Category:CORRESPONDENCE-LETTERS
MONTHYEARML17313B0991999-10-14014 October 1999 Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included ML17300B3331999-09-14014 September 1999 Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 ML17300B3351999-09-0808 September 1999 Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met ML17313B0761999-09-0303 September 1999 Requests Enforcement Discretion to TS Section 3.8.1, AC Sources - Operating. Enforcement Discretion Would Allow,On One Time Basis,Extension of Completion Time in Required Action B.4 of TS 3.8.2 from 72 H to 108 H ML17313B0731999-08-31031 August 1999 Informs That RR Bean (License OP-50452-1) Has Been Permanently Reassigned to Position That Does Not Require License & Requests That Individuals License Be Expired Per 10CFR55.55 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML17313B0581999-08-0606 August 1999 Forwards Rev 1 of Changes to TS Bases Implemented Between Aug 1998 & Jul 1999.Insertion Instructions & List of Affected Pages Included ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML17313B0311999-08-0303 August 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001 ML17313B0431999-07-30030 July 1999 Advises of Listed Senior Mgt Changes That Have Taken Place at Plant ML17313B0441999-07-30030 July 1999 Forwards Comments on Draft NRC Repts Evaluation of AOVs at Us Light-Water Reactors (1999) & Idaho Natl Engineering & Environ Lab Rept (INEEL)EXT-98-00383,Study of AOVs in Npps. ML17313B0091999-07-20020 July 1999 Forwards Requested Calculations Performed to Verify That Increase in Max Radially Averaged Enrichment for Fuel Assemblies from 4.3 Weight Percent to 4.8 Weight Percent Did Not Affect Requirements for TSs 3.7.15,3.7.17 & 4.3.1 ML17313B0151999-07-20020 July 1999 Submits Request to Obtain All Data Previously Sent by PVNGS & Currently in REIRS for OLs NPF-41,NPF-51 & NPF-74.Data Is Requested in Electronic Form (Ascii Format) as It Currently Exists in REIRS Sys ML17313B0171999-07-16016 July 1999 Forwards LER 99-005-00,re Automatic Rt Which Occurred on 990618,following Sensor Failure in Core Protection Calculators.Corrective Actions Described in LER Are Not Necessary to Maintain Compliance with Regulations ML17300B3111999-07-15015 July 1999 Forwards PVNGS Unit 2 ISI Rept for Eighth Refueling Outage. No Commitments Made to NRC by Ltr ML17300B3141999-07-15015 July 1999 Forwards Corrected Electronic Files for Individual Monitoring Repts for 1998.Original Electronic Files Were Found to Have Two Administrative Errors,Which Has Been Corrected.Encl Withheld,Per 10CFR2.790 ML20209G6771999-07-0808 July 1999 Forwards Supplemental Info to Confirm That Decommissioning Funding Plans of Public Service Co of Nm for Interests in PVNGS Have Been Reviewed by Nm Public Regulation Commission. Final Order & Recommended Decisions in Case 2742,also Encl ML17300B2931999-07-0202 July 1999 Submits Withdrawal of Relief 5 for Second ISI Interval for Units 1,2 & 3.Proposed Alternative Is Related to Exam Requirements for Component Supports for Second ISI Interval ML17300B2831999-06-26026 June 1999 Requests NRC Approval of Proposed Alternative IAW Provisions of 10CFR50.55a(a)(3)(i) to 10CFR50.55a(g) & Requirements of ASME Boiler & Pressure Vessel Code Section XI for Repairs & Installation.Description of Proposed Alternative,Encl ML17313A9951999-06-26026 June 1999 Provides Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML17313A9901999-06-15015 June 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. No Commitments Being Made to NRC by Ltr ML17313A9521999-05-24024 May 1999 Notifies NRC That Ja Proctor,License SOP-50314,has Been Permanently Reassigned to Position That Does Not Require License.License Should Be Expired,Per 10CFR55.55 ML20206Q3111999-05-18018 May 1999 Final Response to FOIA Request for Documents.Forwards App a Records Being Released in Entirety ML17313A9311999-05-13013 May 1999 Notifies NRC That Rev 2 to COLR for Unit 2 Remains Applicable Following Recently Completed Unit 2 Reload ML17313A9481999-05-12012 May 1999 Informs of Change Needed in Order to Update Current Mailing List.Future