

Arizona Corporati'on

Commission

ATTN:

Nr. Steve

Olea

1200

W. Washington Street

Phoenix,

Arizona

85007

Southern California Edison

Company

ATTN:

T.

E. Oubre,

Esq.

P.O.

Box 800

Rosemead,

California

91770

Arizona Radiation Regulatory Agency

ATTN:

Aubrey V. Godwin, Director

4814 South

40 Street

Phoenix,

Arizona

85040

Naricopa County Board of Supervisors

ATTN:

Chairman

111 South Third Avenue

Phoenix,

Arizona

85003

Palo Verde Services

ATTN:

Curtis Hoskins,

Executive

Vice President

and

Chief Operating Officer

2025

N. 3rd Street,

Suite

220

Phoenix,

Arizona

85004

Akin, Gump, Strauss,

Hauer

and Feld

El

Paso Electric Company

ATTN:

Roy P.

Lessey, Jr.,

Esq.

1333

New Hampshire

Avenue, Suite

400

Washington,

D.C.

20036

Arizona Public Service

Company

ATTN:

Angela K. Krainik, Manager

Nuclear Licensing

P.O.

Box 52034

Phoenix,

Arizona

85072-2034

1

1

~

Arizona Public Service

Company

-4-

E-Mail report to D. Sullivan

(DJS)

E-Mail report to

NRR Event Tracking System

(IPAS)

bcc to

DMB (IE01)

bcc distrib.

by RIV:

L. J. Callan

DRSS-FIPB

Branch Chief (DRP/F,

WCFO)

Senior Project Inspector

(DRP/F,

WCFO)

Leah Tremper

(OC/LFDCB,

MS:

TWFN 9E10)

Resident

Inspector

MIS System

RIV Fi 1 e

Branch Chief (DRP/TSS)

B. Henderson

(PAO,

WCFO)

DOCUMENT NAME:

R:tI, PV)PV506rp.KEJ

To receive copy of document, Indicate In

ox: "C" ~ Copy

ithout enclosures

Copy with enclosures "N" ~ No copy

SRI: PV

KEJohn

n

C:DRPi

HJWon

D:W 0*

KE

ins

D.

RP

E

/IZ/95

5/)Z /95

5/) /95

5/JZ /95

  • previously concurred

Arizona

Publ ic Serv ice

Company

E-Hail report to D. Sullivan

(DJS)

E-Hail report to

NRR Event Tracking System

(IPAS)

",bcc'o

DMB (IE01)

bcc distrib.

by RIV:

L. J. Callan

DRSS-F IPB

Branch Chief (DRP/F,

WCFO)

Senior Project Inspector

(DRP/F,

WCFO)

Leah Tremper

(OC/LFDCB, HS:

TWFN 9E10)

Resident

Inspector

HIS System

RIV File

Branch Chief (DRP/TSS)

B. Henderson

(PAO,

WCFO)

DOCUMENT NAME:

R:g PV(PV506rp.KEJ

Toreceiv'ocopyof document, indtcete in

ox: "C" ~ Copy

ithout enclosures

"~ Copywlth enclosures

"N" ~ Nocopy

SRI: PV

C:DRPi

D:W 0*

Do

RP

E

KEJohn

n

/lZ/95

HJWon

5/12/95

KE

ins

5/) /95

5/l2 /95

  • previously concurred

'