ACCELERATED DISTRIBUTION DEMONSTFMTION SYSTEM
REGULATORY 1NFORMATION DISTRIBUTION SYSTEM
(RIDS)
CCESSION NBR:9006260273
DOC.DATE: 90/06/08
NOTARIZED:
NO
DOCKET
FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi
05000528
STN-50-529
Palo Verde Nuclear Station,
Unit 2, Arizona Publi
05000529
STN-50-530 Palo Verde Nuclear Station,
Unit 3, Arizona Publi
05000530
AUTH.NAME
AUTHOR AFFILIATION
KIRSCH,D.F.
Region
5, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
CONWAY,W.F.
Arizona Public Service
Co.
(formerly Arizona Nuclear
Power
SUBJECT:
Forwards
Insp Repts 50-528/90-16,50-529/90-16
6 50-530/90-16
on 900514-18.No
noncompliances
or deviations
noted.
DISTRIBUTION CODE:
IE42D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: Operator Licensing Examination Reports
NOTES: Standardized
plant.
Standardized
plant.
05000528
05000529
05000530
RECIPIENT
ID CODE/NAME
PD5
CHAN,T
INTERNAL: ACRS
NRR SHANKMAN,S
NRR/DLPQ/LOLB10
RGN5
FILE
01
EXTERNAL: LPDR
NOTES:
COPIES
LTTR ENCL
1
1
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
,ID CODE/NAME
PETERSON,S.
AEOD/DSP/TPAB
D
FB11
NRC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK,
ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION
LISTS FOR DOCUMENTS YOU DON'T NEED!
OTAL NUMBER OF COPIES
REQUIRED:
LTTR
15
ENCL
15
fs
l
l
I'
l
I
t
1P,S REGy~1p
+
0
>+A,
l
IIA
O
o"
+~ +***+
UNITED STATES
NUCLEAR REGULATORY COIVIMISSION
REGION V
1450 MARIALANE,SUITE 210
WALNUTCREEK, CALIFORNIA94596
JUN-8
>sso
Docket Nos.
50-528,
50-529,
50-530
Arizona Nuclear Power Project
P. 0.
Box 52034
Phoenix, Arizona 85072-2034
Attention: Mr. W. F.
Conway
Executive Vice President,
Nuclear
Gentlemen:
SUBJECT:
NRC
INSPECTION OF
PALO VERDE UNITS I, 2,
AND 3
This letter refers to the inspection
by Messrs.
G. Johnston,
D. Pereira,
J. Sloan,
B. Brett,
and Ms.
M. Thompson of this office conducted
from
May 14,
1990 through
May 18,
1990, of activities authorized
by
NRC License
Nos.
and NPF-74,
and to the discussion of findings held
with your staff at the conclusion of the inspection.
Areas examined, in this inspection
are described
in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspectors.
Our inspection of your training program indicates that
some progress
has
been
made in implementing
a Systems
Approach to Training.
Your efforts to
implement this approach
should continue,
as there are still substantial
improvements
needed.
The current status of the simulator upgrade project schedule
has
had
some
slippage.
It appears
that this slippage
has
reduced
the schedule float time.
If the schedule is allowed to slip significantly it could have
a serious
impact on the training and qualification of your licensed operators.
Your
close attention to this concern is warranted
due to the potential
impact it
would have
on your licensed operator training program
and the certification
of the simulator due in May 1991,
due to the potential
postponement
of
operator simulator requalification training beyond
March 1991.
At the Exit Interview, you committed to review your licensed operator medical
records to ensure that all licensed operators
had
been medically examined at
the required frequency.
You also committed to review your licensed operator
requalification records to ensure that no operator
who had failed his annual
operating test
was returned to licensed shift duties prior to passing
an annual
operating test.
Please
advise this office of the results of these
reviews
when they are completed.
In accordance
with 10
CFR 2.790(a),
a copy of the letter and the enclosure
will be placed in the
HRC Public Document
Room.
The response
required
by this letter is not subject to the clearance
procedure
of the Office of Management
and Budget
as required
by the Paperwork
Reduction
Act of 1980,
PL 96-511.
Should you have
any questions
concerning this inspection,
we will,.be pleased
to discuss
them with you.
Sincerely,
Dennis
F.
irsch, Chief
Reactor Safety Branch
Enclosure:
Inspection
Report
Nos. 50-528/90-16,
50-529/90-16,
50-530/90-16
cc w/enclosure:
Mr. Jack
N. Bailey,
Mr. Blaine
E. Ballard,
Mr. Thomas
R. Bradish,
Nr. 0. Mark DeMichele,
Mr. James
M. Levine,
Mr. Robert
W. Page,
Mr. E.
C. Simpson,
Mr. Arthur C. Gehr, Esq., Snell
8 Wilmer
Mr. Algutterman,
Newman
5 Holtzinger P.C.
Nr. Charles
R. Kocher, Esq., Assistant Council,
SCE Company
Mr. James
A. Boeletto, Esq.,
Company
Nr. Charles
B. Brinkman, Combustion Engineering,
Inc.
Mr. Charles
Tedfor d, Director, Arizona Radiation Regulatory Agency
Chairman,
Maricopa County Board of Supervisors
Nr. John
W. Norman, Chief, Arizona Corporation
Commission
JUN - 8
iggg
bcc w/enclosure:
Mr. R.
Zimmerman,
RV
Mr. A. Chaffee,
RV
Resident
Inspector
(PV)
Project Inspector,
RV
M. Smith,
RV
J. Zollicoffer, RV
Docket File
0
S
C
PY
R
S
COPY
REEVES
Y
YES /
NO
ES /
NO
YES /
0
JOHNSTON
LMILLER
KIRSCH
6/ 7/90
6/
/90
6/
/90
ND
YES /
NO
j