Mailings for J Horne Should Be Forwarded to Listed Address ML17313A9261999-05-0707 May 1999 Forwards LER 99-004-00,per 10CFR50.73.LER Repts Findings & Corrective Actions Taken as Result of Unit 2 Out of Tolerance Pressurizer Safety Valve (Psv) Condition Which Was Discovered During Outage Testing ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML17313A9091999-04-30030 April 1999 Forwards Proprietary Proposed Test Outlines for Initial License Exams to Be Administered at PVNGS in Aug/Sept 1999. No Commitments Are Contained in Ltr.Proprietary Info Withheld ML17313A9181999-04-30030 April 1999 Forwards Electronic File of Individual Monitoring Repts for 1998.Encl Withheld Per 10CFR2.790 ML17313A9191999-04-30030 April 1999 Forwards Special Rept 2-SR-99-001 Re SG Tube Plugging in PVNGS Unit 2,per TS Reporting Requirement 5.6.8.Complete Results of SG Tube Inservice Insp Will Be Submitted by 000422 ML17300B3751999-04-23023 April 1999 Forwards LER 99-003-00,reporting Condition Prohibited by TS 3.7.17 Where Spent Fuel Assembly Was Stored in Inappropriate Region in Spent Fuel Pool ML17313A9081999-04-23023 April 1999 Documents 990421 Telcon with E Emeigh,Which Requested Extension for Submitting Next Matl Balance Rept for Pvngs,As Required by 10CFR70.53 & 74.13.Required Info Will Be Submitted by 990531 ML20205T7421999-04-21021 April 1999 Forwards Partially Withheld Insp Repts 50-528/99-05, 50-529/99-05 & 50-530/99-05 on 990322-26.Determined That Security Program Properly Implemented.Insp Repts Details Withheld (Ref 10CFR73.21) ML17313A9031999-04-21021 April 1999 Forwards Rev to Relief Request 12 Submitted 990420 to Second 10-yr ISI Interval.Revised Relief Request Discusses in More Detail Actions APS Will Take When There Is Identified Leakage from Bolted Connection ML17313B0271999-04-21021 April 1999 Forwards Proprietary Epec Pro Forma Cashflow Statement for 1999.Proprietary Info Withheld,Per 10CFR2.790.Affidavit Encl ML17313A8971999-04-20020 April 1999 Requests Use of Alternatives to 10CFR50.55a(g) Inservice Insp Requirements.Proposed Alternatives Are Related to Visual Exam of Bolted Connections 05000529/LER-1999-002, Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing1999-04-19019 April 1999 Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing ML17313A8931999-04-14014 April 1999 Forwards LER 99-003,reporting Condition Prohibited by TSs That Existed When Surveillance Requirement to Verify Essential Chilled Water Sys Valve Positions Was Not Met ML20205Q0821999-04-13013 April 1999 Forwards Second ISI Interval Relief Request 10 from ASME Section XI & Applicable Addenda Re Visual Exams Performed Subsequent to Repair or Replacement of Component or Alteration of Item ML17313A8901999-04-13013 April 1999 Forwards LER 98-003-01 Re MSSV as-found Lift Pressures out- Side of TS Limits.Ler Suppl Provides Evaluation Findings from Unit 3 out-of-tolerance MSSVs Conditions Which Were Discovered During pre-outage Testing ML17313A8831999-04-0808 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Pvngs,Units 1,2 & 3 & Rev 13 to ODCM, for Pvngs,Units 1,2 & 3 IAW TS 5.6.3 ML20205N2921999-04-0606 April 1999 Responds to Re Characterization & Decommissioning Plans,Both .Advises That Because License SNM-368 Had Been Terminated,Contractor Must Conduct Activities Involving Source Matl ML20205F3491999-03-30030 March 1999 Forwards Proprietary & non-proprietary Info Re Status of Decommissioning Funding for Pvngs,Units 1,2 & 3,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per Requirements of 10CFR2.790(b)(1) ML17313A8671999-03-24024 March 1999 Submits Info Re Present Levels & Sources of Property Insurance Maintained for Pvngs,Per 10CFR50.54(w)(3) ML17313A8601999-03-16016 March 1999 Forwards Revised Relief Requests PRR-05,PRR-06 & PRR-11 to Clarify That Proposed Design Flow Testing for Lpsi,Hpsi & Containment Spray Pumps Will Be Performed Using Instruments That Comply with Code Requirements,Per 990226 Telcon 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17313B0991999-10-14014 October 1999 Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included ML17300B3331999-09-14014 