ACCELERATED DIST1GBUTION DEMONSTIWTION SYSTEM REGULRTOlINFOZLMRTION DISTRIBUTION +TEM (RIDE)
A64'.ESSION NBR:9206180046 DOC.DATE: 92/05/31 NOTARIZED:
NO DOCKET
>>PACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528
'-~STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529
'STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION CHAVET,K.A.
Arizona Public Service Co. (formerly Arizona Nuclear Power LEVINEiJ M.
Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating repts for MAY 1992 for PVNGS Units 1,2 6
3.W/920613 ltr.
DISTRIBUTION CODE:
ZE24D COPIES RECEIVED:LTR Q ENCL Q SIZE:
I 7 TITLE: Monthly Operating Report (per Tech Specs)
NOTES:STANDARDIZED PLANT Standardized plant.
Standardized plant.
D 05000528 05000529 A
05000530 D
RECIPIENT ID CODE/NAME PDS LA TRAMMELL,C INTERNAL: ACRS AEOD/DSP/TPAB NRR/DOEA/OEAB RGN5 EXTERNAL: EGSG BRYCE,J.H NSIC COPIES LTTR ENCL 3
3 1
1 10 10 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD5 PD THOMPSONFM AEOD/DOA NRR/DLPQ/LPEB10 Ol NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 D
D NOTE TO ALL"RIDS" RECIPIENTS'LEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDl D
D TOTAL NUMBER OF COPIES REQUIRED:
LTTR 25 ENCL 25
Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O. BOX 52034
~
PHOENIX, ARIZONA85072-2034 JAMES M. LEVINE VICE PRESIDENT NUCLEAR PRODUCTION 254-02 075-JML/KAC June 13, 1992 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Monthly Operating Reports for May 1992 File: 92-024-404 92-056-026 Enclosed are the Monthly Operating Reports for May 1992, prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.
By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region V.
If you have any questions, please contact Kent A. Chavet at (602) 340-4718.
Sincerely, JML/KAC/kac Enclosures 920531 ITIQObl8004b PDR ADOCK 05000528 R
PDR cc:
J. B. Martin D. H. Coe A. C. Gehr g 70 gA.gH~ Gutterman lHPG Records Center Utility Data Institute (all w/enclosures)
1 f
C C
f I
U. S: Nuclear Regulatory Commission ATTN: Document Control Desk Monthly Operating Report Page Two bcc:
R. J. Adney D. B. Andrews R. J. Bouquot T. R. Bradish T.
Garison P. J. Caudill W. F. Conway B. J. Davis B. S. Ecklund C. R. Emmett R. K. Flood M. A. Friedlander L. A. Garrett R. E. Gouge J. W. Hazelbaker D. A Hettick W. E. Ide R. M. Littell C. D. Mauldin P. S. Barnes D. L. Metz M. R. Oren G. R. Overbeck R. W. Page K. F. Porter J. E. Rhodes F. W. Riedel J. J. Scott R. J. Stevens S.
Thomas P. J. Wiley Source Document Library (7394) (all w/enclosures)
(6200)
(7996)
(7636)
(8oeo)
(7818)
(9082)
(1686)
(15eo)
(1932)
(7294)
(7565)
(1932)
(7610)
(1605)
(7965)
(7194)
(7848)
(7610)
(7545)
(9116)
(7598)
(7546)
(1938)
(7592)
(6985)
(7198)
(7394)
(7603)
(7566)
(7298)
(6715)
t
I
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K.A. Chavet MONTH:
May 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 18 20 21 22 23 24 124 25 235 10 26 467 27 500 28 813 13 29 822 14 30 795 15 31 837 16
REFUELING INFORMATION DOCKET NO.
50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K A. Chavet
, Scheduled date for next refueling shutdown.
09/15/93, 4th refueling Scheduled date for restart following refueling.
11/24/93 Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendments The need for a Technical Specification change or other license amendment has not yet been determined.
Scheduled date for submitting proposed licensing action and supporting information.
N/A Important Licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
N/A The number of fuel assemblies.
a)
In the core.
241 b)
In the spent fuel storage pool.
267 Licensed spent fuel storage capacity.
1329 Intended change in spent fuel storage capacity.
None Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2004 (18 Month reloads and full core discharge capability).
3
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.
50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K A Chavet M~a1992 05/01 05/13 0000 2337 Unit began the month in Mode 5.
Entered Mode 4.
05/14 05/21 05/23 05/23 05/23 05/23 05/31 0927 0034 0030 1243 1718 2018 2400 Entered Mode 3.
Entered Mode 2.
Entered Mode l.
