From: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
161-03667-WFC-M, 161-3667-WFC-M, NUDOCS 9012280316
Download: ML17305B274 (14)


Text

ACCELERATED DI TRIBUTION DEMONST TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9012280316 DOC.DATE: 90/12/21 NOTARIZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION CONWAY,W.F.

Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards clarifications to NRC ATWS safety evaluation,per 900731 ltr re diverse auxiliary feedwater actuation sys-conceptual design 6 implementation schedule for 10CFR50.62 ATWS rule.

R D

DISTRIBUTION CODE:

A055D COPIES RECEIVED:LTR ENCL SIZE'ITLE:

OR/Licensing Submittal:

Salem ATWS Events GL-83-28 NOTES:STANDARDIZED PLANT Standardized plant.

Standardized plant.

A 05000528 05000529 D

05000530 D

RECIPIENT ID CODE/NAME PD5 LA TRAMMELL,C INTERNAL: ACRS NRR/DLPQ/LPEB10 NRR/DST/SICB 7E OC EG FILE 01 EXTERNAL: NRC PDR NOTES COPIES LTTR ENCL 1

0 2

2 6

6 1

0 1

1 1

0 1

1 1

1 1

1 RECIPIENT ID CODE/NAME'D5 PD TRAMMELL,C.

NRR/DEST/ESB 8D NRR/DOEA/OGCB11 NRR/DST/SPLB 8D OGC/HDS1 RES/DSIR/EIB NSIC COPIES LTTR ENCL 1

1 2,

2 1

1 1

0 1

0 1

0 1

1 1

1 R

D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOiVI Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 24 ENCL 18 A

D D

Arizona Public Service Company P.O. BOX 53999

~

PHOENIX. ARIZONA850724999 WILLIAMF. CONWAY EXECUTIVEVICEPRESIDENT NUCLEAR 161-03667-WFC/MEP/KLMC December 21, 1990 Docket Nos.

STN 50-528/529/530 Document Control Desk U.

S. 'Nuclear Regulatory Commission Mail Station Pl-37 Washington, D.

C.

20555

References:

1)

Letter from U.

S.

NRC to W. F.

Conway, APS, dated October 18, 1990.

Subject:

Compliance with the Anticipated Transients Without Scram (ATWS) Rule Palo Verde Nuclear Generating Station (PVNGS)

Unit Nos.

1, 2 and 3.

2)

Letter to U.

S.

NRC from W. F.

Conway, APS, dated July 31,1990.

Subject:

PVNGS Diverse Auxiliary Feedwater Actuation System

- Conceptual Design and Implementation Schedule for ATWS Rule, 10 CFR 50.62 (161-03369).

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2 and 3

PVNGS Response to NRC ATWS Safety Evaluation File: 90-056-026 Reference 1 provided Arizona Public Service Company (APS) with the Safety Evaluation for the Anticipated Transients Without Scram (ATWS) modifications necessary to meet the requirements of 10 CFR 50.62 (ATWS Rule).

The results of the staff's review concluded that the proposed

designs, for the Diverse Scram System (DSS),

Diverse Turbine Trip (DTT) and Diverse Auxiliary Feedwater Actuation System (DAFAS), conform to the requirements of 10 CFR 50.62, and are therefore acceptable.

However, the staff's conclusion is subject to a post-implementation inspection.

Also included in Reference 1 is a discussion concerning the implementation schedule for the Unit 3 DAFAS, which is currently scheduled to be implemented prior to restart from the third refueling outage.

The discussion stated that it is the staff's understanding that the modification required for DAFAS can be performed during a short term plant shutdown period and that APS should make a

best effort to implement the Unit 3 DAFAS as soon as possible.

The scope of the 9o12 OCK 05000528 280316 901221 pop ADO pDR P

l

,4 I,

1'61'-03667-WFC/MEP/KLMC December 21, 1990 Document Control 'Desk U. S.,Nuclear Regulatory Commission Page 2

DAFAS modification is complex and is currently scheduled for a

70 day construction and testing duration.

This implementation schedule is typically associated with planned refueling outages.

There'fore, the current schedule for the Unit 3

DAFAS implementation remains as prior to restart from the third refueling outage.

APS has reviewed the staff's Safety Evaluation, as provided in Reference 1,

and has a

number of clarifications.

The attachment to,this letter provides the details of these clarifications..

The clarifications include the significant changes to the DAFAS design from the conceptual

design, as previously. provided in Reference 2.

Figures 1 and 2 provide the DAFAS updated system diagram and hardware configuration, respectively.

If you have any questions concerning this matter.,

contact Mr. M.

E. Powell at (602) 340-4295.

Sincerely, WFC/MEP/KLMC Attachment Figures i

t

);

')

cc:

J.

B. 'Martin D. H.

Coe A. C. Gehr

,)

A. H. Gutterman

li II I

161-033667-WFC/MEP/KLHC December 21, 1990 ATTACHMENT APS CLARIFICATIONS TO NRC ATWS SAFETY EVALUATION Safet Evaluation P

9 Fourth Bullet "DAFAS will be blocked by the, Main Steam Isolation System (MSIS) and by the AFAS to prevent control and safety competing actions when AFW flow to a ruptured steam generator is terminated."