September 1999 Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 ML17300B3351999-09-0808 September 1999 Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met ML17313B0761999-09-0303 September 1999 Requests Enforcement Discretion to TS Section 3.8.1, AC Sources - Operating. Enforcement Discretion Would Allow,On One Time Basis,Extension of Completion Time in Required Action B.4 of TS 3.8.2 from 72 H to 108 H ML17313B0731999-08-31031 August 1999 Informs That RR Bean (License OP-50452-1) Has Been Permanently Reassigned to Position That Does Not Require License & Requests That Individuals License Be Expired Per 10CFR55.55 ML17313B0581999-08-0606 August 1999 Forwards Rev 1 of Changes to TS Bases Implemented Between Aug 1998 & Jul 1999.Insertion Instructions & List of Affected Pages Included ML17313B0311999-08-0303 August 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001 ML17313B0441999-07-30030 July 1999 Forwards Comments on Draft NRC Repts Evaluation of AOVs at Us Light-Water Reactors (1999) & Idaho Natl Engineering & Environ Lab Rept (INEEL)EXT-98-00383,Study of AOVs in Npps. ML17313B0431999-07-30030 July 1999 Advises of Listed Senior Mgt Changes That Have Taken Place at Plant ML17313B0091999-07-20020 July 1999 Forwards Requested Calculations Performed to Verify That Increase in Max Radially Averaged Enrichment for Fuel Assemblies from 4.3 Weight Percent to 4.8 Weight Percent Did Not Affect Requirements for TSs 3.7.15,3.7.17 & 4.3.1 ML17313B0151999-07-20020 July 1999 Submits Request to Obtain All Data Previously Sent by PVNGS & Currently in REIRS for OLs NPF-41,NPF-51 & NPF-74.Data Is Requested in Electronic Form (Ascii Format) as It Currently Exists in REIRS Sys ML17313B0171999-07-16016 July 1999 Forwards LER 99-005-00,re Automatic Rt Which Occurred on 990618,following Sensor Failure in Core Protection Calculators.Corrective Actions Described in LER Are Not Necessary to Maintain Compliance with Regulations ML17300B3111999-07-15015 July 1999 Forwards PVNGS Unit 2 ISI Rept for Eighth Refueling Outage. No Commitments Made to NRC by Ltr ML17300B3141999-07-15015 July 1999 Forwards Corrected Electronic Files for Individual Monitoring Repts for 1998.Original Electronic Files Were Found to Have Two Administrative Errors,Which Has Been Corrected.Encl Withheld,Per 10CFR2.790 ML20209G6771999-07-0808 July 1999 Forwards Supplemental Info to Confirm That Decommissioning Funding Plans of Public Service Co of Nm for Interests in PVNGS Have Been Reviewed by Nm Public Regulation Commission. Final Order & Recommended Decisions in Case 2742,also Encl ML17300B2931999-07-0202 July 1999 Submits Withdrawal of Relief 5 for Second ISI Interval for Units 1,2 & 3.Proposed Alternative Is Related to Exam Requirements for Component Supports for Second ISI Interval ML17313A9951999-06-26026 June 1999 Provides Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML17300B2831999-06-26026 June 1999 Requests NRC Approval of Proposed Alternative IAW Provisions of 10CFR50.55a(a)(3)(i) to 10CFR50.55a(g) & Requirements of ASME Boiler & Pressure Vessel Code Section XI for Repairs & Installation.Description of Proposed Alternative,Encl ML17313A9901999-06-15015 June 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. No Commitments Being Made to NRC by Ltr ML17313A9521999-05-24024 May 1999 Notifies NRC That Ja Proctor,License SOP-50314,has Been Permanently Reassigned to Position That Does Not Require License.License Should Be Expired,Per 10CFR55.55 ML17313A9311999-05-13013 May 1999 Notifies NRC That Rev 2 to COLR for Unit 2 Remains Applicable Following Recently Completed Unit 2 Reload ML17313A9481999-05-12012 May 1999 Informs of Change Needed in Order to Update Current Mailing List.Future Mailings for J Horne Should Be Forwarded to Listed Address ML17313A9261999-05-0707 May 1999 Forwards LER 99-004-00,per 10CFR50.73.LER Repts Findings & Corrective Actions Taken as Result of Unit 2 Out of Tolerance Pressurizer Safety Valve (Psv) Condition Which Was Discovered During Outage Testing ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML17313A9191999-04-30030 April 1999 Forwards Special Rept 