ML17311A359
| ML17311A359 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 10/19/1994 |
| From: | Stewart W ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 102-03154-WLS-S, 102-3154-WLS-S, NUDOCS 9410250307 | |
| Download: ML17311A359 (6) | |
Text
,REGULATORY XNFORMATION DISTRXBUTION SYSTEM (RIDS)
ACCESSION NBR:9410250307 DOC.DATE: 94/10/19 NOTARIZED: NO DOCKET g FACIL:STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 AUTH.NAME AUTHOR AFFILIATXON STEWART,W.L.
Arizona Public Service Co.
(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Submits comments re RCS depressurization of preliminary ASP analysis.
DISTRIBUTION CODE:
AOOID COPIES RECEIVED:LTR 2 ENCL 0
SIZE:
TITLE: OR Submittal: General Distribution NOTES:Standardized plant.
05000529 RECIPIENT ID CODE/NAME PD4-2 LA HOLIAN, B INTERNAL: ACRS NRR/DE/EELB NRR/DRPW NRR/DSSA/SRXB OGC/HDS2 EXTERNAL: NOAC COPIES LTTR ENCL 6
1 1
1 1
RECIPXENT ID CODE/NAME PD4-2 PD TRAN,L FILE CENTER 7DRCE~/H CB NRR/DSSA/SPLB NUDOCS-ABSTRACT NRC PDR COPIES LTTR ENCL NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE iVKSTE!CONTACT'I'HE DOC!:CLIENTCONTROL DESK, ROOKI PI-37 (EXT. 504-.083 ) TO ELIXIINATEYOUR NAZIL'ROil DISTRIBUTIONLIS'I'S I'OR DOCI:NIEN'I'SYOL'ON"I'NIED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 20 ENCL
t t
f4 j
r,,
Arizona Public Service Company P.O. BOX 53999
~
PHOENIX. ARIZONA850T2-3999 WILLIAML. STEWART EXECIITIVEVICEPAESIOENT NUCI.EAA 102-031 54-WLS/SAB/TNW October 19, 1994 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555
Reference:
Letter dated July 28, 1994, "Transmittal of Preliminary ASP Analysis of Palo Verde Unit 2 SGTR Event" from the USNRC, to William L. Stewart, Executive Vice President, Nuclear, APS
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 2 Docket No. STN 50-529 Review of Preliminary ASP Analysis of PVNGS Unit 2 SGTR Event File: 94-056-026 The USNRC submitted, in the referenced letter, the preliminary Accident Sequence Precursor (ASP) Program analysis for the steam generator tube rupture which occurred in Unit 2 on March 14, 1994.
We have reviewed the analysis and would like to provide the following comment regarding Reactor Coolant System (RCS) Depressurization on page 6 of the preliminary ASP analysis.
"The time available for depressurization and use ofthe low pressure safety injection (LPSI) system is 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> instead of the 15 minutes used in the PVNGS Individual Plant Examination (IPE)."
The above comment was verbally conveyed in a conversation with the NRC staff on August 18, 1994.
Should you have any questions, please contact Scott A. Bauer at (602) 393-5978.
WLS/SAB/TNW/rv 94i02503'07 94i019 PDR ADOCK 05000529 POR