ML17306A750

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-528/92-10,50-529/92-10 & 50-530/92-10 & Notice of Violation.Addl Licensee Mgt Attention Required to Improve Equipment Performance in Listed Areas
ML17306A750
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 05/15/1992
From: Richards S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17306A751 List:
References
NUDOCS 9206020167
Download: ML17306A750 (5)


See also: IR 05000528/1992010

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1460 MARIALANE, SUITE 210

WALNUTCREEK, CALIFORNIA94N6-6368

MAY 15

1992

Docket Nos.

50-528,

50-529,

and 50-530

License

Nos.

NPF-41,

NPF-51

and NPF-74

Arizona Public Service

Company

P.O.

Box 53999, Station

9012

Phoenix,

Arizona

85072-3999

Attention:

Hr.

W. F.

Conway

Executive Vice President,

Nuclear-

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

NRC

INSPECTION

REPORT

NO. 50-528/529/530/92-10

This refers to the inspection

conducted

by D. Coe,

'W. Ang, L. Coblentz,

D. Corporandy,

F, Ringwald, J. Sloan,

and L. Tran of this office, on March 1,

t.

iugh April li, 1992.

The inspection

included

a Ieview of activities

authorized for your Palo Verde facility.

At the conclusion of the inspection,

the findings were discussed

with those

members of your staff identified in the

enclosed report.

Areas

examined during the inspection

are identified in the report.

Within

these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observation of

activities in progress.

Based

on the results of this inspection,

certain of your activities appeared

to be in violation of NRC requirements,

as specified in the enclosed

Notice of

Violation (Notice).

The one violation involved a radiation area which was not

posted

as required in Unit 1.

Because

our further review indicated that this

was

an isolated condition,

and your corrective actions

were prompt

and

adequate,

a response

to this violation is not required.

Your attention is directed to paragraph

7 of the enclosed

report.

This

paragraph

discIIsses electrical distribution and balance-of-plant

equipment

failures which caused

a reactor trip in Unit 2 or subsequently

contributed to

significant water

hammers

in the feedwater

and condensate

systems.

In one of

the cases,

the equipment

problem had

been previously recognized

but not

sufficiently addressed

to preclude

the event.

Additional licensee

management

attention

appears

necessary

to improve equipment

performance

in these

areas

to

reduce challenges

to the plant protection

systems.

Paragraph

5 of the enclosed

report discusses

an event in Unit 2 when work was

performed

on the condensate

system which nearly resulted

in a plant transient.

This work is normally scheduled

to be performed with the unit shutdown,

but

was performed without adequate

precautions

to preclude

a pump trip during

9206020167

920515

PDR

ADOCK 05000528

8

PDR

I=g )

0

power operations.

This issue is of concern in light of other recent

events

where

weak work control

was evident.

In accordance

with 10 CFR Part 2.790 of the NRC's "Rules of Practice,"

a copy

of this letter and the enclosures will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this inspection,

we will be glad to

discuss

them with you.

Sincerely,

S. A. Richards,

Chief

Reactor Projects

Branch

Enclosures:

1.

Notice of Violation

2.

Inspection

Report Nos. 50-528/92-10,

50-529/92-10

and

5C- 530/92-10

cc w/enclosures:

Mr. 0. Hark DeHichele,

APS

Mr. James

H. Levine,

APS

Hr. R. Stevens,

APS

Mr. S. Guthrie,

APS

Hr. E.

C. Simpson,

APS

Hr. Robert

W. Page,

APS

Hr. Thomas

R. Bradish,

APS

Hr. Jack

R.

Newman,

Esq.,

Newman

& Holtzinger P. C., Washington,

DC

Mr. Curtis L. Hoskins,

El

Paso Electric Company,

Phoenix,

AZ

Hr. Roy P.

Lessey, Jr.,

Esq., Akin, Gump, Strauss,

Hauer

and Feld

Mr. James

A. Boeletto,

Esq., Assistant Council, Southern California Edison

Company,

Rosemead,

CA

Hr. Charles

B. Brinkman,

Combustion

Engineering,

Inc.

Mr. Steve Olea, Chief Engineer,

Arizona Corporation

Commission

Hr. Al Gutterman,

Newman

& Holtzinger P.C.

Hr. Bradley

W. Jones,

Esq., Akin, Gump, Strauss,

Hauer

and Feld

Hr. William A. Wright, Interim Acting Director, Arizona Radiation

Regulatory

Agency

(ARRA), Phoenix,

AZ

Chairman,

Haricopa County Board of Supervisors,

Phoenix,

AZ

Hs.

Nancy

C. Loftin, Esq.,

APS

power operations.

This issue is of concern in light of other recent events

where weak work control

was evident.

In accordance

with 10 CFR Part 2.790 of the NRC's "Rules of Practice,"

a copy

of this letter and the enclosures will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this inspection,

we will be glad to

discuss

them with you.

Sincerely,

S. A. Richards,

Chief

Reactor Projects

Branch

Enclosures:

1.

Notice of Violation

2.

Inspection

Report

Numbers 50-528/92-10,

50-529/92-10,

and 50-530/92-10

bcc w/enclosures:

Docket file

Resident

Inspector

(4)

Project Inspector

Hr.

G.

Cook

Hr. B. Faulkenberry

Hr. J. Hartin

bcc w/o enclosures:

H. Smith

J. Zollicoffer

REGION V/Ann

g~ @~4 utdud

Co wc c 4 0.~~$

DCoe

/

/92

FRingwald

/

/92

JSloan

/

/92

LTran

/

/92

~EN

~YE

N

~YE

MM

~YE

I

LCoblentz

/

/92

DCorporandy

/

/92

WAng/

/92

RHuey

/

/92

YES

NO

]

C

~YE

N

~YES

~YEE

N

SLichyrds

HWong

KPerkins

RZimmerman

S(g</92

Q

j9EEYMIEYE

E

II

~EYEE

NN

~Y MME

~NE

Should you have

any questions

concerning this inspection,

we will be glad to

discuss

them with you.

Sincerely,

S. A. Richards,

Chief

Reactor Projects

Branch

Enclosures:

1.

Notice of Violation

2.

Inspection

Report

Numbers 50-528/92-10,

50-529/92-10,

and 50-530/92-10

bcc w/enclosures:

Docket file

Resident

Inspector

(4)

Project Inspector

Hr.

G.

Cook

Hr. B. Faulkenberry

Hr. J. Hartin

bcc w/o enclosures:

H. Smith

J. Zollicoffer

REGION V/Ann

DCoe+~*r

g/r3/92

FRingwald

+~+92

JSloan

~/Q/92

LTran

y-/is/92

5T/ 5/r/e

86 C~/zq

ES

NO

YES

0

YES

0

YES

~Sf

LCob1 ntz

DCorporan

g WAnP +

~/I'

2

~////92

r/gf/92

RHuey

Q/Q/92

)

ES

NO

NO

ES

NO

YES

NO

SRichards

/

/92

HWong+

S/i +92

immerma

9

YES

NO

S

NO

YES

NO

pu

C o~ay

S

NO

S

NO