APS Clarification:

The purpose of the DAFAS block when an Auxiliary Feedwater Actuation Signal is present is to prevent the ATWS AOO system from interfering with the "smart" AFAS DBE rupture identification logic already present in the Palo Verde design.

Safet Evaluation

P.9 Seventh Bullet:

I "DAFAS will include-featur'es that provide alarms, plant computer data and other operator interfaces to indicate system status."

(

APS Clarification:

l The PVNGS final DAFAS design',will'provide features~<that'rovide alarms to indicate system status to the operators, but does not provide direct data points to the plant computer.

Safet Evaluation P

10 Section B

"The PVNGS 1,2,3 DAFAS design will use the existing safety related steam generator level instruments for the input signal and willsend an actuation signal to the existing safety related AFW system.

The DAFAS equipment will be diverse from that used in the Reactor Protection System (RPS) in that the DAFAS logic system will use a computer circuit board with solid state I/O modules while the RPS uses a bistable electro/mechanical system.

The DAFAS energizes to actuate and the RPS de-energizes to actuate.

The DAFAS interface with the AFW system will be through a relay which will not be used in the RPS.

This relay will be of a different manufacturer than that of the AFAS solid state relays."

4l J

l

~,

t 161-03667-WFC/MEP/KLMC December 21, 1990 APS Clarification:

The instrument sensor field bus power source for the DAFAS steam generator level transmitters is integrated with the sensor loop current to voltage converters.

It, is und'erstood'hese were excluded-from, the diversity requirements, since they, are technically part of the sensors, which are excluded from the diversity requirements of the ATWS Rule.

The current to voltage converter/sensor field bus

,power source is considered the "sensor output," and's therefore also>

excluded from the diversity requirements of the ATWS Rule.'he instrument channel components which process signals to the DAFAS and separately to. the RPS from this point are separate and diverse.

Also, in the fourth sentence, "through a relay" should be through an initiation rel'ay and in the fifth sentence "AFAS solid state relays" should be AFAS initiation relays.

Safet Evaluation P

10 Section C

Para ra h 1:

"Each channel of the DAFAS contains an uninterruptable power supply (UPS) which receives its power from 120 VAC vital buses.

The UPSs can supply the DAFAS for up to an hour upon the loss of offsite power."

APS Clarification:

The DAFAS conceptual design submitted to the NRC by APS letter, dated July 31, 1990 (161-03369),

included the use of UPS power sources.

The final

'DAFAS design includes a power source to the DAFAS and power supplies within the DAFAS similar to those used in the Diverse Scram System (DSS).

The Vital Instrument buses will provide power to the safety-related DAFAS cabinets.

Power supplies from a different manufacturer than the existing RPS will be used in the DAFAS.

Safet Evaluation P

.11 Section F

Para ra h 1:

When they are designed and implemented, it is the staff's understanding that they will be given a Human Factors review and will be in keeping with the licensee's Control Room Design Review process."

APS Clarification:

The Human Factors review referred to in this section is included as part of the normal design change process used at APS.

A stand alone human factors review, specifically for ATWS systems, is not required or planned.

il 41 f

1I W

r

FIGURE 1 DAFAS CHANNEL A SYSTEM DIAGRAM PROCESS CABINET Channel A Channel 8 Chonnol C Channel no SP.

no.

Tx Steam CeneratoI'ovols Steam Cenerolor Lovols I I I IIIJ ~

Sloarn Generator Lovols I ~ ~ Je IIJ Stoam Generator Love le I ~ IJ I ~I I;a.

SP.

r.o SP.

r,o KP r.o.

Tx r.o.

r.o.

DIVERSE SCRAM SYSTEM

.O..O.

Tx Tx r.o..o.

Tx Tx

.o r.o.

'Tx Tx

.O..o.

'lx Tx TO DAFAS

.O.

SP.

.O.

SP.

.O.

.0 SP.

SP.

.O.

SP.

.O.

SP.

.0 SP.

.O SP.

TO DAFAS

~e Auxiliary Relay Cabtnat A

Auxiliary Relay Cabinet 8

DAFAS A

.O.

.O.

nx hx r.o.

F.o.

nx nx r.o..o..o.

nx nx " nx PLC A1 PLC A2 r.o.

r.o.

r.o.

PLC At PLC A2 1/o 1/o Chas cls Chassis PLC Al PLC A2 1/o 1/o Chacsl ~

Chassis IWee ~e

~ ee Ia>> reao r.o.

IOII Oe 0

FOII Oll FOIJ Plant Annunciator 12/21/90

0 ek a,

i1

~

t+

t

]l C,g I

I

FIGURE 2 DAFAS HARDWARE CONFIGURATION Annunciator Contoct Analog Inputs DSS INPUTS (A,B.C,D)

DAFAS CHANNEL A 9

8 6

8 5

B 8

5 8

2 0

B 8

7 5

B 2

5 TEST AND STATUS PANEL 9

8 6

8 5

B B

8 8

8 2

5 0

B B

8 8

7 2

5 5

F.O.

F.O.

F.O.

Train A
ARC FO 24 VDC pwr Supply 24 VDC F.O.

Pwr Supply Train B

ARC 24 VDC Pwr Supply 24 VDC peer Supply 8

9 8

4.

Intorposing Iteloy Ponol Interposing Iteloy Ponal 8

9 8

Interposing It cloy Ponel 8

9 8

4.

Intorposlng Aeloy Ponal 12/21/90

II 41 E