ML17305A756

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Apr 1990 for Palo Verde Nuclear Generating Station Units 1,2 & 3
ML17305A756
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/30/1990
From: James M. Levine, Porter K
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
254-00888-JML-K, 254-888-JML-K, NUDOCS 9005160001
Download: ML17305A756 (34)


Text

ACCELERATED ISTRIBUTION DEMON TPWTION SYSTEM

', ~ 4 DOCKET xx 05000528 05000529 05000530 REGULATORY INFORMATION DXSTRIBUTION SYSTEM (RIDS)

FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi AUTH.NAME AUTHOR AFFILIATION PORTER,K.F.

Arizona Public Service Co.

(formerly Arizona Nuclear Power LEVINE,J.M.

Arizona Public Service Co.

(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION R

SUBJECT:

Monthly operating repts for Apr 199 alo Verde Nuclear Generating Station Units 1,2 6 3. /9 0511 tr.

DISTRIBUTXON CODE:

IE24D COPIES RECEIVED:LTR + ENCL g SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

D NOTES: Standardized plant.

Standardized plant.

05000528 A

05000529 05000530 RECIPIENT ID CODE/NAME PD5 LA PETERSON,S.

INTERNAL: ACRS AEOD/DSP/TPAB N

EB10 RE FI 01 EXTERNAL: EG&G STUART,V.A NRC PDR NOTES COPXES LTTR ENCL 3

3 1

1 10 10 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD5 PD CHAN,T AEOD/DOA IRM TECH ADV NRR/DOEA/OEAB11 RGN5 LPDR NSIC COPXES LTTR ENCL 1

1 1

1 1

1 2

2 1

1 1

1 1

1 1

1 D

R, D

NOTE TO ALL"RIDS" RECIPIENTS:

A D

D PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM PI-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LINIS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED:

LTTR 29 ENCL 29

0 M

0

~ I J

J 4

Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O. BOX 52034

~

PHOENIX, ARIZONA85072-2034 254-00888-JML/KFP May 11, 1990 Docket; Nos.

STN 50-528/529/530 Document Control Desk U. S. Nuclear Regulatory Commission Mail Station P1-37 washington, D.C.

20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3

Monthly Operating Reports for April 1990 File:

90-024-404/90-056-026 Attached are the Monthly Operating Reports for April 1990 prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A

(Technical Specifications) to the Palo Verde Nuclear Generating

Station, Units 1,

2, and 3

Operating Licenses.

By copy of this letter, we are also forwarding the Monthly Operating Reports to the Regional Administrator of the Region V Office.

Zf you have any questions, please contact Mr. K. F. Porter, at (602) 340-4187.

Very truly yours, J.

M. Levine ice President Nuclear Production JML/KFP Attachments cc:

T. L. Chan (all w/attachments)

J.

B. Martin D. H.

Coe ZNPO Records Center 9005160001 happ+>0 RF'DR ADOCg 05000528 PDC-mEP9

~ls

0

~

NRC MONTHLY OPERATING REPORT DOCKET NO.

50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K F Porter OPERATING STATUS l.

2.

3.

4.

5.

6.

7

~

8.

9.

10.

Unit Name:

Palo Verde Nuclear Generatin Station Unit 1 Reporting Period:

A ril 1990 Licensed Thermal Power (MWt):

3800 Nameplate Rating (Gross MWe):

1403 Design Electrical Rating (Net MWe):

~12 0

Maximum Dependable Capacity (Gross MWe): 1303 Maximum Dependable Capacity (Net MWe):

~122 If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)

Since Last Report, Give Reasons:

N A Power Level to Which Restricted, If Any (Net MWe):

one Reasons For Restrictions, If Any:

N A 11.

12.

13.

14.

15.

16.

17.

19.

20.

21.

22.

23.

24.

Hours in Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate Shutdowns Scheduled Over Next 6

N A This Month 20 Yr.-to-Date 2 880 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Months (Type, Date and Duration of Each):

Cumulative 3

296 1

262 1

0 0 16 826 9

0 0 60 931 221 21 163 100 19 93 190 45 1

45 1

43 5

41 8

28 1

25.

If Shutdown At End of Report Period, Estimated Date of Start-up:

June 04 1990 INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Forecast

~085

~06 85 11 85 Achieved

~05 25 8

06 10 85 01 28 86 1

t+

I 1

l 1<

've 1

t

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-528 IRK=

DATE "K

MONTH'PRIL 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 17 18 19 20 21 22 23 24 25 10 26 27 12 28 13 29 30 15 16

~ 0

REFUELING INFORMATION DOCKET NO.

