UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1460 MARIALANE, SUITE 210
WALNUTCREEK, CALIFORNIA94N6-6368
MAY 15
1992
Docket Nos.
50-528,
50-529,
and 50-530
License
Nos.
and NPF-74
Arizona Public Service
Company
P.O.
Box 53999, Station
9012
Phoenix,
85072-3999
Attention:
Hr.
W. F.
Conway
Executive Vice President,
Nuclear-
Gentlemen:
SUBJECT:
NRC
INSPECTION
REPORT
NO. 50-528/529/530/92-10
This refers to the inspection
conducted
by D. Coe,
'W. Ang, L. Coblentz,
D. Corporandy,
F, Ringwald, J. Sloan,
and L. Tran of this office, on March 1,
t.
iugh April li, 1992.
The inspection
included
a Ieview of activities
authorized for your Palo Verde facility.
At the conclusion of the inspection,
the findings were discussed
with those
members of your staff identified in the
enclosed report.
Areas
examined during the inspection
are identified in the report.
Within
these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observation of
activities in progress.
Based
on the results of this inspection,
certain of your activities appeared
to be in violation of NRC requirements,
as specified in the enclosed
Notice of
Violation (Notice).
The one violation involved a radiation area which was not
posted
as required in Unit 1.
Because
our further review indicated that this
was
an isolated condition,
and your corrective actions
were prompt
and
adequate,
a response
to this violation is not required.
Your attention is directed to paragraph
7 of the enclosed
report.
This
paragraph
discIIsses electrical distribution and balance-of-plant
equipment
failures which caused
a reactor trip in Unit 2 or subsequently
contributed to
significant water
hammers
in the feedwater
and condensate
systems.
In one of
the cases,
the equipment
problem had
been previously recognized
but not
sufficiently addressed
to preclude
the event.
Additional licensee
management
attention
appears
necessary
to improve equipment
performance
in these
areas
to
reduce challenges
to the plant protection
systems.
Paragraph
5 of the enclosed
report discusses
an event in Unit 2 when work was
performed
on the condensate
system which nearly resulted
in a plant transient.
This work is normally scheduled
to be performed with the unit shutdown,
but
was performed without adequate
precautions
to preclude
a pump trip during
9206020167
920515
ADOCK 05000528
8
I=g )
0
power operations.
This issue is of concern in light of other recent
events
where
weak work control
was evident.
In accordance
with 10 CFR Part 2.790 of the NRC's "Rules of Practice,"
a copy
of this letter and the enclosures will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this inspection,
we will be glad to
discuss
them with you.
Sincerely,
S. A. Richards,
Chief
Reactor Projects
Branch
Enclosures:
1.
2.
Inspection
Report Nos. 50-528/92-10,
50-529/92-10
and
5C- 530/92-10
cc w/enclosures:
Mr. 0. Hark DeHichele,
Mr. James
H. Levine,
Hr. R. Stevens,
Mr. S. Guthrie,
Hr. E.
C. Simpson,
Hr. Robert
W. Page,
Hr. Thomas
R. Bradish,
Hr. Jack
R.
Newman,
Esq.,
Newman
& Holtzinger P. C., Washington,
Mr. Curtis L. Hoskins,
El
Paso Electric Company,
Phoenix,
AZ
Hr. Roy P.
Lessey, Jr.,
Esq., Akin, Gump, Strauss,
Hauer
and Feld
Mr. James
A. Boeletto,
Esq., Assistant Council, Southern California Edison
Company,
Rosemead,
CA
Hr. Charles
B. Brinkman,
Combustion
Engineering,
Inc.
Mr. Steve Olea, Chief Engineer,
Arizona Corporation
Commission
Hr. Al Gutterman,
Newman
& Holtzinger P.C.
Hr. Bradley
W. Jones,
Esq., Akin, Gump, Strauss,
Hauer
and Feld
Hr. William A. Wright, Interim Acting Director, Arizona Radiation
Regulatory
Agency
(ARRA), Phoenix,
AZ
Chairman,
Haricopa County Board of Supervisors,
Phoenix,
AZ
Hs.
Nancy
C. Loftin, Esq.,
power operations.
This issue is of concern in light of other recent events
where weak work control
was evident.
In accordance
with 10 CFR Part 2.790 of the NRC's "Rules of Practice,"
a copy
of this letter and the enclosures will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this inspection,
we will be glad to
discuss
them with you.
Sincerely,
S. A. Richards,
Chief
Reactor Projects
Branch
Enclosures:
1.
2.
Inspection
Report
Numbers 50-528/92-10,
50-529/92-10,
and 50-530/92-10
bcc w/enclosures:
Docket file
Resident
Inspector
(4)
Project Inspector
Hr.
G.
Cook
Hr. B. Faulkenberry
Hr. J. Hartin
bcc w/o enclosures:
H. Smith
J. Zollicoffer
REGION V/Ann
g~ @~4 utdud
Co wc c 4 0.~~$
DCoe
/
/92
FRingwald
/
/92
JSloan
/
/92
LTran
/
/92
~EN
~YE
N
~YE
MM
~YE
I
LCoblentz
/
/92
DCorporandy
/
/92
WAng/
/92
RHuey
/
/92
YES
NO
]
C
~YE
N
~YES
~YEE
N
SLichyrds
HWong
KPerkins
RZimmerman
S(g</92
Q
j9EEYMIEYE
E
II
~EYEE
NN
~Y MME
~NE
Should you have
any questions
concerning this inspection,
we will be glad to
discuss
them with you.
Sincerely,
S. A. Richards,
Chief
Reactor Projects
Branch
Enclosures:
1.
2.
Inspection
Report
Numbers 50-528/92-10,
50-529/92-10,
and 50-530/92-10
bcc w/enclosures:
Docket file
Resident
Inspector
(4)
Project Inspector
Hr.
G.
Cook
Hr. B. Faulkenberry
Hr. J. Hartin
bcc w/o enclosures:
H. Smith
J. Zollicoffer
REGION V/Ann
DCoe+~*r
g/r3/92
FRingwald
+~+92
JSloan
~/Q/92
LTran
y-/is/92
5T/ 5/r/e
86 C~/zq
NO
YES
0
YES
0
YES
~Sf
LCob1 ntz
DCorporan
g WAnP +
~/I'
2
~////92
r/gf/92
RHuey
Q/Q/92
)
NO
NO
NO
YES
NO
SRichards
/
/92
HWong+
S/i +92
immerma
9
YES
NO
S
NO
YES
NO
pu
C o~ay
S
NO
S
NO