ML17310A581
| ML17310A581 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 09/02/1993 |
| From: | Linh Tran Office of Nuclear Reactor Regulation |
| To: | Conway W ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| Shared Package | |
| ML17310A582 | List: |
| References | |
| TAC-M85821, TAC-M85822, TAC-M85823, NUDOCS 9309140095 | |
| Download: ML17310A581 (6) | |
Text
Docket Nos. 50-528, 50-529, and 50-530 Hr. William F.
Conway Executive Vice President, Nuclear Arizona Public Service Company P.O.
Box 53999
- Phoenix, Arizona 85072-3999
Dear Mr. Conway:
September 2, i 99~
~~REDISTRIBUTED>
~ADDING-DATETO
~SAFETY EVALUATION~
SUBJECT:
SAFETY EVALUATION FOR FUEL ASSEMBLY SHOULDER GAP MEASUREMENTS (TAC NOS.
- H85821, H85822, AND M85823)
By letter dated January 25, 1993, you requested NRC approval to discontinue fuel assembly shoulder gap measurements.
In support of your request, you provided CEN-419(V)P, "Palo Verde Nuclear Generating Station Unit 1 End-of-Cycle 3 Fuel Examination Report."
This report contains the results of fuel rod shoulder gap measurements made by ABB-Combustion Engineering, Inc. during the Unit 1 cycle 3 refueling outage.
The NRC staff has completed its review and concludes that the commitment to perform shoulder gap measurements to ensure adequate clearance is no longer necessary for Palo Verde Units 1, 2, and 3.
A copy of the related Safety Evaluation is enclosed.
This completes the staff's effort on this issue and closes TAC Nos.
- H85821, H85822, and H85823.
Sincerely, Original signed by:
Linh N. Tran, Project Manager Project Directorate V
Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation
Enclosure:
Safety Evaluation cc w/enclosure:
See next page DISTRIBUTION:
LDocket Fi-leg JRoe EBarnhill SWu
P315 OFFICE HAHE DATE PDV LA I j,
~
EBarnhill; I:"
-'~ 93 PDV PH LTran L.x
/9 93 PD P
m ell uay 93 93 OFFICIAL RECORD COPY D CUMENT NAME:
85821.LTR 9309i40095 930902 PDR ADOCK 05000528 P'DR MC KE ~TR MV
f
\\
'", l II
~pS REay,
+
0 Cy A
I I
s Vl
'c g 0
T
()N
+a*++
t UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 September 2,
1993
- RED ISTR IBUTED ADDING DATE TO SAFETY EVALUATION Docket Nos. 50-528, 50-529, and 50-530 Hr. William F.
Conway Executive Vice President, Nuclear Arizona Public Service Company P.O.
Box 53999 Phoenix, Arizona 85072-3999
Dear Hr. Conway:
SUBJECT:
SAFETY EVALUATION FOR FUEL ASSEHBLY SHOULDER GAP HEASUREHENTS (TAC NOS.
- H85821, H85822, AND H85823)
By letter dated January 25, 1993, you requested NRC approval to discontinue fuel assembly shoulder gap measurements.
In support of your request, you provided CEN-419(V)P, "Palo Verde Nuclear Generating Station Unit 1 End-of-Cycle 3 Fuel Examination Report."
This report contains the results of fuel rod shoulder gap measurements made by ABB-Combustion Engineering, Inc. during the Unit 1 cycle 3 refueling outage.
The NRC staff has completed its review and concludes that the commitment to perform shoulder gap measurements to ensure adequate clearance is no longer necessary for Palo Verde Units 1, 2, and 3.
A copy of the related Safety Evaluation is enclosed.
This completes the'taff's effort on this issue and closes TAC Nos.
- H85821, H85822, and H85823.
Sincerely,
Enclosure:
Safety Evaluation cc w/enclosure:
See next page Linh N. Tran, Project Hanager Project Directorate V
Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation
I 1
Mr. William F.
Conway Arizona Public Service Company Palo Verde CC:
Mr. Steve Olea Arizona Corporation Commission 1200 W. Washington Street
- Phoenix, Arizona 85007 James A. Beoletto, Esq.
Southern California Edison Company P. 0.
Box 800
- Rosemead, California 91770 Senior Resident Inspector Palo Verde Nuclear Generating Station 5951 S. Wintersburg Road
- Tonopah, Arizona 85354-7537 Regional Administrator, Region V
U. S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations ABB Combustion Engineering Nuclear Power 12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Mr. Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 South 40 Street
- Phoenix, Arizona 85040 Chairman Maricopa County Board of Supervisors 111 South Third Avenue
- Phoenix, Arizona 85003 Jack R.
- Newman, Esq.
Newman
& Moltzinger, P.C.
1615 L Street, N.W., Suite 1000 Washington, D.C.
20036 Mr. Curtis Hoskins Executive Vice President and Chief Operating Officer Palo Verde Services 2025 N. 3rd Street, Suite 220
- Phoenix, Arizona 85004 Roy P.
Lessey, Jr.,
Esq.
Bradley W. Jones, Esq.
Akin, Gump, Strauss, Hauer and Feld El Paso Electric Company 1333 New Hampshire Ave., Suite 400 Washington, D.C.
20036 Mr. Thomas R. Bradish, Manager Nuclear Regulatory Affairs Arizona Public Service Company P. 0.
Box 52034
- Phoenix, Arizona 85072-2034
l I