Grants Relief from Certain Requirements of ASME Code Section XI Re Pump & Valve Testing.Safety Evaluation Encl.Review Effort Re Requests Dealing W/Inservice Testing of Pumps & Valves for First 10-yr Insp Interval Concluded
ML17308A176
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 01/13/1986
From: Thadani A
Office of Nuclear Reactor Regulation
To: Woody C
FLORIDA POWER & LIGHT CO.
Shared Package
ML17308A177 List:
References
TAC-56707, NUDOCS 8601220333
Download: ML17308A176 (5)


Text

ENCLOSURE 2

January 13, 1986 Docket No. 50-389 Mr. C. 0.

Woody Group Vice President Nuclear Energy Florida Power 5 Light Company P. 0.

Box 14000 Juno

Reach, Florida 33408 Distribution:

Docket File NRC A

L POR-St Lucie Files PRO¹8 Pdg OSells PKreutzer EJordan BGrimes ACRS 10 OELD AThadani FMiraglia HDenton/DEisenhut ORAS JPartlow Tt3arnhart 4

OPA LFMB SUB >ECT:

RELIEF FROM PARTS OF ASME CODE SECTION XI Ry letter dated October 6, 1983 you requested relief from certain pump and valve testing.

In addition, the staff reviewers obtained clarifying information in telephone calls and during an inspection of August 26-30, 1985 at the St. Lucie Plant site.

Our review of'our request for relief from parts of ASME Code Section XI has been completed.

Based on the results of our review, we have determined that there are cases in which the requested relief can be granted, conditionally granted or denied.

A tabulation showing the disposition of each request For-relief is contained in Attachment 1 to the enclosed Safety Evaluation.

Details concerning each request can be found in the Safety Evaluation.

For the reliefs that have been granted, we have determined that the code requirements are impractical and that the relief requests are authorized by law and will not endanger life or property or the common defense and security and are otherwise in the public interest, giving due consideration to the burden upon the licensee that could result if the code requirements were imposed on the Facility.

The relief from certain requirements of ASME Code Section XI is hereby granted as detailed in the enclosed Safety Evaluation.

This concludes our review effort on your requests dealing with the inservice testing of pumps and valves durino the First 10-year inspection interval for St. Lucie Plant, Unit No. 2.

This work was performed under NRC TAC No. 56707.

IF you have any questions, contact the project manager, O. Sells, at (301) 492-9735.

Sincerely, (c

Ashok C. Thadani, Director PWR Project Directorate'¹8 Division of PWR Licensina-B

Enclosure:

Safety Fvaluation cc w/enclosure:

See next page

  • See previous white for concurrences

- cc name change only PBO¹8" PBD¹8*

OELD*

PBD¹8*

0:PWR-8*

PKreutzer DSells;ef McGur ren

. AThadani FMiraglia 12/17/85 12/30/85 1/2/86 1/9/86 1/10/86

Mr. C. 0.

Woody Florida Power

& Lfght Company St. Lucfe Plant Cco Mr. Jack Shreve Offfce of the Public Counsel Room 4, Holland Building Tallahassee, Florfda 32304 Resident Inspector c/o U.S.

NRC 7585 S.

Hwy AIA Jensen Beach, Florida 33457 State Planning

& Development Clearinghouse Offfce of Planning

& Budget Executive Office of the Governor The Capitol Building Tallahassee, Florfda 32301 Harold F. Refs, Esq.

Newman

& Holtzfnger 1615 L Street, N.W.

Washington, DC 20036 Norman A. Coll, Esq.

McCar'thy, Steel, Hector and Davis 14th Floor, First Natfonal Bank Building Miami, Florida 33131 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Mr. Weldon B. Lewis> County Administrator St. Lucfe County 2300 Vfrgfnfa Avenue, Room 104 Fort Pierce, Florida 33450 Mr. Charles B. Brfnkman, Manager Washington - Nuclear Operations Combustion Engineering, Inc.

7910 Woodmont Avenue

Bethesda, Maryland 20814 Mr. Allan Schubert, Manager Public Health Physfcfst Department of Health and Rehabflftatfve Services 1323 Wfnewood Blvd.

Tallahassee, Florfda 32301'egfonal Admfnfstrator, Region II U.S. Nuclear Regulatory Commission Executive Director for Operations 101 Marietta Street N.W., Suite 2900 Atlanta, Georgia 30323

t

$4 I

TABLE OF CONTENTS

~Sub 'ect

~Pa e

Introduc 0

uctfon ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

1 Evaluat on fo0

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

2 A

General e

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ e

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

2 B.

Pump Testing Program and Relief Requests......,......

C.

Valve Testing Program and Relief Requests.........-.;;".

1.

General Considerations...........................

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

2

~ ~ ~ ~ ~. ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

4

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

2.

Prog ogram\\ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ e ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~

3.

Geneneral......................................................

~ ~ ~

7

~ ~ ~

7 a.

Licensee's Code Interpretations..............

b.

Staff Posftfons on Licensee's Interpretations c.

Generic Relief.Requests......................

4.

Specific Requests for Relief.....................

~ ~ ~ ~ ~ e ~ ~ ~ ~ ~ ~ ~ ~ ~

7

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ e ~ ~

8 8

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ '0 d.

Component Cooling Water.................

e.

Waste Management...........;....'........

f Main Steam........,.....................

g.

Feedwater and Condensate...........'.....

h.

Containment Spray.......................

Circulating and Intake Cooling Water....

j.

Hydrogen Sampling.......................

k..Service and Instrument Afr..............

1.

Heating, Ventflatfon, and Air Conditioni m.

Firewater,

Domestfc, and Makeup Systems.

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ e ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ e ~ '

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

ng (HVAC)...........

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

a R

t C

eac or oolant..........................................,..

b.

Chemical and Volume Control System..........................

c.

Safety Injection...........................,..............,.

10 13 21 32 34 35 37 38 42 43 44 45 46 Attachment.1.

Summary Tabulatfon of Staff's Safety Evaluations.

P810s Used fn Staff's Review

I h

I II 4

4