ML17306A783

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for May 1992 for PVNGS Units 1,2 & 3.W/920613 Ltr
ML17306A783
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 05/31/1992
From: Chavet K, James M. Levine
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
254-02075-JML-K, 254-2075-JML-K, NUDOCS 9206180046
Download: ML17306A783 (34)


Text

ACCELERATED DIST1GBUTION DEMONSTIWTION SYSTEM REGULRTOlINFOZLMRTION DISTRIBUTION +TEM (RIDE)

A64'.ESSION NBR:9206180046 DOC.DATE: 92/05/31 NOTARIZED: NO DOCKET

>>PACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528

'-~STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529

'STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION CHAVET,K.A. Arizona Public Service Co. (formerly Arizona Nuclear Power LEVINEiJ M. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for MAY 1992 for PVNGS Units 1,2 6 3.W/920613 ltr. D DISTRIBUTION CODE: ZE24D COPIES RECEIVED:LTR Q ENCL Q SIZE: I 7 TITLE: Monthly Operating Report (per Tech Specs)

NOTES:STANDARDIZED PLANT 05000528 Standardized plant. 05000529 A Standardized plant. 05000530 D

RECIPIENT COPIES RECIPIENT COPIES D ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PDS LA 3 3 PD5 PD 1 1 TRAMMELL,C 1 1 THOMPSONFM 1 1 INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 NRR/DLPQ/LPEB10 1 1 NRR/DOEA/OEAB 1 1 Ol 1 1 RGN5 1 1 EXTERNAL: EGSG BRYCE,J.H 1 1 NRC PDR 1 1 NSIC 1 1 D

D D

NOTE TO ALL "RIDS" RECIPIENTS'LEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR 25 ENCL 25

Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O. BOX 52034 ~ PHOENIX, ARIZONA85072-2034 JAMES M. LEVINE VICE PRESIDENT NUCLEAR PRODUCTION 254-02 075- JML/KAC June 13, 1992 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Monthly Operating Reports for May 1992 File: 92-024-404 92-056-026 Enclosed are the Monthly Operating Reports for May 1992, prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses. By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region V.

If you have any questions, please contact Kent A. Chavet at (602) 340-4718.

Sincerely, ITIQObl8004b 920531 JML/KAC/kac PDR ADOCK 05000528 R PDR Enclosures cc: J. B. Martin (all w/enclosures)

D. H. Coe A. C. Gehr gA.gH~ Gutterman g 70 lHPG Records Center Utility Data Institute

1 f

C C

f I

U. S: Nuclear Regulatory Commission ATTN: Document Control Desk Monthly Operating Report Page Two bcc: R. J. Adney (7394) (all w/enclosures)

D. B. Andrews (6200)

R. J. Bouquot (7996)

T. R. Bradish (7636)

T. Garison (8oeo)

P. J. Caudill (7818)

W. F. Conway (9082)

B. J. Davis (1686)

B. S. Ecklund (15eo)

C. R. Emmett (1932)

R. K. Flood (7294)

M. A. Friedlander (7565)

L. A. Garrett (1932)

R. E. Gouge (7610)

J. W. Hazelbaker (1605)

D. A Hettick (7965)

W. E. Ide (7194)

R. M. Littell (7848)

C. D. Mauldin (7610)

P. S. Barnes (7545)

D. L. Metz (9116)

M. R. Oren (7598)

G. R. Overbeck (7546)

R. W. Page (1938)

K. F. Porter (7592)

J. E. Rhodes (6985)

F. W. Riedel (7198)

J. J. Scott (7394)

R. J. Stevens (7603)

S. Thomas (7566)

P. J. Wiley (7298)

Source Document Library (6715)

t

I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K.A. Chavet MONTH: May 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 18 20 21 22 23 24 124 25 235 10 26 467 27 500 28 813 13 29 822 14 30 795 15 31 837 16

REFUELING INFORMATION DOCKET NO. 50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K A. Chavet

, Scheduled date for next refueling shutdown.

09/15/93, 4th refueling Scheduled date for restart following refueling.

11/24/93 Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendments The need for a Technical Specification change or other license amendment has not yet been determined.

Scheduled date for submitting proposed licensing action and supporting information.

N/A Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.

N/A The number of fuel assemblies.

a) In the core. 241 b) In the spent fuel storage pool. 267 Licensed spent fuel storage capacity. 1329 Intended change in spent fuel storage capacity. None Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2004 (18 Month reloads and full core discharge capability).

3

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K A Chavet M~a1992 05/01 0000 Unit began the month in Mode 5.

05/13 2337 Entered Mode 4.

05/14 0927 Entered Mode 3.

05/21 0034 Entered Mode 2.

05/23 0030 Entered Mode l.

05/23 1243 Generator synchronized to the grid for turbine testing.