Generator synchronized to the grid for turbine testing.
Removed turbine/generator from the grid.
Generator resynchronized to the grid.
End of refueling outage.
Unit ended the month in Mode 1, ascending to 100% from 82% reactor power.
4
SHUTDOWNS AND POWER REDUCTIONS May 1992 DOCKET NO 50-528 UNIT NAME PVNGS-I DATE COMPLETED BY K.A. Chavet No.
Outage Method of Duration Shutting System Date Type Hours Reason Down Reactor LER No.
Code Cause and Corrective Component Action to Code~
Prevent Recurrence 92-02 02/15/92 S
543.7 N/A N/A N/A Continuation of the third refueling outage.
Outage ended on May 23rd.
~F-Forced S-Scheduled
~Reason:
~Method:
A-Equipment Failure(Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from E-Operator Training & License Previous Month Examination 5-Reduction of 20% or F-Administrative Greater in the Past G-Operational Error 24 Hours H-Other (Explain) 9-Other-(Explain) 4Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)
~Exhibit H-Same Source 5
H l
NRC MONTHLY OPERATING REPORT DOCKET NO.
50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K.A. Chavet OPERATING STATUS 1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Unit Name:
Palo Verde Nuclear Generatin Station Unit Reporting Period:
M~a1992 Licensed Thermal Power (MWt):
3800 Nameplate Rating (Gross MWe):
1403 Design Electrical Rating (Net MWe):
~12 0
Maximum Dependable Capacity (Gross MWe): 1303 Maximum Dependable Capacity (Net MWe):
1221 If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)
Since Last Report, Give Reasons:
N A Power Level to Which Restricted, If Any (Net MWe):
None Reasons For Restrictions, If Any:
N A
',:::i;,'$'.;::;.:;:,::;',.UNPXT;;,::;;2,:d,,'GEeNee ERATINGe,:i'RSTATXSTXOSe,qi.;(2t)((I.:j(ill :,II)this~".:>Mon.th6.:~j,":I ".'.',::".YT',,:,:",">>",',to...,Bat'6,:::;:;:::,.:;,:!)Gum'u1i trav'e:;i:',:;:'..:;
12:,".,.:;:::;;:::Ho'U'r'8:..;'!R'8'ante,oc,;;:isa's,',.,:;::,'ke'act'o'r',::,,::Re's'erv'e',::;8hui'lo'wii",::,:;:Hoiixi'~);.'::,',::-
14
~
'::;'iHdueJ8,::::::.,Cene ra tC X':.;Weda8, ':: Gn;...:.:L'lne:;:;::;::$6:',,',-:;)!":;:.';"",.':.:.!!2..";
15
~
'::,::N~il'i!8:::R'e8'e'tv','":81iv.
17.;i-'".;.!':.",G'i'oSs'::';:.:Bl'ec'tr'ideal::.'.::;::E'n'~'r'gy',.:
".'Ce'nei'8.
';.,':,:::';,'ge'.t,",:.:P,ke'ctrkcal.$ Eenergoj.;:.,Cene':t'e'O~j,(MME;):,.',I'.~j.',:I6 19.:>):::-XJxii'::;:!See%i'i'e"::Pa'etc"i'.
(')':.:~".-.'j4'%'t."."Me':-"-"~"""""~":<
20.;,;::;.:;,:::Vni~,t";,".;."A+i"i'Z:ab.",i':ll'i~$
j'.':.:;::Pa'c,t,':o 21 I.'-:;::;:U'ii'i'tI;:.';:Cap'a city,".,:Pac';t'o'i':,:;",:,':('Vi'in'j'::;':l$0'::.'::Ae';t);.:':."'"
22.
gi':Qnf.:t,;'+apac'j;tp:e'.:Pac+ox:'-(Qsing: (Mg '1'ge j')::Popl "8)
- "
- .::':::;$n'iC'::"'Poi.'c'e'8".:o'60ut~aj'i':.::: Ra'te',2.',(8':}.'::i.::,'ji::,':i":-"':v!'.',':;::<:"'!'F3@g'j 744 744.0 0.0 744.0 0.0 2,824,993 979,100 922,494 100.0%
100.0%
101.5%
97.6Z 0.0a 3,648 3,381.3 0.0 3,255 5
0.0 11,897,670 4,118,700 3,856,740 89 '%
89.2a 86.6s 83.2s 5.8a 49,968 34,727.1 0
33,969.8 0
124,843,888 43,524,770 40,746,955 68.0%
68.0%
66.8@
- 64. 2s 7.2%
25.
