ML17310B321
| ML17310B321 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 05/26/1994 |
| From: | Gwynn T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Conway W ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| References | |
| NUDOCS 9406020043 | |
| Download: ML17310B321 (12) | |
See also: IR 05000528/1994021
Text
'REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9406020043
DOC.DATE: 94/05/26
NOTARIZED:
NO
DOCKET
CIL:STN-50"528 Palo Verde Nuclear, Station,
Unit 1, Arizona Publi
05000528
STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi
05000529
STN-50-530 Palo Verde Nuclear Station,
Unit 3, Arizona Publi
05000530
AUTH.NAME
AUTHOR AFFILIATION
GWYNN,T.P.
Region
4 (Post
820201).
RECIP.NAME
RECIPIENT AFFILIATION
CONWAY,W.F.
Arizona Public Service
Co. (formerly Arizona Nuclear
Power
SUBJECT:
Forwards insp repts
50-528/94-21,50-529/94-21
6
50-530/94-21.No .violations noted.
DISTRIBUTION CODE:
IE42D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: Operator Licensing Examination Repor'ts
NOTES:STANDARDIZED PLANT
Standardized
plant.
Standardized
plant.
5
05000528
05000529
05000530
(.
RECIPIENT
ID CODE/NAME
PDIV-3 PD
TRAN,L
INTERNAL: ACRS
NRR/DRCH/HOLB10
RGN4
FILE
01
COPIES
LTTR ENCL
1
1
1
1
2
2
1
1
1
1
RECIPIENT
ID CODE/NAME
HOLIAN, B
NRR/DRCH/HHFBPT
ER FIL
02
COPIES
LTTR ENCL
1
1
1
0
1
1
ERNAL:
NRC
1
1
1
1
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION
LISTS FOR DOCUMENTS YOU DON'T
NEED'OTAL
NUMBER OF COPIES
REQUIRED:
LTTR
11
ENCL
10
h
~
e
'Ep 8 RECu 'Ip0
I
o
p g
+**++
UNIT E D STATE6
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZA DRIVE~ SUITE 400
MAY 26 ling
Dockets:
50-528
50-530
Licenses:
NPF-51
Arizona Public Service
Company
ATTN:
William F.
Conway
Executive Vice President,
Nuclear
P.O.
Box 53999
Phoenix,
85072-3999
SUBJECT:
NRC
INSPECTION
REPORT 50-528/94-21;
50-529/94-21;
50-530/94-21
In
a telephone
conversation
on Hay 5,
1994 between
Hr.
Bob Nunez,
Operations
Training Hanager
and Hr. T. 0. HcKernon,
Licensed Operator
Examiner,
arrangements
were
made for the administration of licensing examinations
at the
Palo Verde Station.
The written examinations
are scheduled tentatively for October
14,
1994,
and
the operating tests
are scheduled for October 17-21.
Your staff will be given
an opportunity to review the licensing examinations
in accordance
with the
guidelines
in Revision
7 of NUREG-1021,
"Operator Licensing Examiner
Standards,"
(ES-201,
Attachment
4) during the week of September
26,
1994.
To prepare
the examinations
and meet the above schedule, it will be necessary
for your staff to furnish the reference
materials identified in Attachment'
of ES-201
by July 30,
1994.
Any delay in receiving approved
and indexed
reference
material or the submittal of inadequate
or incomplete reference
material
may result in the examinations
being rescheduled.
The
NRC will prepare
and administer the written examinations
in accordance
with ES-401,and
ES-402 of NUREG-1021.
In order to conduct the requested
examinations, it will be necessary
for your staff to provide adequate
space
and accommodations
on the date noted
above.
The NRC's guidelines for
administering'he written examinations
are described
in ES-402,
Attachment l.
The
NRC will prepare
and administer the operating tests
in accordance
with
and
ES-302 of NUREG-1021.
In order to conduct the requested
operating
tests, it will be necessary
for your staff to make the simulation facility
available
on the dates
noted
above
and during the onsite preparatory
week,
October 12-14,
1994.
Your staff should retain the original simulator
performance
data (e.g.,
system pressures,
temperatures,
and levels) generated
during the dynamic operating tests until the examination results
are final.
940b020043
94052b
ADOCK 05000528
9
J
a
Arizona Public Service
Company
Attachment
2 of ES-402
and Attachment
1 of ES-302 contain
a number of NRC
policies
and guidelines that will be in effect while the written examination
and operating tests
are being administered.
Your staff should submit preliminary reactor operator
and senior reactor
operator license applications
and waiver requests
at least
30 days before the
first examination
date
so that the
NRC will be able to review the applications
and the medical certifications
and evaluate
any requested
waivers.
