1
0GJ'g
a AE00
- 4
'
)t**y+
UNITED STATES
NUCLEAR REGULATORY CC MMISSlON
R EG ION IV
611 RYAN PLAZA DRIVE, SUITE 400
ARLINGTON,TEXAS 76011.8064
IICC',5
Arizona Public Service
Company
ATTN:
William L. Stewart
Executive Vice President,
Nuclear
P.O.
Box 53999
Phoenix,
85072-3999
SUBJECT:
NRC
INSPECTION
REPORT 50-528/94-34;
50-529/94-34;
50-530/94-34
AND
NOTICE OF DEVIATION
0
This refers to the inspection
conducted
by Hr. K. Johnston
and others of this
office on October
16 through
November 30,
1994.
The inspection
included
a
review of activities authorized for your Palo Verde Nuclear Generating
Station,
Units 1,
2,
and 3, facility.
At the conclusion of the inspection,
the findings were discussed
with those
members of your staff identified in the
,'enclosed
report.
Areas
examined during the inspection
are identified'n the report.
Within
these
areas,
the inspection consisted
of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observation of
activities in progress.
The purpose of the inspection
was to determine
whether activities authorized
by the license
were conducted safely
and in
accordance
with NRC requirements.
During this inspection period,
management
made significant changes
in the area
of operations'xpectations,
crew staffing and operations'rganization.
These actions
demonstrated
an understanding
of conduct of operation
weaknesses.
However,
the
NRC identified misaligned valves during the Unit 3
draindown to midloop conditions.
This event
was the subject of a special
inspection
which concluded
on December
21,
1994.
This event is addressed
in a
separate
inspection report
and is not addressed
in this report.
Based
on the results of this inspection,
certain of your activities appeared
to deviate
from your commitments
made to support
a Technical Specification
change
regarding surveillance
requirements
for the Unit 2 125-Vdc vital
batteries,
as specified in the enclosed
Notice of Deviation (Notice).
These
commitments
involved the review of maintenance
activities
on the vital 125-Vdc
equipment
and the control of access
to the plant switchyard.
In two
instances,
work performed which impacted
125-Vdc equipment
was not reviewed
and,
in one instance,
a gate to the plant switchyard
was found open
and
uncontrolled.
These
examples
indicated that management
had not adequately
communicated
the sensitivity of these activities to plant personnel.
While the root cause
was not found for the switching of lamp covers
on the
Unit
2 remote
shutdown panel, identified by a resident
inspector,
the event
highlights the
need for licensee
personnel
to be attentive to discrepant
conditions.
9501240402
950i17 -"
ADQCK 05000528
Q
.
'DR
'/(
l
~ I
II I
Arizona Public Service
Company
Three unresolved
items were identified concerning the failure of a safety
injection valve to open during testing.
The second
item is discussed
in
Section
2. 1 of the enclosed
inspection report.
Another item, discussed
in
Section
4. 1, involved previously identified weaknesses
in a maintenance
instruction for safety-related
solenoid-operated
valves which were not
corrected prior to work performed
on Unit
1 pressurizer
head vent valves.
You are required to respond to this letter and should follow the instructions
specified in the enclosed
Notice when preparing your response.
In your
response,
you should document the specific actions
taken
and any additional-
actions
you plan to prevent recurrence.
Your response
may reference
or
include previous docketed
correspondence, if the correspondence
adequately
addresses
the required response.
After reviewing your response
to this
Notice, including your proposed corrective actions
and the results of future
inspections,
the
NRC will determine
whether further
NRC enforcement
action is
necessary
to ensure
compliance with NRC regulatory requirements.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter, its enclosure(s),
and your response will be placed in the
NRC
Public Document
Room (PDR).
To the extent possible,
your response
should not
include
any personal
privacy, proprietary,
or safeguards
information so that
it can
be placed in the
PDR without redaction.
However, if you find it
necessary
to include such information, you should clearly indicate the
specific information that you desire not to be placed in the
PDR,
and provide
the legal basis to support your request for withholding the information from
the public.
