ML17310A316
| ML17310A316 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 06/08/1993 |
| From: | Trammell C Office of Nuclear Reactor Regulation |
| To: | Conway W ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| Shared Package | |
| ML17310A318 | List: |
| References | |
| TAC-M86178, NUDOCS 9306100267 | |
| Download: ML17310A316 (6) | |
Text
June 8, 1993 Docket No. 50-529 Mr. William F.
Conway fxecutive Vice President, Nuclear Arizona Public Service Company Post Office Box 53999
- Phoenix, Arizona 85072-3999
Dear Mr. Conway:
SUBJECT:
REVIEW OF EDDY-CURRENT INSPECTIONS OF STEAM GENfRATOR TUBfS PALO VERDE NUCLEAR GENERATING STATION, UNIT NO.
2 (TAC NO. H86178)
During the period Hay 4 through Hay 6, 1993, the Office of Nuclear Reactor Regulation's consultant, C. V. Dodd of the Oak Ridge National Laboratory, visited the Palo Verde site for the purpose of reviewing the on-going eddy-current inspection of the Palo Verde Unit 2 steam generator tubes.
A copy of his report is enclosed for your information.
Sincerely, Original signed by:
Enclosure:
ORNL Report dated June 4,
1993 cc w/enclosure:
See next page Charles M. Trammell, Senior Project Manager Project Directorate V
Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation DISTRIBUTION:
Docket File PDV Reading File EAdensam DFoster LTran fy ~j 0 O
~ >
ACRS(10),
P-$15 NRC
& Local PDRs JRoe TQuay CTrammell
- OGC, 15B18
- KPerkins, RV OFC NAME DATE PDV LA DFoster'4
/
93 PDV/PH LTran 4'/~ 93 P V/P T
mmell
/
/93 PDV D
TQuay<
4/V /93 OFFICIAL RECORD COPY 930bi00267 930608 PDR ADOCK 05000M9 8
PDR DOCUMENT NAMf:PV86178.LTR f
j,J 1
)
f) )(P
/g l
'L II't
gP,R REGI fp0
\\
)
0 "g
+ y**W UNITED STATES NUCLEAR REGULATORY COIVlMISSION WASHINGTON. D.C. 20555.0001 June 8, 1993 Docket No. 50-529 Mr. William F.
Conway Executive Vice President, Nuclear Arizona Public Service Company Post Office Box 53999
- Phoenix, Arizona 85072-3999
Dear Mr. Conway:
SUBJECT:
REVIEW OF EDDY-CURRENT INSPECTIONS OF STEAM GENERATOR TUBES PALO VERDE NUCLEAR GENERATING STATION, UNIT NO.
2 (TAC NO.
M86178)
During the period May 4 through May 6,
- 1993, the Office of Nuclear Reactor Regulation's consultant, C.
V. Dodd of the Oak Ridge National Laboratory, visited the Palo Verde site for the purpose of reviewing the on-going eddy-current inspection of the Palo Verde Unit 2 steam generator tubes.
A copy of his report is enclosed for your information.
Sincerely,
Enclosure:
ORNL Report dated June 4,
1993 cc w/enclosure:
See next page
- m. ~v Charles M, Trammell, Senior Project Manager Project Directorate V
Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation
jl
Mr. William F.
Conway Arizona Public Service Company Palo Verde CC:
Mr. Steve Olea Arizona Corporation Commission 1200 W. Washington Street
- Phoenix, Arizona 85007 James A. Beoletto, Esq.
Southern California Edison Company P. 0.
Box 800
- Rosemead, California 91770 Senior Resident Inspector U.S. Nuclear Regulatory Commission HC-03 Box 293-NR
- Buckeye, Arizona 85326 Regional Administrator, Region V
U.
S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations ABB Combustion Engineering Nuclear Power 12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Mr. William A. Wright, Acting Director Arizona Radiation Regulatory Agency 4814 South 40 Street
- Phoenix, Arizona 85040 Chairman Maricopa County Board of Supervisors 111 South Third Avenue
- Phoenix, Arizona 85003 Jack R.
- Newman, Esq.
Newman 8 Holtzinger, P.C.
1615 L Street, N.W., Suite 1000 Washington, D.C.
20036 Mr. Curtis Hoskins Executive Vice President and Chief Operating Officer Palo Verde Services 2025 N. 3rd Street, Suite 220
- Phoenix, Arizona 85004 Roy P.
Lessey, Jr.,
Esq.
Bradley W. Jones, Esq.
Akin, Gump, Strauss, Hauer and Feld El Paso Electric Company 1333 New Hampshire Ave., Suite 400 Washington, D.C.
20036