If the
applications
are not received at least
30 days before the examination date;
a
postponement
may be necessary.
Final, signed applications certifying that all
training has
been
completed
should
be submitted at least
14 days before the
first examination date.
This request is covered
by Office of Management
and Budget
(OMB) Clearance
Number 3150-0101,
which expires October 31,
1995.
The estimated
average
burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response,
including gathering,
copying and mailing the
required material.
Send
comments
regarding this burden estimate
or any other
aspect of this collection of information, including suggestions
for reducing
this burden,
to the Information and Records
Management
Branch,
HNBB-7714,
Division of Information Support Services,
Office of Information Resources
Hanagement,
U.S. Nuclear Regulatory
Commission,
D.C. 20555;
and to
the Paperwork Reduction Project
(3150-0101),
Office of Information and
Regulatory Affairs, NEOB-3019, Office of Hanagement
and Budget,
D.C. 20503.
Thank you for your cooperation
in this matter.
Hr. Nunez
has
been
advised of
the policies
and guidelines
referenced
in this letter.
If you have
any
questions
regarding the
NRC's examination
procedures
and guidelines,
please
contact Hr.
Tom HcKernon at (817) 860-8153,
or Hr. John Pellet at
(817) 860-8159.
Sincerely,
Thomas
P.
Gwynn, Director
Division of Reactor Safety
cc:
Arizona Corporation
Commission
ATTN:
Hr. Steve
Olea
1200
W. Washington Street
Phoenix,
85007
X
Southern California Edison
Company
ATTN:
James
A. Beoletto,
Esq.
P.O.
Box 800
Rosemead,
91770
8
Arizona Public Service
Company
ABB Combustion
Engineering
Nuclear
Power
'ATTN:
Charles
B. Brinkman,
Manager
Washington Nuclear Operations
12300 Twinbrook Parkway,
Suite
330
Rockville, Maryland
20852
Arizona Radiation Regulatory
Agency
ATTN:
Aubrey V. Godwin, Director
4814 South
40 Street
Phoenix,
85040
Maricopa County Board of Supervisors
ATTN:
Chairman
111
South Third Avenue
Phoenix,
85003
Newman
3 Holtzinger,
P.C.
ATTN:
Jack
R.
Newman,
Esq.
1615
L Street,
N.W., Suite
1000
D.C.
20036
Palo Verde Services
ATTN:
Curtis Hoskins,
Executive
Vice President
and
Chief Operating Officer
2025
N. 3rd Street,
Suite
220
Phoenix,
85004
Akin, Gump, Strauss,
Hauer
and Feld
El
Paso Electric
Company
ATTN:
Roy P.
Lessey, Jr.,
Esq.
1333
Avenue, Suite
400
D.C.
20036
Arizona Public Service
Company
ATTN:
Angela
K. Krainik, Manager
Nuclear Licensing
P.O.
Box 52034
Phoenix,
85072-2034
\\
0
l
I
1
0
Arizona Public Service
Company
E-Hail report to 0. Sullivan
(DJS)
bcc to
DMB IEOl
8
IE42
bcc distrib.
by RIV:
L. J. Callan
DRSS-FIPB
Branch Chief (DRP/F,
WCFO)
RIV File
Leah Tremper,
OC/LFDCB, HS:
Branch Chief,
DRS/OB
J.
L. Pellet Reading File
r
P
Resident
Inspector
HIS System
Senior Project Inspector
(DRP/F,
WCFO)
Branch Chief (DRP/TSS)
MNBB 4503
Chief Examiner
RIV:RI:OB:DRS
TOMcKernon
C:OB*
JLPellet
ADD:DR
JAHitchell
94
0:DRP
ABBeach
94
0: DRS~~
TPGwynn
5
26 94
0
previously concurre
d
I
)
)
Arizona Public Service
Company
E-Mail report to D. Sullivan
(DJS)
bcc to DMB~Rclk$ff45i,'jq
bcc distrib.
by RIV:
L. J. Callan
DRSS-F IPB
Branch Chief (DRP/F,
WCFO)
RIV File
Leah Tremper,
OC/LFDCB,
MS:
Branch Chief,
DRS/OB
J.
L. Pellet
Reading File
Resident
Inspector
MIS System
Senior Project Inspector
(DRP/F,
WCFO)
Branch Chief (DRP/TSS)
MNBB 4503
Chief Examiner
RIV:RI:OB:DRS
C:OB*
ADD:DR
D:DRP
D:DRS ~~
TOMcKernon
JLPellet
previously concurre
94
94
d
JAMitchell
94
ABBeach
94
TPGwynn
94
0