05/23 1718 Removed turbine/generator from the grid.

05/23 2018 Generator resynchronized to the grid. End of refueling outage.

05/31 2400 Unit ended the month in Mode 1, ascending to 100% from 82% reactor power.

4

SHUTDOWNS AND POWER REDUCTIONS May 1992 DOCKET NO 50-528 UNIT NAME PVNGS-I DATE COMPLETED BY K.A. Chavet Outage Method of Cause and Corrective Duration Shutting System Component Action to No. Date Type Hours Reason Down Reactor LER No. Code Code~ Prevent Recurrence 92-02 02/15/92 S 543.7 N/A N/A N/A Continuation of the third refueling outage. Outage ended on May 23rd.

~F-Forced ~Reason: ~Method: 4Exhibit F- Instructions S-Scheduled A-Equipment Failure(Explain) 1-Manual for Preparation of the Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation from (NUREG 0161)

E-Operator Training & License Previous Month Examination 5-Reduction of 20% or F-Administrative Greater in the Past ~Exhibit H-Same Source G-Operational Error 24 Hours H-Other (Explain) 9-Other-(Explain) 5

H l

NRC MONTHLY OPERATING REPORT DOCKET NO. 50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K.A. Chavet OPERATING STATUS

1. Unit Name: Palo Verde Nuclear Generatin Station Unit
2. Reporting Period: M~a1992
3. Licensed Thermal Power (MWt): 3800
4. Nameplate Rating (Gross MWe): 1403
5. Design Electrical Rating (Net MWe): ~12 0
6. Maximum Dependable Capacity (Gross MWe): 1303
7. Maximum Dependable Capacity (Net MWe): 1221
8. If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)

Since Last Report, Give Reasons: N A

9. Power Level to Which Restricted, If Any (Net MWe): None
10. Reasons For Restrictions, If Any: N A trav'e:;i:',:;:'..:;

',:::i;,'$'.;::;.:;:,::;',.UNPXT;;,::;;2,:d,,'GEeNee ERATINGe,:i'RSTATXSTXOSe,qi.;(2t)((I.:j(ill :,II)this~".:>Mon.th6.:~j,":I ".'.',::".YT',,:,:",">>",',to...,Bat'6,:::;:;:::,.:;,:!)Gum'u1i 744 3,648 49,968 744.0 3,381.3 34,727.1 12:,".,.:;:::;;:::Ho'U'r'8:..;'!R'8'ante,oc,;;:isa's,',.,:;::,'ke'act'o'r',::,,::Re's'erv'e',::;8hui'lo'wii",::,:;:Hoiixi'~);.'::,',::-

0.0 0.0 0 14 ~ '::;'i HdueJ8,::::::.,Cene ra tC X':.; Weda8, ':: Gn;...:.:L'lne:;:;::;::$6:',,',-:;)!":;:.';"",.':.:.!!2.."; 744.0 3,255 5 33,969.8 15 ~ '::,::N~il'i!8:::R'e8'e'tv','":81iv. 0.0 0.0 0 2,824,993 11,897,670 124,843,888 17.;i-'".;.!':.",G'i'oSs'::';:.:Bl'ec'tr'ideal::.'.::;::E'n'~'r'gy',.: ".'Ce'nei'8.

979,100 4,118,700 43,524,770

';.,':,:::';,'ge'.t,",:.:P,ke'ctrkcal.$ Eenergoj.;:.,Cene':t'e'O~j,(MME;):,.',I'.~j.',:I6 922,494 3,856,740 40,746,955 19.:>):::-XJxii'::;:!See%i'i'e"::Pa'etc"i'. (')':.:~".-.'j4'%'t."."Me':-"-"~"""""~":< 100.0% 89 '% 68.0%

20.;,;::;.:;,:::Vni~,t";,".;."A+i"i'Z:ab.",i':ll'i~$ j'.':.:;::Pa'c,t,':o 100.0% 89.2a 68.0%

21 I.'-:;::;:U'ii'i'tI;:.';:Cap'a city,".,:Pac';t'o'i':,:;",:,':('Vi'in'j'::;':l$0'::.'::Ae';t);.:':."'" 101.5% 86.6s 66.8@

22. gi':Qnf.:t,;'+apac'j;tp:e'.:Pac+ox:'-(Qsing: (Mg '1'ge j')::Popl "8) 97.6Z 83.2s 64. 2s
"
.::':::;$ n'iC'::"'Poi.'c'e'8".:o'60ut~aj'i':.::: Ra'te',2.',(8':}.'::i.::,'ji::,':i":-"':v!'.',':;::<:"'!'F3@g'j 0.0a 5.8a 7.2%
25. If Shutdown At End of Report Period, Estimated Date of Start-up: N A Forecast Achieved INITIAL CRITICALITY ~03 86 04/418 86 INITIAL ELECTRICITY ~06 86 05/320 86 COMMERCIAL OPERATION ~11 86 ~09 19 86 6

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K.A. Chavet MONTH: May 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1242 17 1245 1244 18 1243 1247 19 1238 1245 20 1238 1244 1244 1245 22 1246 1248 23 124 1244 24 124 1242 1244 10 1243 26 1244 1242 27 1243 12 1242 28 1242 1244 29 1243 14 1242 30 1231 1245 1246 16 1244 7

REFUELING INFORMATION DOCKET NO. 50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K A Chavet Scheduled date for next refueling shutdown.

