Application for Amend to License NPF-74,changing Tech Specs to Support Cycle 3 Operation. Reload Analysis Rept for Palo Verde Nuclear Generating Station,Unit 3,Cycle 3 Encl
ML17305B373
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 02/21/1991
From: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17305B374 List:
References
161-03766-WFC-J, 161-3766-WFC-J, NUDOCS 9102280037
Download: ML17305B373 (7)


Text

ACCELERATED DISTtuBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9102280037 DOC.DATE: 91/02/21 NOTARIZED: YES DOCKET 4 FACIL:STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION CONWAY,W.F. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) R

SUBJECT:

Application for amend to License NPF-74,changing Tech Specs I to support Cycle 3 operation. "Reload Analysis Rept for Palo Verde Nuclear Generating Station, Unit 3,Cycle 3" encl. D DISTRIBUTION CODE: AOOID TITLE: OR COPIES RECEIVED:

Submittal: General Distribution R

g ENCL Q SI E:

NOTES:Standardized plant. 05000530 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD5 LA 1 1 PD5 PD 1 1 TRAMMELL,C 2 2 TRAMMELL,C. 2 2 INTERNAL: ACRS 6 6 NRR/DET/ECMB 9H 1 1 NRR/DET/ESGB 1 1 NRR/DOEA/OTSB11 1 1 NRR/DST 8E2 1 1 NRR/DST/SELB 8D 1 1 NRR/DST/SICB 7E 1 1 NRR/DST/SRXB 8E 1 1 NUDOCS-ABSTRACT 1 1 OC 1 0 OGC/HDS 1 1 0 G FILE 01 1 1 RES/DS IR/EIB 1 1 EXTERNAL NRC PDR 1 1 NSIC 1 1 I

D S

D D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR ~Qg ENCL

Arizona Public Service Company P.O. BOX 53999 ~ PHOENIX, ARIZONA850724999 WILLIAMF. CONWAY 161-03766-MFC/JRP EXECUTIVEVICEPRESIDENT NUCLEAR February 21, 1991 Docket No. STN 50-530 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station Pl-37 Washington, D. C. 20555

References:

1) APS letter Lo NRC (161-03587), dated November 13, 1990.
2) APS letter to NRC (161-02584), dated November 6, 1989.

Dear Sirs:

Sub) ect: Palo Verde Nuclear Generating Station (PVNGS)

Unit 3 Proposed Technical Specification Amendment Reload Cycle 3 File: 91-056-026; 91-005-419.5 Attached please find proposed changes to the PVNGS Unit 3 Technical Specifications. The proposed changes are necessary to support Cycle 3 operation of PVNGS Unit 3. The Reload Analysis Report (RAR) in support of Cycle 3 is enclosed as attachment 5. Reference 1 stated that the analyses contained therein would be used as input to the Unit 3, Cycle 3 RAR. Since the analyses in reference 1 have not been reviewed by the NRC Staff, APS has not used them as input for the Unit 3, Cycle 3 analyses. Subsequent to NRC approval of reference 1, APS will use the analyses contained therein as input for future reload analyses.

The proposed changes to the Technical Specifications in this amendment request and the methodology used to determine those changes are identical to those in the Unit 2, Cycle 3 reload submitted previously by reference 2, and as approved by the NRC on May 16, 1990.

This amendment matches the guidance concerning the application of standards for determining whether or not a significant hazards consideration exists as discussed in Federal Register dated March~6, 1986, titled "Final Procedures and Standards on No Significant Hazards Consideration." The amendment is identical to example (iii), a change resulting from a nuclear reactor core reloading.

For each of the proposed Technical Specification changes, the following information has been included within this amendment request:

A Description of the Technical Specification Amendment Request B Purpose of the Technical Specification C Need for the Techni.cal Specification Amendment D Basis for No Significant Hazards Consideration Determination E Safety Analysis for the Amendment Request F Environmental Impact Consideration Determination G Marked-up Technical Specification Change pages.

-91o22eoo37 91o2 53o PDR 'ADOCK 050

, P

)I

~ I N

t

161-03766-NFC/JRP February 21, 1991 Document Control Desk U. S. Nuclear Regulatory Commission Reload Cycle 3 Page Two'ursuant to 10CFR 50.91(b)(l) and by copy of this letter and attachments, APS has notified the Arizona Radiation Regulatory Agency of this request for a Technical Specification amendment.

Approval of this Technical Specification amendment request is required prior to Mode 5 entry. At the present, entry into Mode 5 is scheduled for April 29, 1991.

If you should have any questions concerning this request, please contact Michael E. Powell of my staff at (602) 340-4981.

Sincerely, WFC/JRP/mm Attachments cc: C. M. Trammell (all 'w/attachments)

J. B. Martin D. H. Coe C. F. Tedford A. C. Gehr A. H. Gutterman

16103766-than/JRP.

February 21, 1991 STATE OF ARIZONA )

) ss.

COUNTY OF MARICOPA )

I, W. F. Conway, represent that I am Executive Vice President Nuclear, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority to do so, that I have read such document and know its contents, and that to the best of my knowledge and belief, the statements made therein are true and correct.

W. F. Conway Sworn To Before Me This otl Day Of 1991.

Notary Public My Commission Expires My Commiuion Expires April G, 1991