ML17306A887
| ML17306A887 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 06/30/1992 |
| From: | Chavet K ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | |
| Shared Package | |
| ML17306A885 | List: |
| References | |
| NUDOCS 9208170078 | |
| Download: ML17306A887 (8) | |
Text
ENCLOSURE 2 REVISED PAGES FOR THE UNIT 3 JUNE MONTHLYOPERATING REPORT 9208170078 9208i4 PDR ADOCK 05000528 R
'DR
~ 4 0 I,I
Jr 8. =W
~
~
~
REVISED NRC MONTHLY OPERATING REPORT DOCKET NO.
50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K A Chavet OPERATING STATUS l.
2.
3.
4.
5 ~
6.
7.
8.
9.
10
'nit Name:
Palo Verde Nuclear Generatin Station Unit 3 Reporting Period:
June 1992 Licensed Thermal Power (MWt):
3800 Nameplate Rating (Gross MWe):
1403 Design Electrical Rating (Net MWe):
~12 0 Maximum Dependable Capacity (Gross MWe): 1303 Maximum Dependable Capacity (Net MWe):
1221 If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)
Since Last Report, Give Reasons:
A Power Level to Which Restricted, If Any (Net MWe):
None Reasons For Restrictions, If Any:
'>?".<?888;.;<8 y.";yy<;?@x@882<
>8'<:>~>NZ<<.(<::,?:g:~88>?:>,:...,". Pg> <
12.
13 14 15.
16.
17 18 19.
20 21.
22.
23
,,!.Hours;:.<:.:in e> Re'actor"Re'serVe::88hut7do>%n'ours"-
kÃ."""7'-""
"-"'"'8'-""":.
~~"HQU'i@-'.",Genel7aC'o'r.':-.,Ma'.:".;.'::On>>.;':Line?@@4",".1,'--:::>,-.'a.:.;=,q+<,.:?y,:"'~8mlb@Rese'~egSbutdown;,.'!
Ho'ur7jgg@%8@e".PÃ?"';-
"-.'e'::l'Gpss
!Th8rmS'lgpnexgy;"'.;:.G6%18xat'ed,':;:g15lR)(F,','I~8?
.".Gr+s'8.::i'.83.;ec.:trical<'~Energy.Genera%'ed~~'(MWH)%<."-.
'-i'~ÃeC::..'Sk~ctxicakjEner~~'6'enema'ted'gHMH)::gi,'~i!::
I:;'>~Un%0'j'Ser8V!x:c88 Fa~ctQr."8.(4')>'k ~@":;"':?8>':>".~"':0"4 g@gQ 8~)j~~r8
- ':)Vn'iijAy'aiXabk:X':
'-'.";.>Uii)',0",:Cap9ac'i';tp.",'.'Fac't'or.'::;.;(US'Jnjj:,:::,.'M)G',:.Set):P,:.:':"'.,";;i:",,
<8<22';?7<:2j8jj%~M:2???":< 82?.'"?:<~v.".'<77>P>>?<.':? 8'('if'<'>'> " >."4'c8N8<~'>22"':@7.".<8':<:>>: 88'>>8i@
,';.:;UnXC,.,:::.C'ip'ace:7,':'.,Facto'r":":i'(Usins::,:.,DEB;:.:;Net')',~j:,"::.j';."$ i:
?!>i!Uxlitti'Forced'.',>Outage i"R'ately ('):'l ';?</~pic'5"'.::.::4'i:::i":i:.
720 720.0 0.0 720.0 0.0 2,640,395 922,700 870,088 100.0%
100.0%
99.0$
95.2s 0.0s 4,368 4,154.2 0.0 4,128 '
0.0 15,309,927 5,364,300 5,052,807 94.5a
- 94. 5s 94.7a 91.ls 5.5%
39,264 28,151.9 0.0 27,728.3 0.0 101,821,336 35,683,000 33,570,732 70.6%
70.6%
70.0a 67.3s 8.7%
24.
Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): Refuelin outa e
Se tember 19 1992 80 da s
25.
If Shutdown At End of Report Period, Estimated Date of Start-up:
Forecast INITIALCRITICALITY 07787 INITIALELECTRICITY
~07 8
COMMERCIAL OPERATION
~09 8
N A Achieved
~10 25 87
~11 28 8
~01 08 88 11
0 pg, I
I
e
~
h REVISED
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.
50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K.A. Chavet June 1992 06/01 06/03 06/06 06/30 0000 0306 1708 2400 Unit began the month in Mode 1; 1008 RX power.
RX power cutback to 60$ after the 'B'eedwater turbine tripped on overspeed.
RX power at 100%.
Ended the month in Mode 1; 1008 RX power.
14-
p sl I
'k
REVISED SHUTDOWNS AND POWER REDUCTIONS June 1992 DOCKET NO 50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K.A. Chavet No.
Outage Method of Duration Shutting System Date Type Hours Reason Down Reactor LER No.
Code Component Code~
Cause and Corrective Action to Prevent Recurrence 92-05 06/03/92 F
N/A N/A N/A N/A RX power cutback to 60 after the
'B'eedwater turbine tripped on overspeed.
~F-Forced S-Scheduled 2Reason:
A-Equipment Failure(Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 6 License Examination F-Administrative G-Operational Error H-Other (Explain) 3Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 208 or Greater in the Past 24 Hours 9-Other-(Explain) 15 4Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)
~Exhibit H-Same Source
~ >S v +
g
~
(
5