2-SR-99-001 Re SG Tube Plugging in PVNGS Unit 2,per TS Reporting Requirement 5.6.8.Complete Results of SG Tube Inservice Insp Will Be Submitted by 000422 ML17313A9181999-04-30030 April 1999 Forwards Electronic File of Individual Monitoring Repts for 1998.Encl Withheld Per 10CFR2.790 ML17313A9091999-04-30030 April 1999 Forwards Proprietary Proposed Test Outlines for Initial License Exams to Be Administered at PVNGS in Aug/Sept 1999. No Commitments Are Contained in Ltr.Proprietary Info Withheld ML17300B3751999-04-23023 April 1999 Forwards LER 99-003-00,reporting Condition Prohibited by TS 3.7.17 Where Spent Fuel Assembly Was Stored in Inappropriate Region in Spent Fuel Pool ML17313A9081999-04-23023 April 1999 Documents 990421 Telcon with E Emeigh,Which Requested Extension for Submitting Next Matl Balance Rept for Pvngs,As Required by 10CFR70.53 & 74.13.Required Info Will Be Submitted by 990531 ML17313B0271999-04-21021 April 1999 Forwards Proprietary Epec Pro Forma Cashflow Statement for 1999.Proprietary Info Withheld,Per 10CFR2.790.Affidavit Encl ML17313A9031999-04-21021 April 1999 Forwards Rev to Relief Request 12 Submitted 990420 to Second 10-yr ISI Interval.Revised Relief Request Discusses in More Detail Actions APS Will Take When There Is Identified Leakage from Bolted Connection ML17313A8971999-04-20020 April 1999 Requests Use of Alternatives to 10CFR50.55a(g) Inservice Insp Requirements.Proposed Alternatives Are Related to Visual Exam of Bolted Connections 05000529/LER-1999-002, Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing1999-04-19019 April 1999 Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing ML17313A8931999-04-14014 April 1999 Forwards LER 99-003,reporting Condition Prohibited by TSs That Existed When Surveillance Requirement to Verify Essential Chilled Water Sys Valve Positions Was Not Met ML20205Q0821999-04-13013 April 1999 Forwards Second ISI Interval Relief Request 10 from ASME Section XI & Applicable Addenda Re Visual Exams Performed Subsequent to Repair or Replacement of Component or Alteration of Item ML17313A8901999-04-13013 April 1999 Forwards LER 98-003-01 Re MSSV as-found Lift Pressures out- Side of TS Limits.Ler Suppl Provides Evaluation Findings from Unit 3 out-of-tolerance MSSVs Conditions Which Were Discovered During pre-outage Testing ML17313A8831999-04-0808 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Pvngs,Units 1,2 & 3 & Rev 13 to ODCM, for Pvngs,Units 1,2 & 3 IAW TS 5.6.3 ML20205F3491999-03-30030 March 1999 Forwards Proprietary & non-proprietary Info Re Status of Decommissioning Funding for Pvngs,Units 1,2 & 3,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per Requirements of 10CFR2.790(b)(1) ML17313A8671999-03-24024 March 1999 Submits Info Re Present Levels & Sources of Property Insurance Maintained for Pvngs,Per 10CFR50.54(w)(3) ML17313A8601999-03-16016 March 1999 Forwards Revised Relief Requests PRR-05,PRR-06 & PRR-11 to Clarify That Proposed Design Flow Testing for Lpsi,Hpsi & Containment Spray Pumps Will Be Performed Using Instruments That Comply with Code Requirements,Per 990226 Telcon ML17313A8551999-03-0505 March 1999 Requests Proposed Code Alternative IAW 10CFR50.55a(e)(3),as Acceptable Alternative to Requirements of 10CFR50.55a(e)(1), for Installation of in-line safety-related Flow Measurement Instrument in ASME Class 3 Pipe ML17313A8241999-02-23023 February 1999 Advises That Kp Jarvis,License OP-50287-1,no Longer Needs to Maintain License as Permanently Assigned to Position Requiring No License ML17313A8111999-02-18018 February 1999 Forwards PVNGS Unit 3 7th Refueling Outage, Which Provides Complete Results of SG Tube Inservice Insp Performed,Per TS 5.6.8 ML17313A8721999-02-16016 February 1999 Discusses Resolution of Generic Safety Issue 171, ESF Failures from Loss-of-Offsite Power Subsequent to Loca. Util Has Low Vulnerability to Loca/Grid Collapse/Loop Scenario ML17313A7611999-01-22022 January 1999 Forwards PVNGS Unit 3 Inservice Insp Rept Seventh Refueling Outage, Per 10CFR50.55a.Ltr Contains No New Commitments 1999-09-08
[Table view] |
Text
JEFF BINGAMAN 624 HART SENATE OFFICE BLDG.