If Shutdown At End of Report Period, Estimated Date of Start-up:
N A INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Forecast
~03 86
~06 86
~11 86 Achieved 04/418 86 05/320 86
~09 19 86 6
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K.A. Chavet MONTH:
May 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1242 17 1245 1244 18 1243 1247 19 1238 1245 20 1238 1244 1244 1245 22 1246 1248 23 124 1244 24 124 1242 1244 10 1243 26 1244 1242 27 1243 12 1242 28 1242 1244 29 1243 14 1242 30 1231 1245 1246 16 1244 7
REFUELING INFORMATION DOCKET NO.
50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K A Chavet Scheduled date for next refueling shutdown.
03/15/93, 4th refueling Scheduled date for restart following refueling.
05/24/93 Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment't Yes.
A change to the moderator temperature coefficient curve in the Technical Specification is anticipated as a result of the next refueling.
Scheduled date for submitting proposed licensing action and supporting information.
12/21/92 Important Licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
Minor modifications to the fuel pellet design (dimensional and,,density changes) will be incorporated into the Unit 2, Cycle 5 reload.
The number of fuel assemblies.
a)
In the core.
241 b)
In the spent fuel storage pool.
288 Licensed spent fuel storage capacity.
1329 Intended change in spent fuel storage capacity.
None Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2004 (18 Month reloads and full core discharge capability).
8
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.
50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K A Chavet
~Ma 1992 05/01 05/31 0000 2400 Unit began the month in Mode 1; 100%
RX power.
Ended the month in Mode 1; 100%
RX power.
9
SHUTDOWNS AND POWER REDUCTIONS May 1992 DOCKET NO 50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K.A. Chavet No.
Outage Method of Duration Shutting System Date Type Hours Reason Down Reactor LER No.
Code Cause and Corrective Component Action to Code~
Prevent Recurrence No reactor shutdowns or significant power reductions occurred during the month.
~F-Forced S-Scheduled
~Reason:
A-Equipment Failure(Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 6 License Examination F-Administrative G-Operational Error H-Other (Explain)
~Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20% or Greater in the Past 24 Hours 9-Other-(Explain) 4Exhibit F-Ins tructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)
~Exhibit H-Same Source 10
W ~
t t
NRC MONTHLY OPERATING REPORT DOCKET NO.
50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K A Chavet OPERATING STATUS 1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Unit Name:
Palo Verde Nuclear Generatin Station Unit 3 Reporting Period;
~Me 1992 Licensed Thermal Power (MWt):
- 3800, Nameplate Rating (Gross MWe):
1403 Design Electrical Rating (Net MWe):
1270 Maximum Dependable Capacity (Gross MWe):
1303 Maximum Dependable Capacity (Net MWe):
1221 If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)
Since Last Report, Give Reasons:
N A Power Level to Which Restricted, If Any (Net MWe):
None Reasons For Restrictions, If Any:
N A 12 13 14 15 16 17 18 19 20 21 22 23
$j:.'~;:,UNIT'<:32';:OENERATtING'.'<STATIST'IC'S",.!:..s".:::>....~+'s
- "
- !.;,Bouc-'rS:;:,:;:ixi::.':9R'ij'O'r'tax'ia(Pe'iiOd
>g~,';:;:,'.;:gI'."'-.':.;::.,';.:,:.:;::;::,,:::;:..:)!:":,"::::::t.'!j'>HOURS;:2ReaotOX",:o:,'WaS:::gCr:i'tiC'a%<kki'5iggd%<.".ir'5:,"';",o',:oio(poSiioS!.8X!R8'aCtOr.:::.!R68el>VO$
',,8butdOWn',::: 80u~rS"lsd',":;',!:,'.<gjt<..",+xgg~igI>';:
,.";'o'urjgj'Ce'n'eri;t'o'.r',,'".:;:was,:,.0;n:,>>:.',:LI'ice,::,';:,
"",:j'gn'l'53$R'6'86.Lp'e.','::;:,:'9hO;t'down" 'jHovx8'~i":; is,':~44>t,;(ki;o,,'c', <,.'"4',gN!
