UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZADRIVE, SUITE 400
ARLINGTON,TEXAS 76011 8064
APR igm
Arizona Public Service
Company
ATTN:
William L. Stewart
Executive Vice President,
Nuclear
P.O.
Box 53999
Phoenix,
85072-3999
SUBJECT:
NRC
INSPECTION
REPORT 50-528/95-03;
50-529/95-03;
50-530/95-03
This refers to the inspection
conducted
by K.
E. Johnston
and the inspectors
identified in the enclosed
report, of this office,
on January
15 through
February
25,
1995,
The inspection
included
a review of activities authorized
for your Palo Verde Nuclear Generating Station,
Units 1,
2,
and 3, facility.
At the conclusion of the inspection,
the findings were discussed
with those
members
oF your staff identified in the enclosed
report.
Areas
examined during the inspection
are identified in the report.
Within
these
areas,
the inspection consisted
of selective
examinations
of procedures
and representative
records,
interviews with personnel.
and observation of
activities in progress.
The results of this inspection
are documented
in the
enclosed
report.
The incorrect assessment
by plant operators of off-normal plant indications in
the safety injection systems of Units
1
and 3,
and the slow resolution
by
operations
management
indicates that your continued attention
appears
warranted
in the area of operator
performance.
We noted that,
in the presence
of nuclear
assurance
personnel
and
an
NRC inspector,
operations
personnel
deviated
from
a prerequisite
step without resolving the discrepancy.
In
addition,
inspection findings indicated continued
weaknesses
in the quality of
maintenance
work
instructions.
While we continue to find that maintenance
personnel
perform to high standards,
they appear to be unnecessarily
challenged with poorly prepared
work instructions.
We recognize that your
staff has initiated efforts to identify specific weaknesses
in the work
planning process
and its implementation.
We encourage
you to effect
improvements.
We noted that Nuclear Assurance activities in operations
and
maintenance
were aggressive
and questioning.
One unresolved
item was identified concerning
the operability and
reportability of the essential
cooling water system'ith
nonseismically
qualified instrumentation,
The issue
involved
a longstanding plant deficiency
which until recently
had received
weak technical
reviews
and low priority for
resolution.
This issue,
as well as several
similar ones
such
as condensate
in
the steam lines to the turbine-driven auxiliary feedwater
pump, indicates
a
continued
need for management
to give priority to unresolved plant
deficiencies.
9504250060 9504iq
ADOCK 05000528
8
)~
g q
0
Arizona Public Service
Company
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter
and its enclosures will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
. Bill Beach, Director
Division of Reactor Projects
Dockets:
50-528
50-529
50-530
Licenses:
NPF-51
Enclosure:
NRC Inspection
Report
50-528/95-03;
50-529/95-03;
50-530/95-03
cc w/enclosure:
Arizona Corporation
Commission
ATTN:
Nr. Steve
Olea
1200
W. Washington Street
Phoenix,
85007
Southern California Edison
Company
ATTN:
T,
E. Oubre,
Esq.
P.O.
Box 800
Rosemead,
91770
Arizona Radiat'ion Regulatory Agency
ATTN:
Aubrey V. Godwin, Director
4814 South
40 Street
Phoenix,
85040
Maricopa County Board of Supervisors
ATTN:
Chairman
111 South Third Avenue
Phoenix,
85003
J
V
0
Arizona Public Service
Company
Palo Verde Services
ATTN:
Curtis Hoskins,
Executive
Vice President
and
Chief Operating Officer
2025
N. 3rd Street,
Suite
220
Phoenix,
85004
Akin, Gump, Strauss,
Hauer
and Feld
El
Paso Electric Company
ATTN:
Roy P.
Lessey, Jr.,
Esq.
1333
Avenue, Suite
400
D.C.
20036
Arizona Public Service
Company
ATTN:
Angela K. Krainik, Manager
Nuclear Licensing
P,O.
Box 52034
Phoenix,
85072-2034
1
e
E-Hail report to D. Sullivan
(DJS)
E-Hail report to
NRR Event Tracking System
( IPAS)
- bcc to
DHB
( IE01)
bcc distrib.
by RIV:
APR
1 9 I995
L. J.
Callan
DRSS-FIPB
Branch Chief (DRP/F,
WCFO)
Senior Project Inspector
(DRP/F,
WCFO)
Leah Tremper
(OC/LFDCB,
HS:
TWFN 9E10)
Resident
Inspector
HIS System
RIV File
Branch Chief (DRP/TSS)
B. Henderson
(PAO,
WCFO)
DOCUMENT NAME: R:/ PV/PV503RP.KEJ
To receive copy cf document, indicate in box: "C" ~ Copy without encl
ur s " "
Copy with enclosures "N
~ No copy
RIV:SRI
KJohnston
04/7 /95
C:DRPF
HJWon
04/g/95
D:WCFO
KEPe kins
04
/9
R
C
D:
R
a
04/ h
95
a
I
i',r
e
E-Mail report to D. Sullivan
(DJS)
E-Mail report to
NRR Event Tracking System
(IPAS)
bcc to
DMB (IE01)
bcc distrib.
by RIV:
APR
1 9 I995
L. J. Callan
DRSS-FIPB
Branch Chief (DRP/F,
WCFO)
Senior Project Inspector
(DRP/F,
WCFO)
Leah Tremper
(OC/LFDCB,
MS:
TWFN 9E10)
Resident
Inspector
MIS System
RIV File
Branch Chief (DRP/TSS)
B. Henderson
(PAO,
WCFO)
DOCUMENT NAME: R:/ PV/PV503RP.KEJ
To receive copy of document, Indicate in box: "C" ~ Copy without encl
ur s " "
Copywith enclosures "N" = No copy
RIV:SRI
KJohnston
04/7 /95
C:DRPF
HJWon
04/g/95
D:WCFO
KEPe kins
04
/9
D:
R
a
04/ i
95
'
~