NEW MEXICO ~r WASHINGTON, DC 20510-3102 (202) 224-5621 1 IN NEW MEXICO 1-800-443-8858 a TDD (202) 224-1782
'Bnittil @tatts @taatt November 29, 1991 Mr. Dennis K. Rathbun Director, Congressional Affairs Office of Government and Public Affairs Nuclear Regulatory Commission 1717 H Street Washington, D.C. 20555 Dear Mr. Rathbun".
I have. received the enclosed letter from Mr. Larry Owen Lundy regarding the Palo Verde Nuclear Plant.
I would appreciate your assistance in responding to my constituent',s concerns. Please look into this matter and report back directly to my constituent with your findings. Please provide my office with,.a copy of your response.
Thank you for your attention to this matter.
Sincerely, f 'ng man ed S tes Senator JB/tlk Enclosure 9i i23i0164 9i i2i9 PDR ADOCK 05000528 P PDR ALBUQUERQUE LAS CRUCES RO SWELL SANTA FE (505) 786-3638 (505) 623-8581 (505) 622-7113 (506) 888-8847 PRINTED ON RECYCLED PAPER
C I"
~
l
'l J
DISTRIBUTION:
Docket File (50-528,50-529,50-530)
NRC 8 Local PDRs EDO ¹0007258 EDO Reading J. Sniezek J. Blaha H. Thompson T. Hurley/F. Hi raglia J. Partlow PDV r/f B. Boger H. Virgilio OGC(15B18)
SECY (91-1172)
J Taylor
~
E. Tana, PHAS (EDO¹0007258) w/cy of incoming T. Gibbons CD Thompson w/cy of incoming PDV gt file R. Zimmerman,RV J. Hartin, RV W. Russell F. Gillespie C. Smyre
FF
)
a)
K',')',p'
~ I )WV I I
E I PI I' y It I AfWQ I WF I
W II h
n F
Mr. Larry Owen Lundy P.O. Box 598 Aztec, New Mexico 87410
Dear Hr. Lundy:
Senator Bingaman requested that the Nuclear Regulatory Commission (NR respond to your letter dated July 1, 1991, concerning the Palo Verd Nuclear Plant in Phoenix, Arizona.
The Palo Verde Nuclear Station (Plant) has three operating uni . Full power licenses were granted for Units 1, 2 and 3, on June 1, 1985, pril 24, 1986, and November 25, 1987, respectively. These licenses were o y granted after thorough licensing reviews and preoperational testing for ach unit. The information regarding the authorization to operate at 10 I is inaccurate. At present these plants are authorized to operate at 100K ull power.
To respond to your fears about nuclear energy, the C, has the sole responsibility in this country to regulate nuclea power. With this responsibility, the NRC has the major function protect the health and safety of the public. To further carry out t s function, the NRC has stationed employees, Resident Inspectors, at ll nuclear power plants, including Palo Verde. These Resident Insp tors monitor plant operations ensuring that the facility is safely oper ed in accordance with technical specifications and conditions associate with the operating license.
In order to make information publica y available, NRC has established a local public document room (PDR) for Palo erde Nuclear Station. This PDR is located at the Phoenix Public Lib ry,. 12 East McDowell Road, Phoenix, Arizona.