- ,:>:6r'os@'i::;:::Xbprmalj~Bnel'gj,; Ciigie'r'at'edII'(fNH);:.::;:::;"::,:;:,';:;:".,:j,':
- ",
- ;:::,0:X'Oi'S:,',>Blgeo'tr'ioal.:::,:.'::::E'n'er'jIo:,C'e
':::,':.:',:Ne,'.t",:',:Sl'.i:cC'r'ic,i:1;:,::,':
- i;jUii'it,'
- :,.:";::Segv'ice.",:,:Pa'c'tgo'r'"::i(f):i~"::":::,~;,.::;,:,,'.:,:,:;,;~",,;
.:':::.:'.gnj,'t.::,.-,Ca'Pa'cist jl:;;:,':Pjcteeogi,(Usingy9ER:;:~Net)-".@oh2;.,,.-;
- -"9'iO
- Peog'i"ie'dt,";':04'ta'j'e'.::skate:9s(C)
~':::.-::. ":!P,.':kt:"'.:4:;::.'":N%5
,,':This,'Mohtli':::,'::::;;
744 562.4 0.0 546.5 0.0 1,853,795 644,500 594,706 73.5a 73.5%
65.5s 62.9S 26.5s 3,648 3,434.2 0.0 3,408.9 0.0 12,669,532 4,441,600 4,182,719 93.4s 93.4s 93.9%
90.3S 6.6a
.'$::9::,jCQmiilativ'8",,""-;'.,":;:
38,544 27,431.9 0.0 27,008.3 0.0 99,180,941 34,760,300 32,700,644 70.1%
70.la 69.5s 66.8a 8.9s 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): Refuelin outa e
Se tember 19 1992 80 da s.
25.
If Shutdown At End of Report Period, Estimated Date of Start-up:
N A INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Forecast
~07 87 07 87
~09 8
Achieved 10/D25 87 11 28 87 01 08 88 11
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K A Chalet MONTH:
May 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1259 17 863 1254 18 891 1258 19 1072 997 20 1250 855 21 1255 859 22 1259 43 23 1258 24 1258 25 1256 10 26 1254 27 1254
.12 13 28 29 1254 1254 14 30 1254 15 66 31 1256 16 680
. ~
REFUELING INFORMATION DOCKET NO.
50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K.A. Chavet Scheduled date for next refueling shutdown.
09/19/92, 3rd refueling Scheduled date for restart following refueling.
11/28/92 Will refueling or resumption of operation thereafter require a Technical Specification.
change or other license amendment?
There are no Technical Specification changes associated with this reload.
Scheduled date for submitting proposed licensing action and supporting information.
N/A Important Licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
N/A The number of fuel assemblies.
a)
In the core.
241 b)
In the spent fuel storage pool.
192 1329 Licensed spent fuel storage capacity.
Intended change in spent fuel storage capacity.
None Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2005 (18 Month reloads and full core discharge capability).
13
~
~
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.
50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K A. Chavet
~Ma 1992 05/01 0000 Unit began the month in Mode 1; 100%
RX power.
05/04 0436 A
24 VDC alarm lead came in momentary contact with a
480 VAC electrical bus during the performance of an electrical work order to check alarm system continuity.
The momentary contact resulted in the partial loss of the non-safety related annunciator system.
05/04 0749 Commenced RX downpower to 70%
after the Core Operating Limit Supervisory System (COLSS) stopped calculating.
05/04 0819 The determination was made that the Plant Computer System had subsequently degraded to a point that the Emergency Plan was entered and an ALERT declared.
05/04 1021 RX at 70% power.
05/06 2321 The ALERT was terminated and the station exited the Emergency Plan as a
result of the rework that had been completed on the Plant Annunciator System and the Plant Computer System.
The determination was made by senior plant management to shut down the plant to perform additional testing needed to ensure long term reliability of these two systems.
05/06 2340 Commenced RX downpower at 10% per hour 05/07 05/14 05/15 05/15 05/19 05/31 0419 1757 0152 0952 1530 2400 Entered Mode 3 when RX was manually tripped from 20% power.
1 Entered Mode 2.
Entered Mode 1.
Generator synchronized to the grid.
RX power at 100%.
Unit ended the month in Mode 1; 100%
RX power.
14
SHUTDOWNS AND POWER REDUCTIONS May 1992 DOCKET NO 50-530 UNIT NAME PVNGS-3 DATE 06 09 92 COMPLETED BY K.A. Chavet No.
Outage Method of Duration Shutting System Date Type Hours Reason Down Reactor LER No. Code'ause and Corrective Component Action to Code~
Prevent Recurrence 92-03 05/04/92 F
N/A N/A N/A N/A RX power decreased to 70%.
Electrical short-circuit during continuity check of alarm system caused partial loss of the non-safety related annunciator system.
92-04 05/07/92 F
197.5 N/A N/A N/A Senior plant management elected to shut down the reactor to perform additional testing needed to
ensure long term reliability of the affected annunciator system computer system.
~F-Forced S-Scheduled
~Reason:
A-Equipment Failure(Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error H-Other (Explain)
~Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 208 or Greater in the Past 24 Hours 9-Other-(Explain) 4Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)
~Exhibit H-Same Source 15-
JlI I/J