The responses
directed
by this letter and the enclosed
Notice are not subject
to the clearance
procedures
of the Office of Management
and Budget
as required
by the Paperwork Reduction Act of 1980,
Pub.
L. No. 96.511.
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
A. Bill Beach, Director
Division of Reactor Projects
J
1
t
l
Arizona Public Service
Company
Dockets:
50-528
50-529
50-530
Licenses:
NPF-51
Enclosures:
1.
Appendix A - Notice of Deviation
2.
Appendix
B -
NRC Inspection
Report
50-528/94-34;
50-529/94-34;
50-530/94-34
cc w/enclosures:
Arizona Corporation
Commission
ATTN:
Mr. Steve
Olea
1200
W. Washington Street
Phoenix,
85007
Southern California Edison
Company
ATTN:
T.
E. Oubre,
Esq.
P.O.
Box 800
Rosemead,
91770
ABB Combustion
Engineering
Nuclear
Power
ATTN:
Charles
B. Brinkman,
Manager
Washington Nuclear Operations
12300 Twinbrook Parkway,
Suite
330
Rockville, Maryland
20852
Arizona Radiation Regulatory
Agency
ATTN:
Aubrey V. Godwin, Director
4814 South
40 Street
Phoenix,
85040
Haricopa County Board of Supervisors
ATTN:
Chairman
111 South Third Avenue
Phoenix,
85003
Palo Verde Services
ATTN:
Curtis Hoskins,
Executive
Vice President
and
Chief Operating Officer
2025
N. 3rd Street,
Suite
220
Phoenix,
85004
Arizona Public Service
Company
Akin, Gump, Strauss,
Hauer
and Feld
El
Paso Electric Company
ATTN:
Roy P.
Lessey, Jr.,
Esq.
1333
Avenue, Suite
400
Washington,'D.C.
20036
Arizona Public Service
Company
ATTN:
Angela K. Krainik, Hanager
Nuclear Licensing
P.O.
Box 52034
Phoenix,
85072-2034
0
Arizona Public Service
Company
JAN l7 l995
E-Mail report to D. Sullivan
(DJS)
bcc to
DMB (IEOl)
bcc distrib.
by RIV:
L. J. Callan
DRSS-FIPB
Branch Chief (DRP/F,
WCFO)
Senior Project Inspector
(DRP/F,
WCFO)
Leah Tremper
(OC/LFDCB,
MS:
TWFN 9E10)
A. B. Beach
(RIV DRP)
Resident
Inspector
MIS System
RIV File
Branch Chief (DRP/TSS)
B. Henderson
(PAO,
WCFO)
DOCUMENT NAME:
G:)PV-94-34.hjw
To receive copy of document, indicate in bcx: "C" ~ Copy without enclo ures
"E"
Copy with enciosures "N" ~ No copy
RIV:SRI
KJohnston
Ol/ o/95
DRP:C:F
HJWon
Ol//o/95
D:WCFO
KEPerkins
01/
/95
D
Ol/
/95
Ol/
/95
~(
'
Arizona Public Service
Company
J',!!
l 7
l995
E-Hail report to D. Sullivan
(DJS)
bcc to
DHB (IEOl)
bcc distrib.
by RIV:
L. J. Callan
DRSS-F IPB
Branch Chief (DRP/F,
WCFO)
Senior Project Inspector
(DRP/F,
WCFO)
Leah Tremper
(OC/LFDCB, HS:
TWFN 9E10)
A. B. Beach
(RIV DRP)
Resident
Inspector
HIS System
RIV File
Branch Chief (DRP/TSS)
.
B. Henderson
(PAO,
WCFO)
+,
~u
DOCUHENT NAHE:
G:~PV-94-34.hjw
To receive copy of document. indicate In box: "C" ~ Copy without enclo ures
"E"
Copy with enclosures "N" ~ No copy
RIV:SRI
KJohnston
DRP:C:F
HJWon
0:WCFO
~
0
KEPerkins 4 -
A
Ol// o/95
Ol/go/95
Ol/
/95
Ol/
/95
Ol/
/95
c + f'
~)
t
Ij(
i
f
'