We hope that our response to our concerns show you that the NRC is taking appropriate actions to ensu safe operation of all Palo Verde Nuclear Station operating reactors.
Sincerely, Thomas E. Hurley, Director Office of Nuclear Reactor Regulation cc: The Honor le Jeff Bingaman OFC :PDV/'PH PDV/LA TECH EDITOR AD45/DRPW D/DRPW NAME :CTPompson DFoster O'Msl'h f+ HVirgilio BBoger DATE :,~/ /91 / /91 lgl2./91 / /91 / /91 OFC .ADP/NRR D/NRR EDO GPA/CA NAME :JPartlow TMurley DATE : / /91 / /91 / /91 / /91
4
~
y 1 4 I'4 )I fUFb ~P fi 4
4 IU ti Ul 4
T, 4 14 I t 4 4 U 4
~ I ~ 4 4
'v tt I ll tf 41 4 'l
( 4' 44 / ~ 'I
!')4 4
I!'44 t ' P
)IUi V k I
)1 4 I 4 it 4t t T
Il Vl I II 4 4 )bU 4,
TtV' Ub i
4 Ml" 4 4 4 , I(4 4 "FU, 'I f1 Ui 4 'I I
1 4 li 'll fi MU $ 44 b'4' 4
)U It U. Il ft it 4 bV
- r. Ti'I
) ! ;, 4,< r
'4't'h
'44 4 'I 4 4 IU '11 \ 4 4 i f 4 i ,;r Fi 4
Hr. Larry Owen Lundy P.O. Box 598 Aztec, New Mexico 87410
Dear Mr. Lundy:
Senator Bingaman requested that the U.S. Nuclear Regulatory Commission (NRC) respond to your letter of June 24, 1991, concerning the Palo Verde Nuclear Generating Station in Phoenix, Arizona.
Palo Verde has three operating units. The NRC granted full power licenses for Units 1, 2 and 3, on June 1, 1985, April 24, 1986, and November 25, 1987, respectively. These licenses were granted after thorough licensing reviews and successful completion of preoperational testing for each unit. The information regarding the authorization to operate at 50-percent power is inaccurate. At present these plants are authorized to operate at 100-percent power.
You expressed fears about nuclear energy. The NRC has the sole responsibility in this country to regulate commerical nuclear power and to protect the health and safety of the public and the environment. To assist in carrying out this charter, the NRC has stationed resident inspectors at all nuclear power plants, including Palo Verde. These resident inspectors monitor plant operations ensuring that the facility is safely operated in accordance with technical specifications and conditions associated with the operating license.
To make information publically available, NRC has established a local public document room (PDR) for Palo Verde. This PDR is located at the Phoenix Public Library, 12 East HcDowell Road, Phoenix, Arizona.
We hope that our response to your concerns show you that the NRC is taking appropriate actions to ensure safe operation of each operating reactor at the Palo Verde Nuclear Generating Station.
Sincerely, Thomas E. Hurley, Director Office of Nuclear Reactor Regulation cc: The Honorable Jeff Bingaman 4See previous concurrence OFC: PDV~H PDV/L 4TECH EDITOR AD R D/DRPW NAME :(gNmpson D os JMain HV BBoger DATE: )~(g /91 l~l(o/91 12/12/91 @//C 1 / /91 OFC :ADP/NRR D/NRR .EDO GPA/CA NAME :JPartlow TMurley DATE : / /91 / /91 ./ /91 / /91
II r 4 4 I rt tt ey t)pe 6+
II za, Ij j,pt V h I
3 ll,t I WV I' t 4 4 '
hi rhj
'L
' t ~
tt hrt h
ll
~ 4 4 ltt
') 4 t
rtr Vt lt I t
Il II 4) I thi IP
~ I J F
4 t
4 r 4
4
U REoy
~
r~ gpss UNITED STATES 0 COMMISSION NUCLEAR REGULATORY PrincfgP'N88P} 8$j99N5ence Control n
a' W a EDO Gp gO
+**++ 0007258 EDO CONTROL:
DUE- 12/23/91 DOC DT- 11/29/91 FROM:
FINAL REPLY:
Sen. Jeff Bingaman TO:
Dennis Rathbun, OCA 91-1172 CRC NO:
OF: GRN FOR SIGNATURE Mur 1 ey ROUTING:
DESC:
REGARDING Tay1 OI" LARRY OWEN LUNDY Sni ezek ENCLOSES LETTER FROM PALO VERDE Thompson Blaha DATE: 12/10/91 JMartin, RV CONTACT:
ASSIGNED TO: Mu NRR OR REMARKS:
SPECIAL INSTRUCTIONS CONSTITUENT WITH CC REPLY DIRECT TO TO SEN. BINGAMAN.