50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K F Porter 1.

Scheduled date for next refueling shutdown.

01/04/92, 3rd refueling.

2.

Scheduled date for restart following refueling.

04/09/92 3.

Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendments To be determined.

4.

Scheduled date for submitting proposed licensing action and supporting information.

To be determined.

5.

Important Licensing considerations associated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

To be determined.

6.

The number of fuel assemblies.

a)

In the core.

241 b)

In the spent fuel storage pool.

188 7.

Licensed spent fuel storage capacity.

1329 Intended change in spent fuel storage capacity.

None 8.

Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2004 (18 Month reloads and full core discharge capability).

3

pt hl

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.

50-528 DATE K

A ril 1990 04/01 04/17 04/18 04/30 00'00 04:26 15:40 24:00 Unit began the month in Mode 5, 2nd Refueling Outage.

Unit entered Mode 4.

Unit entered Mode 3.

Unit ended the month in Mode 3, 2nd Refueling Outage.

4

~

~

C I[

SHUTDOWNS AND POWER REDUCTIONS DOCKET NO 50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K F Porter Method of Duration Shutting System No.

Date Type Hours Reason Down Reactor LER No.

Code Cause and Corrective Component Action to Code Prevent Recurrence 89/03 04/08/89 S

720 N/A N/A N/A Continuation of 2nd refueling outage.

F-Forced S-Scheduled Reason:

A-Equipment Failure(Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error H-Other (Explain) 3Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20% or Greater in the Past 24 Hours 9-Other-(Explain)

Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)

Exhibit H-Same Source 5

I

/t I,

V~I I

I

NRC MONTHLY OPERATING REPORT DOCKET NO.

50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K F Porter OPERATING STATUS l.

2.

3 ~

4, 5.

6.

7.

8.

Unit Name:

alo Verde Nuclear Generatin Station Unit 2 I

Licensed Thermal Power (MWt):

3800 Nameplate Rating (Gross MWe):

1403 Design Electrical Rating (Net MWe):

~12 0 Maximum Dependable Capacity (Gross MWe): 1303 Maximum Dependable Capacity (Net MWe):

1221 If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)

Since Last Report, Give Reasons:

N A 9.

Power Level to Which Restricted, If Any (Net MWe):

None 10.

Reasons For Restrictions, If Any:

A 11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

Hours in Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate Shutdowns Scheduled Over Next 6

N A This Month 20 Yr.-to-Date 2 880 0 0 0 0 0 0 0 0 1 295 0

0 0 1 295 0

0 0 480 00 0 0 0 0 1

12 500 1 624 008 45 0

45 0 0 0 46 2

Months (Type, Date and Duration of Each):

Cumulative 31 680 0 546 1

0 0 20 042 2

0 0 3 499 053 25 682 3 0 24 006 820 63 3

63 3

62 1

59 9

9

25. If Shutdown At End of Report Period, Estimated Date of Start-up:

June 12 1990 INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Forecast

~03 86 06 86

~11 86 Achieved

~04 18 86 05/320 86 08/91/8 6 6

(,>>

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.

50-529 DATE K

MONTH:

APRIL 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 17 18 19 20 21 22 23 25 10 26 27 0

12 28 13 29 14 30 15 16

f If

REFUELING INFORMATION DOCKET NO.

50-529 UNIT NAME PVNGS-2 DATE "K

1.

Scheduled date for next refueling shutdown.

09/15/91, 3rd refueling.

2.

Scheduled date for restart following refueling.

12/19/91 Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendments To be determined.

4.

Scheduled date for submitting proposed licensing action and supporting information.

To be determined.

5.

Important Licensing considerations associated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

6.

To be determined.

The number of fuel assemblies.

a)

In the core.

241 b)

In the spent fuel storage pool.

204 7.

Licensed spent fuel storage capacity.

1329 Intended change in spent fuel storage capacity.

None Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2004 (18 Month reloads and full core discharge capability).

8

P J

ll i',

)

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.

50-529 mL-DATE COMPLETED BY K F Porter 04/01 04/30 00'00 24:00 Unit began the month defueled, 2nd Refueling Outage.

Unit ended the month defueled, 2nd Refueling Outage.

9

1 I

j

SHUTDOWNS AND POWER REDUCTIONS DOCKET NO 50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K.F. Porter No.

Method of Duration Shutting System Date Type Hours Reason Down Reactor LER No.

