Forwards Insp Repts 50-528/94-20,50-529/94-20 & 50-530/94-20 on 940508-0611 & NOV
ML17310B474
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 07/29/1994
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Stewart W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17310B475 List:
References
NUDOCS 9408020046
Download: ML17310B474 (10)


See also: IR 05000528/1994020

Text

UNIT 6 D STAT ES

NUCLEAR REGULATORY COMMISSION

R EG ION IV

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON,TEXAS 76011 8064

~UL 29 l994

Dockets:

50-528

50-529

50-530

Licenses:

NPF-41

NPF-51

NPF-74

Arizona Public Service

Company

ATTN:

William L. Stewart

Executive Vice President,

Nuclear

P.O.

Box 53999

Phoenix,

Arizona

85072-3999

SUBJECT:

NRC

INSPECTION

REPORT 50-528/94-20;

50-529/94-20;

50-530/94-20

(NOTICE OF VIOLATION)

This refers to the inspection

conducted

by K. Johnston

and others of this

office, on Nay 8 through June ll, 1994.

The inspection

included

a review of

activities authorized for your Palo Verde Nuclear Generating Station,

Units 1,

2,

and 3, facility.

At the conclusion of. the inspection,

the findings were

discussed

with those

members of your staff identified in the enclosed

report.

Areas

examined during the inspection

are identified in the report.

Within

these

areas,

the inspection consisted

of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observation of

activities in progress.

The purpose of the inspection

was to determine

whether activities authorized

by the license

were conducted safely

and in

accordance

with NRC requirements.

Based

on the results of this inspection,

certain licensed activities appeared

to be in violation of NRC requirements,

as specified in the enclosed

Notice of

Violation (Notice).

One violation pertained to an overspeed trip of a

turbine-driven auxiliary feedwater

pump during testing.

Another .violation

pertained to the implementation of a design

change prior to obtaining

a

Technical Specification

amendment

when it had

been recognized that

a Technical

Specification

amendment

may be necessary.

Although the amendment

change

involved was administrative in nature,

we are concerned

because it

demonstrated

a lack of rigor applied to the design

change

process.

Poor-communications

has

been identified as

a significant contributor to other

plant problems,

including the Unit 2 reactor trip on Hay 28,

1994.

These

events

indicate

a need for you to evaluate

whether

management

expectations

concerning

communications

have

been adequately

established

and presented

to

all plant personnel

involved in activities affecting plant safety.

940802004b

940729'DR

ADOCK 05000528

PDR

I

P

i

0

'C

Arizona Public Service

Company

It is our understanding

that, during the exit meeting

conducted

on June

15,

1994,

Ns.

A. Krainik, Nanager,

Nuclear Regulatory Affairs, committed to

reassess'he

position

on diesel

generator reliability testing in accordance

with Regulatory Guide

1. 108

as it pertains to what have

been considered valid

and successful

tests of the diesel

generators

at Palo Verde.

If your

understanding

of this commitment differs from ours,

please

contact

us

immediately.

You are required to respond to this letter

and should follow the instructions

specified in the enclosed

Notice when preparing your response.

In your

response,

you should

document the. specific actions

taken

and any additional

actions

you plan to prevent recurrence.

After reviewing your response

to this

Notice, including your proposed corrective actions

and the results of future

inspections,

the

NRC will determine

whether further

NRC enforcement

action is

necessary

to ensure

compliance with NRC regulatory requirements.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter

and its enclosures will be placed in the

NRC Public Document

Room.

The responses

directed

by this letter

and the enclosed

Notice are not subject

to the clearance

procedures

of the Office of Nanagement

and Budget

as required

by the Paperwork Reduction Act of 1980,

Pub.

L. No. 96.511.

Should you have

any quest.ions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

&n

&'.

Bill Beach, Director

Division of Reactor Projects

Enclosures:

l.

Appendix A Notice of Violation

2.

Appendix

B NRC Inspection

Report

50-528/94-20;

50-529/94-20;

50-530/94-20

cc w/enclosures:

Arizona Corporation

Commission

ATTN:

Nr. Steve

Olea

1200

W. Washington Street

Phoenix,

Arizon'a

85007

Southern California Edison

Company

ATTN:

T.

E. Oubre,

Esq.

P.O.

Box 800

Rosemead,

California

91770

I

0

1

j

f

Arizona

Publ ic Ser vice Company

-3-

ABB Combustion Engineering Nuclear

Power

ATTN:

Charles

B. Brinkman,

Nanager

Washington Nuclear Operations

12300 Twinbrook Parkway, Suite 330

Rockvi lie, Naryland

20852

Arizona Radiation Regulatory Agency

ATTN:

Aubrey V. Godwin, Director

4814 South

40 Street

Phoenix,

Arizona

85040

Naricopa County Board of Supervisors

ATTN:

Chairman

111 South Third Avenue

Phoenix,

Arizona

85003

Newman

5, Holtzinger,

P.C.

ATTN:

Jack

R.

Newman,

Esq.

1615

L Street,

N.W., Suite

1000

Washington,

D.C.

20036

Palo Verde Services

ATTN:

Curtis Hoskins,

Executive

Vice President

and

Chief Operating Officer

2025

N. 3rd Street,

Suite 220

Phoenix,

Arizona

85004

Akin, Gump, Strauss,

Hauer

and Feld

El

Paso Electric Company

ATTN:

Roy P.

Lessey, Jr.,

Esq.

1333

New Hampshire

Avenue, Suite 400

Washington,'D.C.

20036

Arizona Public Service

Company

ATTN:

Angela K. Krainik, Nanager

Nuclear Licensing

P.O.

Box 52034

Phoenix,

Arizona

85072-2034

I

f

)

i

i

f

1

f

!

I

Arizona

Publ ic Ser vice

Company

JUL 2S ISA

E-Nail report to D. Sullivan

(DJS)

bcc to

DNB (IEOl)

bcc distrib. by RIV:

L. J. Callan

DRSS-FIPB

Branch Chief (DRP/F,

WCFO)

RIV File

Leah Tremper,

OC/LFDCB,

NS:

Resident

Inspector

NIS System

Senior Project Inspector

(DRP/F,

WCFO)

Branch Chief (DRP/TSS)

NNBB 4503

RIY:SRI: DRP/F

C:DRP/F

D:WCFO

D:DRP

~

HJWong+

7/12/94

KEJohnston +

previous y concurre

KEPerkins

7/13/94

BBeach~

7/2 /94

'I

J

I

j

j

t

~

I

JUL 29 l998

E-Nail report to D. Sullivan (DJS)

bcc to

DNB (IE01)

bcc distrib.

by RIV:

L. J. Callan

DRSS-FIPB

Branch Chief (DRP/F,

WCFO)

RIV File

Leah Tremper,

OC/LFDCB,

NS:

Resident

Inspector

NIS System

Senior Project Inspector

(DRP/F,

WCFO)

Branch'Chief

(DRP/TSS)

NNBB 4503

C:DRP/F

RIV:SRI: DRP/F

HJWong+

KEJohnston

7/12/94

7/12/94

previously concurre

D:WCFO

KEPerkins

7/13/94

D:DRP

BBeach~

7/7 /94

I