ML17310B393

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-528/94-13,50-529/94-13 & 50-530/94-13 on 940329-0507.Violations & Deviations Noted.Violation of NRC Concern Re Failure of Nonlicensed Operators to Correctly Rack Out Motor Control Center Breaker
ML17310B393
Person / Time
Site: Palo Verde  
Issue date: 06/24/1994
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17310B394 List:
References
NUDOCS 9406300023
Download: ML17310B393 (12)


See also: IR 05000528/1994013

Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

"CCESSION NBR:9406300023

DOC.DATE: 94/06/24

NOTARIZED:

NO

DOCKET

ACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi

05000528

STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi

05000529

STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi

05000530

AUTH.NAME

AUTHOR AFFILIATION

BEACH,A.B.

Region

4 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

CONWAY,W.F.

Arizona Public Service

Co. (formerly Arizona Nuclear

Power

SUBJECT:

Forwards

insp repts

50-528/94-13,50-529/94-13

6 50-530/94-13

on 940329-0507.Violations

a deviations

noted. Violation

of

NRC concern

re failure of nonlicensed

operators

to

correctly rack out motor control center breaker.

DISTRIBUTION CODE:

IEOID

COPIES

RECEIVED:LTR g ENCL J

SIZE:

5 +

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:STANDARDIZED PLANT

Standardized

plant.

Standardized

plant.

05000528

(

05000529

05000530

RECIPIENT

ID CODE/NAME

PDIV-3 PD

TRAN,L

ERNAL: ACRS

AEOD/DSP/ROAB

AEOD/TTC

NRR/DORS/OEAB

NRR/PMAS/ILPB1

NUDOCS-ABSTRACT

OGC/HDS2

RES/HFB

EXTERNAL: EG&G/BRYCE,J.H.

NSIC

COPIES

LTTR ENCL

1

1

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

HOLIAN, B

1

1

NRC

PDR

1

1

AEOD/DEIB

AEOD/DSP/TPAB

DEDRO

NRR/DRCH/HHFB

NRR/PMAS/IRCB-E

OE DIR

~RE

LE

02

~RGN'4

ILE

Ol

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM P !-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION

LISTS I'OR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

23

ENCL

23

~

J

e

~Ps RK00

'k~

~O

++*+>>

UN IT E D STATE S

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON,TEXAS 76011 8064

JUN 24 l994

Dockets:

50-528

50-529

50-530

Licenses:

NPF-41

NPF-51

NPF-74

Arizona Public Service

Company

ATTN:

William F.

Conway

Executive Vice President,

Nuclear

P.O.

Box 53999

Phoenix,

Arizona

85072-3999

SUBJECT:

NRC

INSPECTION

REPORT 50-528/94-13;

50-529/94-13;

50-530/94-13

(NOTICE OF VIOLATION)

This refers to the inspection

conducted

by K. Johnston of this office,

and the

inspectors

identified in the enclosed

report

on March 29 through

Hay 7,

1994.

The inspection

included

a review of activities authorized for your Palo Verde

facility.

At the conclusion of the inspection,

the findings were discussed

with those

members of your staff identified in the enclosed

report.

Areas

examined during the inspection

are identified in the report.

Within

these

areas,

the inspection consisted

of selective

examinations

of procedures

and representative

records,

interviews with personnel,

and observation

of

activities in progress.

Based

on the results of this inspection,

certain licensed activities appeared

to be in violation of NRC requirements,

as specified in the enclosed

Notice of

Violation (Notice).

The violation concerned

the failure of nonlicensed

operators

to correctly rack out

a motor control center breaker.

In addition, certain of your activities appeared

to deviate

from your

commitments

made in

a response

to

a previous Notice of Violation, as specified

in the enclosed

Notice of Deviation (Notice).

In an August 7,

1992, letter in

response

to

a Notice of Violation, the licensee

committed to perform technical

reviews for plant instrumentation

found out of calibration.

The inspector

subsequently

found that these

reviews were not being I:erformed for a

substantial

population of safety-related

instrumentation.

Both the violation and deviation involved issues

previously addressed

by the

inspectors

in which corrective actions

had not been

thorough

and

had not

prevented

recurrence.

These

examples,

and others

in recent inspections,

indicate that, while the immediate actions

taken

by management

in response

to

a problem tend to be aggressive,

the subsequent

followup has not consistently

ensured

that the problem is resolved.

9406300023

940h24

PDR

ADOCK 05000528

8

PDR

J

0

I

I

I

1

+

Arizona Public Service

Company

You are required to respond to this letter and should follow the instructions

specified

in the enclosed

Notices

when preparing your response.

