ML17310B321

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-528/94-21,50-529/94-21 & 50-530/94-21.No Violations Noted
ML17310B321
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 05/26/1994
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
References
NUDOCS 9406020043
Download: ML17310B321 (12)


See also: IR 05000528/1994021

Text

'REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9406020043

DOC.DATE: 94/05/26

NOTARIZED:

NO

DOCKET

CIL:STN-50"528 Palo Verde Nuclear, Station,

Unit 1, Arizona Publi

05000528

STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi

05000529

STN-50-530 Palo Verde Nuclear Station,

Unit 3, Arizona Publi

05000530

AUTH.NAME

AUTHOR AFFILIATION

GWYNN,T.P.

Region

4 (Post

820201).

RECIP.NAME

RECIPIENT AFFILIATION

CONWAY,W.F.

Arizona Public Service

Co. (formerly Arizona Nuclear

Power

SUBJECT:

Forwards insp repts

50-528/94-21,50-529/94-21

6

50-530/94-21.No .violations noted.

DISTRIBUTION CODE:

IE42D

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: Operator Licensing Examination Repor'ts

NOTES:STANDARDIZED PLANT

Standardized

plant.

Standardized

plant.

5

05000528

05000529

05000530

(.

RECIPIENT

ID CODE/NAME

PDIV-3 PD

TRAN,L

INTERNAL: ACRS

NRR/DRCH/HOLB10

RGN4

FILE

01

COPIES

LTTR ENCL

1

1

1

1

2

2

1

1

1

1

RECIPIENT

ID CODE/NAME

HOLIAN, B

NRR/DRCH/HHFBPT

ER FIL

02

COPIES

LTTR ENCL

1

1

1

0

1

1

ERNAL:

NRC

PDR

1

1

NSIC

1

1

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION

LISTS FOR DOCUMENTS YOU DON'T

NEED'OTAL

NUMBER OF COPIES

REQUIRED:

LTTR

11

ENCL

10

h

~

e

'Ep 8 RECu 'Ip0

I

o

p g

+**++

UNIT E D STATE6

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA DRIVE~ SUITE 400

AR LINGTON,TEXAS 76011 8064

MAY 26 ling

Dockets:

50-528

5D-529

50-530

Licenses:

NPF-41

NPF-51

NPF-74

Arizona Public Service

Company

ATTN:

William F.

Conway

Executive Vice President,

Nuclear

P.O.

Box 53999

Phoenix,

Arizona

85072-3999

SUBJECT:

NRC

INSPECTION

REPORT 50-528/94-21;

50-529/94-21;

50-530/94-21

In

a telephone

conversation

on Hay 5,

1994 between

Hr.

Bob Nunez,

Operations

Training Hanager

and Hr. T. 0. HcKernon,

Licensed Operator

Examiner,

arrangements

were

made for the administration of licensing examinations

at the

Palo Verde Station.

The written examinations

are scheduled tentatively for October

14,

1994,

and

the operating tests

are scheduled for October 17-21.

Your staff will be given

an opportunity to review the licensing examinations

in accordance

with the

guidelines

in Revision

7 of NUREG-1021,

"Operator Licensing Examiner

Standards,"

(ES-201,

Attachment

4) during the week of September

26,

1994.

To prepare

the examinations

and meet the above schedule, it will be necessary

for your staff to furnish the reference

materials identified in Attachment'

of ES-201

by July 30,

1994.

Any delay in receiving approved

and indexed

reference

material or the submittal of inadequate

or incomplete reference

material

may result in the examinations

being rescheduled.

The

NRC will prepare

and administer the written examinations

in accordance

with ES-401,and

ES-402 of NUREG-1021.

In order to conduct the requested

examinations, it will be necessary

for your staff to provide adequate

space

and accommodations

on the date noted

above.

The NRC's guidelines for

administering'he written examinations

are described

in ES-402,

Attachment l.

The

NRC will prepare

and administer the operating tests

in accordance

with

ES-301

and

ES-302 of NUREG-1021.

In order to conduct the requested

operating

tests, it will be necessary

for your staff to make the simulation facility

available

on the dates

noted

above

and during the onsite preparatory

week,

October 12-14,

1994.

Your staff should retain the original simulator

performance

data (e.g.,

system pressures,

temperatures,

and levels) generated

during the dynamic operating tests until the examination results

are final.

940b020043

94052b

PDR

ADOCK 05000528

9

PDR

J

a

Arizona Public Service

Company

Attachment

2 of ES-402

and Attachment

1 of ES-302 contain

a number of NRC

policies

and guidelines that will be in effect while the written examination

and operating tests

are being administered.

Your staff should submit preliminary reactor operator

and senior reactor

operator license applications

and waiver requests

at least

30 days before the

first examination

date

so that the

NRC will be able to review the applications

and the medical certifications

and evaluate

any requested

waivers.