'3>.
yg p.g.. I@&
tUgg. kP~. BI27~ /3~~<
g p.g. g,o~ ~ur/
p r'~
Per p~
f2~rz w//
At:TIQN
$ myy~ DUE TO NRR DtRECTOR'S OFFI.""
BY a, /8'
)
l~
C, o j
J~
h gr~Q ~
~ q/
1 ~'l
, ~
JUL -tt'.H-4:-l a /g /
Cy7 ITc,-c ap t.
V
~
II il
~
Il I,l J
/
. M..Uek.
C eS lg I'
I I
aA
-p
)',I l~j~
~4
...AA4~
4
/-
ll(
~
,II I
k<A
.. xf
~.
~%
li lj i>
/%
October. 28. 1991 DISTRIBUTION DOCKET, NO(S). 50-528, 50-529 'ocket File.-
50-530 PDV R/F RCesaro CTrammell CThompson TO: Addressees Listed SUBJECT. MONTHLY OPERATING REPORT FOR PALO VERDE UNITS 1, 2, AND 3
' '.;. The following documents concerning our review of the subject facility are, transmitted for your. information.
DESCRIPTION OF DOCUMENT DATED Notice of Receipt of Application Draft/Final Environmental Statement Notice of Availability of Draft/Final Environmental Statement Safety Evaluation Report, or Supplement No.
Environmental Assessment and Finding of No Significant Impact Notice of Issuance of Environmental Assessment Notice of Consideration of Issuance of Facility Operating License or Amendment 'to Facility Operating License Biweekly Notice; Applications and Amendments to Operating Licenses tq
~ 5, No Si nifleant Hazards Conditions 'nvolvin See Page(s)
Exemption Construction Permit No. CPPR- , Amendment No.
Facility Operating License No. ,Amendment No; Order Monthly Operating Report for transmitted by Letter 10/14/91.
Annual/Semi-Annual Report:
transmitted by Letter
.Other
' Office of Nuclear Reactor Regulation Project Directorate V
Enclosures:
Division'f Reactor Projects III/IV/V As Stated
": See next page OFFICE> . LA:.P.Dv..
SURNAME>
.66-..~...
DATE& 10(28/91
,'., NRC FORM 3ta (10/aol NRCM 0240
'FFICIAL RECORD'OPY
e II
)
,il
October 7, 1991 EQGKET No(s). 50 528, 50 529 DISTRIBUTION:
and 50-530 cket File 05 r RCesaro 4
CTRammell TO: Addressees Attached CThompson I
?
sUBJEGT: Palo Verde Nuclear Station, Units 1, 2, and 3 The following documents concerning our review of the subject facility are transmitted for your information.
DESCRIPTION OF DOCUMENT DATED Notice of Receipt of Application Draft/Final Environmental Statement Notice of Availability of Draft/Final Environmental Statement Safety Evaluation Report, or Supplement No.
Environmental Assessment and Finding of No Significant Impact Notice of Issuance of Environmental Assessment Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License Biweekly Notice; Applications and Amendments to Operating Licenses Involvin No Si nificant Hazards Conditions See Page(s)
Exemption Construction Permit No. CPPR- , Amendment No.
Facility Operating License No. Amendment No.
Order Monthly Operating Report for A"g 91 for Units 1, 2, and 3 transmitted by Letter a an une or nz Annual/Semi-Annual Report:
transmitted by Letter Other tT,
,e
'J Office of Nuclear Reactor Regulation Project Directorate Y tb a
Enclosures:
See attached Division of Reactor Projects III/IY/Y As Stated CC:
LA PD5 SURNAME>
OATE> 10/7/91 NRC FORM 318 (10/80) NRCM 0240 OFFICIAL RECORD COPY
W
~ ~
September 11, 1991 DOCKET NO(SI. 50-528 50-529 50-530 DISTRIBUTION:
<Docket. Fil e- >
PDV r/f RCesaro TO: Addressees Attached CThompson CTrammell suBJECT: Palo Yerde Nuclear Station, Units 1, 2, and 3 The following documents concerning our review of the subject facility are transmitted for your information.
