ML17305B198

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-528/90-43,50-529/90-43 & 50-530/90-43 on 900917-21.Violations Noted
ML17305B198
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 11/06/1990
From: Scarano R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17305B199 List:
References
NUDOCS 9011270142
Download: ML17305B198 (5)


See also: IR 05000528/1990043

Text

~'pa

RECT Ip

+

0)9

'S

v~

+**+>>

UNITED STATES

NUCLEAR REGULATORY COIVIMISSION

REGION V

1450 MARIA LANE,SUITE 210

WALNUTCREEK, CALIFORNIA54596

NOV "6 1N

Docket Nos.

50-528,

50-529 and 50-530

Arizona Nuclear Power Project

P.O.

Box 52034

Phoenix,

Arizona

85072-2034

Attention:

Mr.

W.

F.

Conway

Executive Vice President

~ SUBJECT:

NRC INSPECTION OF

PALO VERDE UNITS 1,

2 AND 3

This letter refers to the routine inspection

conducted

by Messrs.

M. Cillis

and K.A. Miles of this office on September

17 through September

21, 1990, of

activities authorized

by NRC License

Nos.

NPF-41,

NPF-51 and NPF-74,

and to

the discussions

of our findings by Mr. Cillis with Mr.

W.

C.

Marsh and other

members of your staff at the conclusion of the inspection

on September

21,

1990.

Areas

examined during this inspection are described

in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

One violation of NRC requirements

was identified within the scope of this

inspection.

The violation is not being cited because

the criteria specified

in 10 CFR Part 2, Appendix C, Section

V.

G. of the Enforcement Policy were

satisfied.

Section

3 of the enclosed report describes

several

instances

in which known

deficiencies

have not been resolved in a timely manner.

We request that you

advise

us of your schedule

to address

the items discussed

in 3.A, 3.C,

and

3.D by December

17, 1990.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosure

will be placed in ihe

NRC Public Document

Room.

Should you have any questions

concerning this inspection,

we will be glad to

discuss

them with you.

Si

rely,

e

Ross

.

carano, Director

Division of Radiation Safety and

Safeguards

Enclosure:

Inspection Report Nos. 50-528/90-43,

50-529/90-43

and 50-530/90-43

pot i27O I."

O

O(-.II..I.>28

9q)g )Dl~

pod

QQQCK

<

pDC

0

it&

I

f

cc w/encl osure:

Hr. 0.

Mark DeMichele,

APS

NOV -6 i9>0

Hr. James

M. Levine,

APS

Hr. Jack

N. Bailey,

APS

Hr.

E.

C.

Simpson,

APS

Hr. Blaine

E. Ballard,

APS-

Hr.

Thomas

R. Bradish,

APS

Mr. Robert

W.

Page,

APS

Mr. Arthur C. Gehr,

Esq.,

Snell

8 Wilmer

Mr. Al Gutterman,

Newman

8 Holtzinger

P.

C.

Mr. Charles

R.

Kocher, Esq., Assistant Council,

SCE

Mr. James

A. Boeletto,

Esq.,

(same

address

as Hr. Kocher)

Hr. Charles

B. Brinkman, Combustion Engineering,

Inc.

Hr. Charles Tedford, Director, Arizona Radiation Regulatory Agency

'Chairman,

Maricopa County Board of Supervisors

Mr. John

W.

Norman, Chief, Arizona Corporation

Commission

HOV - 6

1990

bcc w/enclosure:

Project Inspector

Resident

Inspector

docket file

G.

Cook

B. Faulkenberry

J. Martin

bcc w/o enclosure:

M. Smith

J. Zollicoffer

REGION V

~ KMi les

r>/~/9O

Ju C.

MC) 1 1 is

/j /g/90

GYuhas

o /g /90

AJoh

on

ri/g-!9O

RSc

ano

Zj /8/9O

ES /

NO

YES'

NO

/

NO

YES /

NO

YES /

N

]

S

ES /

NO

]

t

T

r

I