ML17308A210

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-335/86-05 & 50-389/86-04 on 86021l-0310.No Violations or Deviations Noted
ML17308A210
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/26/1986
From: Panciera V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Woody C
FLORIDA POWER & LIGHT CO.
Shared Package
ML17308A211 List:
References
NUDOCS 8604020536
Download: ML17308A210 (1)


See also: IR 05000335/1986005

Text

Florida Power and;.Light Company

ATTN:

Mr. C. 0:

Woody

Group Vice President

Nuclear Energy Department

P. 0.

Box 14000

Juno

Beach,

FL

33408

MAR 26

1S86

Gentlemen:

SUBJECT:

REPORT

NOS. 50"335/ 6-05

ND 50-389/86"04

On

February ll

March 10,

1986,

NRC

inspected

activities

authorized

by

NRC

License

Nos.

DPR-67

and

NPF-16 for your St.

Lucie facility.

At the conclusion of

the inspection,

the findings were discussed

with those

members

of you

staff

identified in the enclosed

inspection report.

Areas

examined during the inspection

are identified in the ~eport.

Within these

areas,

the

inspection

consisted

of selective

examinations

of procedures

. and

representative

records,

interviews with personnel,

and observation

of activities

in progress.

Within the

scope of the inspection,

no violations or deviations

were identified.

~ P

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely,

Vincent W. Panciera,

Chief

Reactor Projects

Branch

2

Division of Reactor Projects

Enclosure:

Inspection

Report

Nos.

50-335/86-05

and

389/86-04

cg'/encl:

'C.

N. Harris, Vice President

St.

Lucie Nuclear Pla&

M A. Sager,

Plant 'Ra'nager

O'.

Weems, Site

gA Superintendent

bye w/encl:

KRC Resident

Inspector

Document Control

Desk

State of Florida

RQI

SGuenther:lb

03~/86

RI

E rod

03/gP/86

RII

D c 'uire

3/$ /86

8604020536

860326

PDR

ADOCK 05000835'

PDR