Forwards Insp Repts 50-528/92-17,50-529/92-17 & 50-530/92-17 on 920412-0530 & Notice of Violation.Requests Description of Actions Being Taken to Resolve Issue Re Feedwater Isolation Valve Failures
ML17306A830
Person / Time
Site: Palo Verde  
Issue date: 06/29/1992
From: Richards S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17306A831 List:
References
NUDOCS 9207210002
Download: ML17306A830 (5)


See also: IR 05000528/1992017

Text

~gg RE0y

~ (4

tp

+~

4y

nO

IIA

O~

w+

0

+a*++

UNITED STATES

NUCLEAR REGULATORYCOMMISSION

REGION V

1450 MARIALANE

WALNUTCREEK, CAUFORNIA94596-5368

Docket Nos. 50-528,

50-529,

and 50-530

License Nos.

NPF-41,

NPF-51

and NPF-74

Arizona Public Service

Company

P.O.

Box 53999, Station

9012

Phoenix, Arizona

85072-3999

Attention:

Hr.

W. F.

Conway

Executive Vice President,

Nuclear

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

NRC INSPECTION REPORT

NO. 50-528/529/530/92-17

This refers to the inspection

conducted

by D. Coe,

D. Kirsch, F. Ringwald, J.

Sloan,

and L. Tran of this office, on April 12 through.Hay 30,

1992.

The

inspection

included

a review of activities authorized for your Palo Verde

facility.

At the conclusion of the inspection,

the findings were discussed

with those

members of your staff identified in the enclosed report.

Areas examined during the inspection

are identified in the report.

Within

these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observation of

activities in progress.

Based

on the results of this inspection,

certain of your activities appeared

to be in violation of NRC requirements.

The violation is based

on your

mechanical

thread

engagement

program requirements

not being met for several

safety

system valves.

Although your subsequent

analysis

has

so far shown

adequate

strength

in these

cases,

our concern is over the apparent

widespread

nature of these deviations

from program requirements.

Also discussed

during

the inspection

were your activities related to the misinstallation of a check

valve in the high pressure

injection system in August 1989.

This issue will

be the subject of a special

inspection report (50-528/92-23).

In our review of feedwater isolation valve'failures,

we noted that there

have

been several

0-ring failures asociated

with the solenoid valves in the

hydraulic control system since

1991.

The most recent 0-ring failure occurred

on June 9,

1992.

While a design

change

has

been proposed, it appears

that

further actions

are necessary

to evaluate

the latest failure and the impact of

potential

leakage

on the safety function of the feedwater isolation valves.

Please

provide

a description of the actions

being taken to resolve this issue.

In accordance

with 10 CFR Part 2.790 of the NRC's "Rules 'of Practice,"

a copy

of this letter

and the enclosures will be placed in the

NRC Public Document

Room.

9207210002

920629

PDR

ADOCK 05000528

8

PDR

0

-2-

The responses

directed

by this letter and the enclosed

Notice are not subject.

to the clearance

procedures

of the Office of Management

and Budget

as required

by the Paperwork Reduction Act of 1980,

Pub.

L. No.96-511.

Should you have any, questions

concerning this inspection,

we will be glad to

discuss

them with you.

Sincerely,

Enclosures:

S. A. Richards,

Chief

Reactor Projects

Branch

1.

Notice of Violation

2.

Inspection

Report

Numbers 50-528/92-17,

50-529/92-17,

and 50-530/92-17

cc w/enclosures:

Mr. 0. Mark DeHichele,

APS

Mr. James

H. Levine,

APS

Mr. R. Stevens,

APS

Mr. S. Guthrie,

APS

Mr. E.

C. Simpson,

APS

Hr. Robert

W. Page,

APS

Hr. Thomas

R. Bradish,

APS

Mr. Curtis L. Hoskins,

El

Paso Electric Company

Hr. Roy P. Lessey, Jr.,

Esq., Arkin, Gump, Strauss,

Hauer

and Feld

Mr. James

A. Boeletto,

Esq., Assistant Council, Southern California Edison

Company

Hr. Charles

B. Brinkman, Combustion Engineering,

Inc.

Mr. Steve Olea, Chief Engineer,

Arizona Corporation

Commission

Hr. Bradley

W. Jones,

Esq., Akin, Gump, Strauss,

Hauer

and Feld

Ms. Nancy C. Loftin, Esq.,

Corporate Secretary

5 Corporate

Counsel,

APS

Mr. Jack

R.

Newman,

Esq.,

Newman

5 Holtzinger,

P.C.

Hr. William A. Wright, Interim Acting Director, Arizona Radiation

Regulatory Agency

(ARRA)

Chairman,

Haricopa County Board of Supervisors

0

bcc w/enclosures:

Docket file

G.

Cook

B. Faulkenberry

J. Martin

Resident

Inspector

(4)

Project Inspector

bcc w/o enclosure

2:

LFMB

M. Smith

DCoe

4/ZQ/92

FRingwald

JSloan

LTran

6'~3/92

4 /~a/92

a /~d/92

YES

YES

0

Q

S

C

S

YES

0

YES

N

MgV c

~gpss

DKirsc&M~

H ong

< /">I92

4 /m/92

]

S

NO

ES

NO

RHuey

( /~q/9

CO

ES

NO

SRichar

s

4/A/92

]

ES

NO

[S

TO, PDR]

ES