Forwards Insp Repts 50-528/94-22,50-529/94-22 & 50-530/94-22 on 940612-0723 & NOV
ML17311A242
Person / Time
Site: Palo Verde  
Issue date: 09/06/1994
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Stewart W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17311A243 List:
References
NUDOCS 9409120047
Download: ML17311A242 (10)


See also: IR 05000528/1994022

Text

~S RK0I,

0

Cy

A0

C

O

, ~,

0

qP

ky*y4

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON,TEXAS 76011.6064

SEP

6 l994

Dockets:

50-528

50-529

50-530

Licenses:

NPF-41

NPF-51

NPF-74

Arizona Public Service

Company

ATTN:

William L. Stewart

Executive Vice President,

Nuclear

P.O.

Box 53999

Phoenix,

Arizona

85072-3999

SUBJECT:

NRC

INSPECTION

REPORT 50-528/94-22;

50-529/94-22;

50-530/94-22

(NOTICE OF VIOLATION)

This refers to the inspection

conducted

by K. Johnston

and others of this

office,

on June

12 through July 23,

1994.

The inspection

included

a review of

activities authorized for your Palo Verde Nuclear Generating Station,

Units 1,

2,

and 3, facility.

At the conclusion of the inspection,

the findings were

discussed

with those

members of your staff identified in the enclosed report.

Areas

examined during the inspection

are identified in the report.

Within

these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observation of

activities in progress.

The purpose of the inspection

was to determine

whether activities authorized

by the license

were conducted safely

and in

accordance

with NRC requirements.

Based

on the results of this inspection,

certain licensed activities appeared

to be in violation of NRC requirements,

as specified in the enclosed

Notice of

Violation (Notice).

The violation concerned

the failure to perform

a channel

calibration check in accordance

with the Technical Specification surveillance

requirements.

In April 1994,

the Plant Review Board questioned

how the

surveillance

requirements

were being met, but failed to follow up to resolve

the matter until the requirements

were again questioned

in June

1994.

During the inspection,

several

findings were identified that highlighted

an

apparent

lack of plant management

in the field.

For example,

a month after

a

refueling outage

the inspector noted material condition weaknesses

in Unit 3

which could

be attributed to outage work. It was also noted that, during this

period, licensee

management

focused

a substantial

amount of time on the

reorganization

selection

process.

With the implementation of the first wave

of organization

changes

completed,

we encourage

you to reassess

the priority

placed

on management field presence

as stated

in your response

to the

1993

Systematic

Assessment

of Licensee

Performance

report.

OQOO~B

9409120047

940906

PDR

ADOCK 05D00528I

9

PDR '-+

t((

i(' I

!

t

,~1

Arizona Public Service

Company

You are required to respond to this letter

and should follow the instructions

specified in the enclosed

Notice when preparing your response.

In your

response,

you should

document

the specific actions

taken

and

any additional

actions

you plan to prevent recurrence.

After reviewing your response

to this

Notice, including your proposed corrective actions

and the results of future

inspections,

the

NRC will determine

whether further

NRC enforcement

action is

necessary

to ensure

compliance with NRC regulatory requirements.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter

and its enclosures will be placed in the

NRC Public Document

Room.

The responses

directed

by this letter and the enclosed

Notice are not subject

to the clearance

procedures

of the Office of Management

and Budget

as required

by the Paperwork Reduction Act of 1980,

Pub.

L. No. 96.511.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

~A

A. Bill Beach, Director

Division of Reactor Projects

Enclosures:

1.

Appendix A Notice of Violation

2.

Appendix

B NRC Inspection

Report

50-528/94-22;

50-529/94-22;

50-530/94-22

w/attachment

cc w/enclosures:

Arizona Corporation

Commission

ATTN:

Mr'. Steve

Olea

1200

W. Washington Street

Phoenix,

Arizona

85007

Southern California Edison

Company

ATTN:

T.

E. Oubre,

Esq.

P.O.

Box 800

Rosemead,

California

91770

ABB Combustion

Engineering

Nuclear

Power

ATTN:

Charles

B. Brinkman,

Manager

Washington

Nuclear Operations

12300 Twinbrook Parkway,

Suite

330

Rockville, Maryland

20852

I

I

Arizona

Publ i c Servi ce

Company

Arizona Radiation Regulatory

Agency

ATTN:

Aubrey V. Godwin, Director

4814 South

40 Street

Phoenix,

Arizona

85040

Haricopa County Board of Supervisors

ATTN:

Chairman

111 South Third Avenue

Phoenix,

Arizona

85003

Newman

8 Holtzinger,

P.C.

ATTN:

Jack

R.

Newman,

Esq.

1615

L Street,

N.W., Suite

1000

Washington,

D.C.

20036

Palo Verde Services

ATTN:

Curtis Hoskins,

Executive

Vice President

and

Chief Operating Officer

2025

N. 3rd Street,

Suite

220

Phoenix,

Arizona

85004

Akin, Gump, Strauss,

Hauer

and Feld

El

Paso Electric Company

ATTN:

Roy P.

Lessey, Jr.,

Esq.

1333

New Hampshire

Avenue, Suite

400

Washington,

D.C.

20036

Arizona Public Service

Company

ATTN:

Angela K. Krainik, Hanager

Nuclear Licensing

P.O.

Box 52034

Phoenix,

Arizona

85072-2034

(

ff

(

'

Arizona Public Service

Company

E-Hail report to D. Sullivan

(DJS)

bcc to

DHB (IE01)

SEP

6 l994

bcc distrib.

by RIV:

L. J. Callan

DRSS-F IPB

Branch Chief (DRP/F,

WCFO)

RIV File

Leah Tremper,

OC/LFDCB,

MS:

Resident

Inspector

HIS System

Senior Project Inspector

(DRP/F,

WCFO)

Branch Chief (DRP/TSS)

HNBB 4503

RIV: SR I:DRP/F*

KJohnston

C:DRP/F*

HWong

D:WCFO*

KEPerkins

D:DRP

BBeach 8

t

8/

/94

8/

/94

  • previously concurred

8/

/94

9/6 /94

I

1P

0

I)

I

l

E-Mail report to D. Sullivan

(DJS)

bcc to

DMB (IEOI)

bcc distrib.

by RIV:

L. J. Callan

Resident

Inspector

DRSS-FIPB

MIS System

Branch Chief (DRP/F,

WCFO)

Senior Project Inspector

(DRP/F,

WCFO)

RIV File

Branch Chief (DRP/TSS)

Leah Tremper,

OC/LFDCB,

MS:

MNBB 4503

RIV:SR I:DRP/F*

C: DRP/F*

D:WCFO*

D:DRP

KJohnston

HWong

KEPerkins

BBeach 8

8/

/94

t

8/

/94

  • previously concurred

8/

/94

9/6 /94

1

P

~ y

S

p=