03/15/93, 4th refueling Scheduled date for restart following refueling.

05/24/93 Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment't Yes. A change to the moderator temperature coefficient curve in the Technical Specification is anticipated as a result of the next refueling.

Scheduled date for submitting proposed licensing action and supporting information.

12/21/92 Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.

Minor modifications to the fuel pellet design (dimensional and,,density changes) will be incorporated into the Unit 2, Cycle 5 reload.

The number of fuel assemblies.

a) In the core. 241 b) In the spent fuel storage pool. 288 Licensed spent fuel storage capacity. 1329 Intended change in spent fuel storage capacity. None Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2004 (18 Month reloads and full core discharge capability).

8

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K A Chavet

~Ma 1992 05/01 0000 Unit began the month in Mode 1; 100% RX power.

05/31 2400 Ended the month in Mode 1; 100% RX power.

9

SHUTDOWNS AND POWER REDUCTIONS May 1992 DOCKET NO 50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K.A. Chavet Outage Method of Cause and Corrective Duration Shutting System Component Action to No. Date Type Hours Reason Down Reactor LER No. Code Code~ Prevent Recurrence No reactor shutdowns or significant power reductions occurred during the month.

~F-Forced ~Reason: ~Method: 4Exhibit F- Ins tructions S-Scheduled A-Equipment Failure(Explain) 1-Manual for Preparation of the Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation from (NUREG 0161)

E-Operator Training 6 License Previous Month Examination 5-Reduction of 20% or F-Administrative Greater in the Past ~Exhibit H-Same Source G-Operational Error 24 Hours H-Other (Explain) 9-Other-(Explain) 10

W ~

t NRC MONTHLY OPERATING REPORT t DOCKET NO. 50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K A Chavet OPERATING STATUS

1. Unit Name: Palo Verde Nuclear Generatin Station Unit 3
2. Reporting Period; ~Me 1992
3. Licensed Thermal Power (MWt): 3800,
4. Nameplate Rating (Gross MWe): 1403
5. Design Electrical Rating (Net MWe): 1270
6. Maximum Dependable Capacity (Gross MWe): 1303
7. Maximum Dependable Capacity (Net MWe): 1221
8. If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)

Since Last Report, Give Reasons: N A

9. Power Level to Which Restricted, If Any (Net MWe): None
10. Reasons For Restrictions, If Any: N A j:.'~;:,UNIT'<:32';:OENERATtING'.'<STATIST'IC'S",.!:..s".:::>....~+'s ,,':This,'Mohtli':::,'::::;; .'$::9::,jCQmiilativ'8",,""-;'., ":;:
"
!.;,Bouc-'rS:;:,:;:ixi::.':9R'ij'O'r'tax'i a(Pe'iiOd 744 3,648 38,544 12 >g~,';:;:,'.;:gI'."'-.':.;::.,';.:,:.:;::;::,,:::;:..:)!:":,"::::::t.'!j'>HOURS;:2ReaotOX",:o:,'WaS:::gCr:i'tiC'a%<kki'5iggd%<.".ir'5:,"';",o',:oio(poSiioS!.8X!R8'aCtOr.:::.!R68el>VO$

562.4 3,434.2 27,431.9 13 ',,8butdOWn',::: 80u~rS"lsd',":;',!:,'.<gjt<..",+xgg~igI>';: 0.0 0.0 0.0 14 ,.";'o'urjgj'Ce'n'eri;t'o'.r',,'".:;:was,: ,.0;n:,>>:.',:LI'ice,::,';:, 546.5 3,408.9 27,008.3 15 "",:j'gn'l'53$R'6'86.Lp'e.','::;:,:'9hO;t'down" 'jHovx8'~i":; is,':~44>t,;(ki;o,,'c', <,.'"4',gN! 0.0 0.0 0.0 16  :,:>:6r'os@'i::;:::Xbprmalj~Bnel'gj,; Ciigie'r'at'edII'(fNH);:.::;:::;"::,:;:,';:;:".,:j,': 1,853,795 12,669,532 99,180,941 17  :;",:;:::,0:X'Oi'S:,',>Blgeo'tr'ioal.:::,:.'::::E'n'er'jIo:,C'e 644,500 4,441,600 34,760,300 18 ':::,':.:',:Ne,'.t",:',:Sl'.i:cC'r'ic,i:1;:,::,': 594,706 4,182,719 32,700,644 19  :;i;jUii'it,'::,.:";::Segv'ice.",:,:Pa'c'tgo'r'"::i(f):i~"::":::,~;,.::;,:,,'.:,:,:;,;~",,; 73.5a 93.4s 70.1%