DESCRIPTION OF DOCUMENT DATED Notice of Receipt of Application Draft/Final Environmental Statement Notice of Availability of Draft/Final Environmental Statement Safety Evaluation Report, or Supplement No.
Environmental Assessment and Finding of No Significant Impact Notice of Issuance of Environmental Assessment Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License Biweekly Notice; Applications and Amendments to Operating Licenses Involvin No Si nifIcant Hazards Conditions See Page(s)
Exemption Construction Permit No. CPPR- Amendment No.
Facility Operating License No. ,Amendment No.
Order Monthly Operating Report for transmitted by Letter Annuai/Semi-AnnuaiReport: Semiannual Radioactive Effluent Release Re ort, Jan-June 1991 transmitted by Letter Other Office of Nuclear Reactor Regulation Project Directorate Y Division of Reactor Projects III/IV/Y See attached As stated CC:
OFFICE> PA:PDV
~ SURNAME>
oA1Ei 9/11/91.,-;
NRC FORM 318 (10/80) NRCM 0240 OFFICIAL RECORD COPY
f h' lh 4
E =- ~*
0
~ I
August 29, 1991 t7
,T E'DGKET No(s) 50-528 DISTRIBUTION:
50-529 5O-530 'Docket File PDV r/f RCesaro CThompson CTrammell TO: Addressees Attached Palo Yerde Nuclear Station, Units 1, 2, and 3 The following documents concerning our review of the subject facility are transmitted for your information.
DESCRIPTION OF DOCUMENT DATED Notice of Receipt of Application Draft/Final Environmental Statement Notice of Availability of Draft/Final Environmental Statement 7E I Safety Evaluation Report, or Supplement No.
II,"
Environmental Assessment and Finding of No Significant Impact Notice of Issuance of Environmental Assessment Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License Biweekly Notice; Applications and Amendments to Operating Licenses Involvin No Si nificant Hazards Conditions See Page(s)
,'77 tt Exemption Construction Permit No. CPPR Amendment No.
iS>
ir ' Facility Operating License No. ,Amendment No.
Order Monthly Operating Report for transmitted by Letter
't Annual/Semi-Annual Report:
transmitted by Letter Other I
Office of Nuclear Reactor Regulation Project Dir ectorate Y lT Division of Reactor Prospects III/IV/V
Enclosures:
See attaChed 7'ET As Stated CC:
IA v
oencE LA: PDV t)7 ')
SURNAME>,R e .O
,"7,.';, ETATE NRC FORM 318 (.10/ao) NRCM 0240 OFFICIAL RECORD COPY
h a
I N
'I I4
)
1 I ~
\
4 L I i
h
July ll, 1991 Dq strq but>on.
DQGKET No(s). 50-528 50-529 I Docket File 50-530 PD V Reading File RCesaro CThompson CTrammell TO: Addreasees Attached
SUBJECT:
PALO VERDE NUCLEAR STATION UNIT NOS 1/2/3 MONTHLY OPERATING REPORT The following documents concerning our review of the subject facility are transmitted for your information.
DESCRIPTION OF DOCUMENT DATED Notice of Receipt of Application Draft/Final Environmental Statement Notice of Availability of Draft/Final Environmental Statement Safety Evaluation Report, or Supplement No.
Environmental Assessment and Finding of No Significant Impact Notice of Issuance of Environmental Assessment Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License Biweekly Notice; Applications and Amendments to Operating Licenses Involvin No Si nifIcant Hazards Conditions See Page(s)
Exemption Construction Permit No. CPPR- , Amendment No.
Facility Operating License No. Amendment No.
Order Monthly Operating Report for transmitted by Letter Annual/Semi-Annual Report:
transmitted by Letter Other Office of Nuclear Reactor Regulation Project Directorate V
Enclosures:
Division of Reactor Projects III/IV/V As Stated cc: See attached OFFICE> PDV:LA suRNAMEa 0ATEi NRC FORM 318 (10I80) NRCM 0240 OFFICIAL RECORD COPY