In your

response,

you should document

the specific actions

taken

and

any additional

action you p'lan to prevent recurrence.

After reviewing your response

to these

Notices,

the

NRC will determine

whether further

NRC enforcement

action is

necessary

to ensure

compliance with NRC regulatory requirements.

In accordance

with 10

CFR 2.790 of the

NRC's "Rules of Practice,"

a copy of

this letter

and its enclosures will be placed

in the

NRC Public Document

Room.

The responses

directed

by this letter

and the enclosed

Notice are not subject

to the clearance

procedures

of the Office of Management

and Budget

as required

by the Paperwork

Reduction Act of 1980,

Pub.

L. No. 96.511.

Should you have

any questions

concerning this inspection,

we wi')1 be glad to

discuss

them with you.

Sincerely,

8v'.

Bi l Beach,

Director

Division of Reactor Projects

Enclosures:

l.

Appendix

A - Notice of Violation

2.

Appendix

B - Notice of Deviation

3.

Appendix

C -

NRC Inspection

Report

50-528/94-13;

50-529/94-13;

50-530/94-13

cc w/enclosures:

"Arizona Corporation

Commission

ATTN:

Mr. Steve

Olea

1200

M. Mashington Street

Phoenix,

Arizona

85007

Southern California Edison

Company

ATTN:

James

A. Beoletto,

Esq.

P.O.

Box 800

Rosemead,

California

91770

ABB Combustion

Engineering

Nuclear

Power

ATTN:

Charles

B. Brinkman,

Manager

Washington

Nuclear Operations

12300 Twinbrook Parkway,

Suite

330

Rockville, Maryland

20852

T

0

Arizona Public Service

Company

Arizona Radiation Regulatory

Agency

ATTN:

Aubrey V. Godwin, Director

4814 South

40 Street

Phoenix,

Arizona

85040

Maricopa County Board of Supervisors

ATTN:

Chairman

111 South Third Avenue

Phoenix,

Arizona

85003

Newman

& Holtzinger,

P.C.

ATTN:

Jack

R.

Newman,

Esq.

1615

L Street,

N.W ~ , Suite

1000

Washin"ton,

D.C.

20036

Palo Verde Services

ATTN:

Curtis Hoskins,

Executive

Vice President

and

Chief Operating Officer

2025

N. 3rd Street,

Suite

220

Phoenix,

Arizona

85004

Akin, Gump, Strauss,

Hauer

and Feld

El

Paso Electric Company

ATTN:

Roy P.

Lessey, Jr.,

Esq.

1333

New Hampshire

Avenue,

Suite

400

Washington,

D.C.

20036

Arizona Public Service

Company

ATTN:

Angela K. Krainik, Manager

Nuclear Licensing

P.O.

Box 52034

Phoenix,

Arizona

85072-2034

I

>>

I

',li

() r

,

1

Arizona Public Service

Company

E-Hail report to D. Sullivan

(DJS)

bcc to

DHB (IE01)

bcc distrib.

by RIV:

L. J. Callan

DRSS-FIPB

Branch Chief (DRP/F)

RIV File

Leah Tremper,

OC/LFDCB, HS:

bcc w/o enclosure:

H. Smith,

WCFO

J. Bianchi,

WCFO

Resident

Inspector

HIS System

Senior Project Inspector

(DRP/F)

Branch Chief (DRP/TSS)

HNBB 4503

(~cfCr

i +i </6pY

RIV:SR:D

P

F

DRP

F

C: D WCFO

D:DRP

KJoh ston;K

5/20

94

DAckek~

~)~he

KPerkins

BBeachM

0'

I

I

Arizona Public Service

Company

)ON 24

1994

E-Hail report to D. Sullivan

(DJS)

bcc to

DMB (IEDI)

bcc distrib.

by RIV:

L. J. Callan

DRSS-F IPB

Branch Chief (DRP/F)

RIV File

Leah Tremper,

OC/LFDCB,

bcc w/o enclosure:

H.

~ ith,

WCFO

J. Bianchi,

WCFO

Resident

Inspector

HIS System

Senior Project

Inspector

(DRP/F)

Branch Chiyf (DRP/TSS)

HS:

HNBB 4503

(~d 0

RIV:SR:DRP

F

KJoh stoo;K

5/20

94

DRP

F

DAckok~

C: D WCFO

KPerkins

D:DRP

BBeachM

r1

0

p

1

0