If the

applications

are not received at least

30 days before the examination date;

a

postponement

may be necessary.

Final, signed applications certifying that all

training has

been

completed

should

be submitted at least

14 days before the

first examination date.

This request is covered

by Office of Management

and Budget

(OMB) Clearance

Number 3150-0101,

which expires October 31,

1995.

The estimated

average

burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response,

including gathering,

copying and mailing the

required material.

Send

comments

regarding this burden estimate

or any other

aspect of this collection of information, including suggestions

for reducing

this burden,

to the Information and Records

Management

Branch,

HNBB-7714,

Division of Information Support Services,

Office of Information Resources

Hanagement,

U.S. Nuclear Regulatory

Commission,

Washington,

D.C. 20555;

and to

the Paperwork Reduction Project

(3150-0101),

Office of Information and

Regulatory Affairs, NEOB-3019, Office of Hanagement

and Budget,

Washington,

D.C. 20503.

Thank you for your cooperation

in this matter.

Hr. Nunez

has

been

advised of

the policies

and guidelines

referenced

in this letter.

If you have

any

questions

regarding the

NRC's examination

procedures

and guidelines,

please

contact Hr.

Tom HcKernon at (817) 860-8153,

or Hr. John Pellet at

(817) 860-8159.

Sincerely,

Thomas

P.

Gwynn, Director

Division of Reactor Safety

cc:

Arizona Corporation

Commission

ATTN:

Hr. Steve

Olea

1200

W. Washington Street

Phoenix,

Arizona

85007

X

Southern California Edison

Company

ATTN:

James

A. Beoletto,

Esq.

P.O.

Box 800

Rosemead,

California

91770

8

Arizona Public Service

Company

ABB Combustion

Engineering

Nuclear

Power

'ATTN:

Charles

B. Brinkman,

Manager

Washington Nuclear Operations

12300 Twinbrook Parkway,

Suite

330

Rockville, Maryland

20852

Arizona Radiation Regulatory

Agency

ATTN:

Aubrey V. Godwin, Director

4814 South

40 Street

Phoenix,

Arizona

85040

Maricopa County Board of Supervisors

ATTN:

Chairman

111

South Third Avenue

Phoenix,

Arizona

85003

Newman

3 Holtzinger,

P.C.

ATTN:

Jack

R.

Newman,

Esq.

1615

L Street,

N.W., Suite

1000

Washington,

D.C.

20036

Palo Verde Services

ATTN:

Curtis Hoskins,

Executive

Vice President

and

Chief Operating Officer

2025

N. 3rd Street,

Suite

220

Phoenix,

Arizona

85004

Akin, Gump, Strauss,

Hauer

and Feld

El

Paso Electric

Company

ATTN:

Roy P.

Lessey, Jr.,

Esq.

1333

New Hampshire

Avenue, Suite

400

Washington,

D.C.

20036

Arizona Public Service

Company

ATTN:

Angela

K. Krainik, Manager

Nuclear Licensing

P.O.

Box 52034

Phoenix,

Arizona

85072-2034

\\

0

l

I

1

0

Arizona Public Service

Company

E-Hail report to 0. Sullivan

(DJS)

bcc to

DMB IEOl

8

IE42

bcc distrib.

by RIV:

L. J. Callan

DRSS-FIPB

Branch Chief (DRP/F,

WCFO)

RIV File

Leah Tremper,

OC/LFDCB, HS:

Branch Chief,

DRS/OB

J.

L. Pellet Reading File

r

P

Resident

Inspector

HIS System

Senior Project Inspector

(DRP/F,

WCFO)

Branch Chief (DRP/TSS)

MNBB 4503

Chief Examiner

RIV:RI:OB:DRS

TOMcKernon

C:OB*

JLPellet

ADD:DR

JAHitchell

94

0:DRP

ABBeach

94

0: DRS~~

TPGwynn

5

26 94

0

previously concurre

d

I

)

)

Arizona Public Service

Company

E-Mail report to D. Sullivan

(DJS)

bcc to DMB~Rclk$ff45i,'jq

bcc distrib.

by RIV:

L. J. Callan

DRSS-F IPB

Branch Chief (DRP/F,

WCFO)

RIV File

Leah Tremper,

OC/LFDCB,

MS:

Branch Chief,

DRS/OB

J.

L. Pellet

Reading File

Resident

Inspector

MIS System

Senior Project Inspector

(DRP/F,

WCFO)

Branch Chief (DRP/TSS)

MNBB 4503

Chief Examiner

RIV:RI:OB:DRS

C:OB*

ADD:DR

D:DRP

D:DRS ~~

TOMcKernon

JLPellet

previously concurre

94

94

d

JAMitchell

94

ABBeach

94

TPGwynn

94

0