20 73.5% 93.4s 70.la 21 65.5s 93.9% 69.5s 22 .:':::.:'.gnj,'t.::,.-,Ca'Pa'cist jl:;;:,':Pjcteeogi,(Usingy9ER:;:~Net)-".@oh2;.,,.-; 62.9S 90.3S 66.8a 23  ::;::-"9'iO:Peog'i"ie'dt,";':04'ta'j'e'.::skate:9s(C) ~':::.-::. ":!P,.':kt:"'.:4:;::.'":N%5 26.5s 6.6a 8.9s

24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): Refuelin outa e Se tember 19 1992 80 da s.
25. If Shutdown At End of Report Period, Estimated Date of Start-up: N A Forecast Achieved INITIAL CRITICALITY ~07 87 10/D25 87 INITIAL ELECTRICITY 07 87 11 28 87 COMMERCIAL OPERATION ~09 8 01 08 88 11

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K A Chalet MONTH: May 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1259 17 863 1254 18 891 1258 19 1072 997 20 1250 855 21 1255 859 22 1259 43 23 1258 24 1258 25 1256 10 26 1254 27 1254

.12 28 1254 13 29 1254 14 30 1254 15 66 31 1256 16 680

.~

REFUELING INFORMATION DOCKET NO. 50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K.A. Chavet Scheduled date for next refueling shutdown.

09/19/92, 3rd refueling Scheduled date for restart following refueling.

11/28/92 Will refueling or resumption of operation thereafter require a Technical Specification.

change or other license amendment?

There are no Technical Specification changes associated with this reload.

Scheduled date for submitting proposed licensing action and supporting information.

N/A Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.

N/A The number of fuel assemblies.

a) In the core. 241 b) In the spent fuel storage pool. 192 Licensed spent fuel storage capacity. 1329 Intended change in spent fuel storage capacity. None Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2005 (18 Month reloads and full core discharge capability).

13

~ ~

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K A. Chavet

~Ma 1992 05/01 0000 Unit began the month in Mode 1; 100% RX power.

05/04 0436 A 24 VDC alarm lead came in momentary contact with a 480 VAC electrical bus during the performance of an electrical work order to check alarm system continuity. The momentary contact resulted in the partial loss of the non-safety related annunciator system.

05/04 0749 Commenced RX downpower to 70% after the Core Operating Limit Supervisory System (COLSS) stopped calculating.

05/04 0819 The determination was made that the Plant Computer System had subsequently degraded to a point that the Emergency Plan was entered and an ALERT declared.

05/04 1021 RX at 70% power.

05/06 2321 The ALERT was terminated and the station exited the Emergency Plan as a result of the rework that had been completed on the Plant Annunciator System and the Plant Computer System. The determination was made by senior plant management to shut down the plant to perform additional testing needed to ensure long term reliability of these two systems.

05/06 2340 Commenced RX downpower at 10% per hour 05/07 0419 Entered Mode 3 when RX was manually tripped from 20% power.

1 05/14 1757 Entered Mode 2.

05/15 0152 Entered Mode 1.

05/15 0952 Generator synchronized to the grid.

05/19 1530 RX power at 100%.

05/31 2400 Unit ended the month in Mode 1; 100% RX power.

14

SHUTDOWNS AND POWER REDUCTIONS May 1992 DOCKET NO 50-530 UNIT NAME PVNGS-3 DATE 06 09 92 COMPLETED BY K.A. Chavet No. Date Type Outage Duration Hours Reason Method Shutting Down of Reactor LER No.

Code'ause System Component Code~

and Corrective Action to Prevent Recurrence 92-03 05/04/92 F N/A N/A N/A N/A RX power decreased to 70%.

Electrical short-circuit during continuity check of alarm system caused partial loss of the non-safety related annunciator system.

92-04 05/07/92 F 197.5 N/A N/A N/A Senior plant management elected to shut down the reactor to perform additional testing needed to ensure long term reliability of the affected annunciator system computer system.

~F- Forced ~Reason: ~Method: 4Exhibit F-Instructions S-Scheduled A-Equipment Failure(Explain) 1-Manual for Preparation of the Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation from (NUREG 0161)

E-Operator Training & License Previous Month Examination 5-Reduction of 208 or F-Administrative Greater in the Past ~Exhibit H-Same Source G-Operational Error 24 Hours H-Other (Explain) 9-Other-(Explain) 15-

Jl I

I/J