ML17311A732
| ML17311A732 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 03/24/1995 |
| From: | Gwynn T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Stewart W ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| Shared Package | |
| ML17311A733 | List: |
| References | |
| NUDOCS 9503290011 | |
| Download: ML17311A732 (10) | |
See also: IR 05000528/1995002
Text
~P,S RE00
Wp0
g:e
- y4
UNITE D STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZA DRIVE, SUITE 400
ARLINGTON,TEXAS 76011 6064
MAR 24 Q5
Arizona Public Service
Company
ATTN:
William L. Stewart
Executive Vice President,
Nuclear
P.O.
Box 53999
Phoenix,
85072-3999
SUBJECT:
NRC
INSPECTION
REPORT 50-528/95-02'0-529/95-02;
50-530/95-02
This refers to the inspection
conducted
by Hr. C. Johnson of this office on
february
13-17
and in-office review through March 10,
1995.
The inspection
included
a review of activities authorized for your Palo Verde Nuclear
Generating Station,
Units 1, 2,
and 3, facility.
At the conclusion of the
inspection,
the findings were discussed
with those
members of your staff
identified in the enclosed
report.
Areas
examined during the inspection
are identified in the report.
Within
these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observation of
activities in progress.
The purpose of the inspection
was to determine
whether activities authorized
by the license
were conducted safely
and in
accordance
with NRC requirements.
One unresolved
item was identified concerning
the application of lubricant on
the containment airlock door seals
and the equalizing valve 0-rings before
performing Type
B testing
as required
This matter
is discussed
in Section 2.6. 1 of the enc',osed
inspection report.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter and its enclosures will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sine rely,
(gc f<<<<
Thomas
P.
G ynn, Director,
Division of Reactor Safety
2804 05
9S032900fi
950324
ADOCK OS000528
/u
'I
I
0
Arizona Public Service
Company
Dockets:
50-528
50-529
50-530
Licenses:
NPF-51
Enclosure:
NRC Inspection
Report
50-528/95-02;
50-529/95-02;
50-530/95-02 w/attachments
cc w/enclosure:
Arizona Corporation
Commission
ATTN:
Mr. Steve
Olea
1200
W. Washington Street
Phoenix,
85007
Southern California Edison
Company
ATTN:
T.
E. Oubre,
Esq.
P.O.
Box 800
Rosemead,
91770
ABB Combustion
Engineering Nuclear
Power
ATTN:
Charles
B. Brinkman,
Manager
Washington Nuclear Operations
12300 Twinbrook Parkway, Suite 330
Rockville, Maryland
20852
Arizona Radiation Regulatory Agency
ATTN:
Aubrey V. Godwin, Director
4814 South
40 Street
Phoenix,
85040
Maricopa County Board of Supervisors
ATTN:
Chairman
111 South Third Avenue
Phoenix,
85003
Palo Verde Services
ATTN:
Curtis Hoskins,
Executive
Vice President
and
Chief Operating Officer,
2025
N. 3rd Street,
Suite
220
Phoenix,
85004
~,
J
l
I
j
I
'I"
(
f
l
Arizona Public Service
Company
Akin, Gump, Strauss,
Hauer
and Feld
El
Paso Electric Company
ATTN:
Roy P.
Lessey, Jr.,
Esq.
1333
Avenue, Suite
400
D.C.
20036
Arizona Public Service
Company
ATTN:
Angela K. Krainik, Manager
Nuclear Licensing
P.O.
Box 52034
Phoenix,
85072-2034
e
l
Arizona Public Service
Company
E-Mail report to D. Sullivan (DJS)
bcc to
DMB (IEOl)
bcc distrib.
by RIV:
L. J. Callan
DRSS-FIPB
Branch Chief (DRP/F,
WCFO)
Senior Project Inspector
(DRP/F,
WCFO)
Leah Tremper
(OC/LFDCB,
MS:
TWFN 9EIO)
Resident
Inspector
MIS System
RIV File
Branch Chief (DRP/TSS)
B. Henderson
(PAO,
WCFO)
DOCUMENT NAME:
R:g PV)PV502rp.CEJ
To receive copy of document, Cndicete In box:
C" ~ Copy wit out enclosures
"E"
Copy with en
osures "N"
No copy
RIV:RI:MB
C:MB
6
D:DR
D
~
D: DRS
~
CEJohnson/lb
03/it, /95
DAPowers
03/r( /95
TPGwyn
03/ +95
ch
03 fl,lr/95
TPGwy
03/ '5
i
Arizona Public Service
Company
E-Hail report to D. Sullivan
(DJS)
bcc to
DHB (IE01)
bcc distrib.
by RIV:
L. J. Callan
DRSS-F IPB
Branch Chief (DRP/F,
WCFO)
Senior Project Inspector
(DRP/F,
WCFO)
Leah Tremper
(OC/LFDCB,
MS:
TWFN 9E10)
Resident
Inspector
HIS System
RIV File
Branch Chief (DRP/TSS)
B. Henderson
(PAO,
WCFO)
DOCUMENT NAME:
R:g PV(PV502rp.CEJ
To receive copy of document, indicate inboxt
C" ~ Copy wi
out enciosures
E"
Copy with en
osures "N
~ No copy
RIV:RI:MB
C:HB
D:DR
D
~
D:DRS
CEJohnson/lb
03/i~/95
DAPowers
03/rG /95
03/ gf95
03fLl /95
TPGwyn
~
ch
TPGwy
03/
95
4
,
0,