ML17311A672
| ML17311A672 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 02/24/1995 |
| From: | Beach A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Stewart W ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| Shared Package | |
| ML17311A673 | List: |
| References | |
| IEIN-94-060, IEIN-94-60, NUDOCS 9503010283 | |
| Download: ML17311A672 (10) | |
See also: IR 05000528/1994037
Text
UNITEDSTATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZA DRIVE, SUITE 400
FEB 2 4 l995
Arizona Public Service
Company
ATTN:
William L. Stewart
Executive Vice President,
Nuclear
P.O.
Box 53999
Phoenix,
85072-3999
SUBJECT:
NRC
INSPECTION
REPORT 50-528/94-37;
50-529/94-37;
50-530/94-37
This refers to the inspection
conducted
by K. Johnston
and others, of this
office, on December
1,
1994,
through January
14,
1995.
The inspection
included
a review of activities authorized for your Palo Verde Nuclear
Generating Station,
Units 1,
2,
and 3, facility.
At the conclusion of the
inspection,
the findings were discussed
with you and those
members of your
staff identified in the enclosed
report.
Areas
examined during the inspection
are identified in the report.
Within
these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observation of
activities in progress.
The purpose of the inspection
was to determine
whether activities authorized
by the license'e
were conducted safely
and in
accordance
with NRC requirements.
During this inspection period,
we noted continued
improvements
in the conduct
of operations
and maintenance activities.
One unresolved
item was identified
concerning the licensee's
evaluation of NRC Information Notice 94-60
addressing
power operation with main steam safety valves gagged.
This matter
is discussed
in Section
5. 1 of the enclosed
inspection report.
In accordance
with 10 CFR 2.790 o'f the NRC's "Rules of Practice,"
a copy of
this letter
and its enclosures will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
W
A. Bill Beach, Director
Division of Reactor Projects
G
Go~2
95030i0283
950224
ADQCK 05000528
8
I
i
t
"I
I
Arizona Public Service
Company
Dockets:
50-528
50-529
50-530
Licenses:
NPF-51
Enclosure:
1.
NRC Inspection
Report
50-528/94-37;
50-529/94-37;
50-530/94-37
cc w/enclosure:
Arizona Corporation
Commission
ATTN:
Mr. Steve
Olea
1200
W. Washington Street
Phoenix,
85007
Southern California Edison
Company
ATTN:
T.
E. Oubre,
Esq.
P.O.
Box 800
Rosemead,
91770
ABB Combustion
Engineering Nuclear
Power
ATTN:
Charles
B. Brinkman,
Manager
Nuclear Operations
12300 Twinbrook Parkway,
Suite 330
Rockville, Maryland
20852
Arizona Radiation Regulatory
Agency
ATTN:
Aubrey V. Godwin, Director
4814 South
40 Street
Phoenix,
85040
Maricopa County Board of Supervisors
ATTN:
Chairman
111 South Third Avenue
Phoenix,
85003
Palo Verde Services
ATTN:
Curtis Hoskins,
Executive
Vice President
and
Chief Operating Officer
2025
N. 3rd Street,
Suite
220
Phoenix,
85004
,
Arizona Public Service
Company
Akin, Gump, Strauss,
Hauer
and Feld
El
Paso Electric Company
ATTN:
Roy P.
Lessey, Jr.,
Esq.
1333
Avenue, Suite
400
O.C.
20036
Arizona Public Service
Company
ATTN:
Angela K. Krainik, Nanager
Nuclear Licensing
P.O.
Box 52034
Phoenix,
85072-2034
Arizona Public Service
Company
FEP
P g
!9'3g
E-Hail report to D. Sullivan
(DJS)
bcc to
DMB (IE01)
bcc distrib.
by RIV:
L. J. Callan
DRSS-FIPB
Branch Chief (DRP/F,
WCFO)
Senior Project Inspector
(DRP/F,
WCFO)
Leah Tremper
(OC/LFDCB, HS:
TWFN 9E10)
Resident
Inspector
MIS System
RIV File
Branch Chief (DRP/TSS)
B. Henderson
(PAO,
WCFO)
DOCUMENT NAME:
To receive copy ef document, indicate in box: "C" ~ Copy without encl
ur s "
~ Copy with enclosures "N"
No copy
RIV: SR I:DRP/F
C: DRP/F
D: WCFO
KEJohnston 4
7t i
HJWong
P
KEPerkins
t
02/ 7/95
02/t'2/95
02
95
0
L
0
D
D
A
ech
02
/95
02/
/95
I
l
I
1
f
Arizona Public Service
Company
FEB 2d
l995
E-Mail report to D. Sullivan
(DJS)
bcc to
DMB (IE01)
bcc distrib.
by RIV:
L. J. Callan
DRSS-FIPB
Branch Chief (DRP/F,
WCFO)
Senior Project Inspector
(DRP/F,
WCFO)
Leah Tremper
(OC/LFDCB,
MS:
TWFN 9E10)
Resident
Inspector
MIS System
RIV Fi 1 e
Branch Chief (DRP/TSS)
B. Henderson
(PAO,
WCFO)
DOCUMENT NAME:
To receive copy of document, indite inbox: "C" ~ Copywlthout encl
ur s "
~ Copy with enclosures "N
~ No copy
RIV:SRI: DRP/F
C:DRP/F
D:WCFO
D
D
KEJohnston 0
+~
HJWong
P
KEPerkins
A
ech
1
02/
/95
0
02/~95
02
95
02
/95
02/
/95
l
'I
l
I
1
!
1
1