Code Cause and Corrective Component Action to Code Prevent Recurrence 90/01 02/23/90 S

720 N/A N/A N/A Continuation of 2nd Refueling Outage.

F-Forced S-Scheduled Reason:

A-Equipment Failure(Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error H-Other (Explain)

Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20% or Greater in the Past 24 Hours 9-Other-(Explain)

Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)

Exhibit H-Same Source 10-

M r',

t ljl

NRC MONTHLY OPERATING REPORT DOCKET NO.

50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K F Porter OPERATING STATUS l.

2.

3.

4.

5.

6.

7.

8.

9.

10 Unit Name:

Palo Verde Nuclear Generatin Station Unit 3 Reporting Period:

A ril 1990 Licensed Thermal Power (MWt):

3800 Nameplate Rating (Gross MWe):

1403 Design Electrical Rating (Net MWe):

~12 Maximum Dependable Capacity (Gross MWe): 1303 Maximum Dependable Capacity (Net MWe):

1221 If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)

Since Last Report, Give Reasons:

N A Power Level to Which Restricted, If Any (Net MWe):

None Reasons For Restrictions, If Any:

A 11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

Hours in Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate Shutdowns Scheduled Over Next 6 N A This Month 20 Yr.-to-Date 2 880 59 2

0 0 5

1 0 0 349 2

0 0 2 250 0 0 1 998 329 550 093 691 800 643 188 80 2

80 2

2 645 200 2 461 316 8

1 8

1 3

2 0 0 Months (Type, Date and Duration of Each):

Cumulative 20 256 11 60 4 0 0 11 524 7

0 0 41 960 484 14 13 000 13 824 81 56 9a 56 9

55 9

53 12 1

25. If Shutdown At End of Report Period, Estimated Date of Start-up:

N A INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Forecast

~08 0778D 09 8

Achieved

~10 2~58

~11 2~88

~01 08 88 11-

N I

'd

AVERAGE DAILYUNIT POWER LEVEL 1=

DATE COMPLETED BY K F Porter MONTH:

APRIL 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1266 17 126 18 1266 19 1266 20 189 1267 21 6

6 1264 22 1090 1264 23 1089 1265 24 1092 1266 25 1093 10 126 26 1094 1265 27 1092 12 1263 28 598 13 1264 29 1208 14 136 30 1260 15 16 12

f II lt

,i~

1

REFUELING INFORMATION DOCKET NO.

50-530 UNIT NAME PVNGS-3 DATE K

1.

Scheduled date for next refueling shutdown.

2.

03/16/91, 2nd refueling.

Scheduled date for restart following refueling.

06/19/91 3.

Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendments 4,

To be determined.

Scheduled date for submitting proposed licensing action and supporting information.

To be determined.

5.

Important Licensing considerations associated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

6.

To be determined.

The number of fuel assemblies.

a)

In the core.

241 b)

In the spent fuel storage pool.

104 7.

Licensed spent fuel storage capacity.

1329 Intended change in spent fuel storage capacity.

None Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2005 (18 Month reloads and full core discharge capability).

13

I I

K rt

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.

50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K F Porter A ril 1990 04/01 04/13 04/14 04/19 04/19 04/20 04/21 04/28 04/29 04/30 00:00 22:22 03:58 06:49 15:30 02:50 22:00 01:29 05:49 24:00 Unit began the month in Mode 1, 100%

RX power.

Unit down powered to 80% for control rod testing.

RX trip from 81.5%

due to a dropped rod. Unit entered Mode 3.

Unit entered Mode 2.

Unit entered Mode 1.

Main generator synchronized to the grid.

RX power increase stopped at 90% for repair of HP Heaters 5B and 6B.

Unit commenced power down to 50$ to valve in HP Heater Train "B".

Unit reached 100%

RX power.

Unit ended the month in Mode 1, 100%

RX power.

14-

f Dt I

SHUTDOWNS AND POWER REDUCTIONS DOCKET NO 50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K.F Porter Method of Duration Shutting System No.

Date Type Hours Reason Down Reactor LER No.

Code Cause and Corrective Component Action to Code Prevent Recurrence 90/04 04/13/90 S

90/05 04/14/90 F

N/A 142.9 A

N/A N/Av N/A N/Av N/A Power decrease for control rod testing.

N/Av RX trip due to a

dropped control rod.

90/06 04/21/90 S

N/A N/A N/A N/A Power held at 90% due to repair of the HP Heater Train "B" Heaters.

90/07 04/28/90 S

N/A N/A N/A N/A RX power reduced to 50% to place HP Heater Train "B" back in service.

F-Forced S-Scheduled Reason:

A-Equipment Failure(Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error H-Other (Explain)

Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20% or Greater in the Past 24 Hours 9-Other-(Explain)

Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)

Exhibit H-Same Source

- 15

0