ML17305A699

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Mar 1990 for Palo Verde Nuclear Generating Station Units 1,2 & 3.W/900417 Ltr
ML17305A699
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/31/1990
From: James M. Levine, Porter K
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
254-00833-JML-K, 254-833-JML-K, NUDOCS 9004230628
Download: ML17305A699 (34)


Text

ACCELERATED DISHUBUTION DEMONSHRATION SYNi EM 0

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9004230628 DOC.DAT 1 NOTARIZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION PORTER,K.F. Arizona Public Service Co. (formerly Arizona Nu'clear Power R LEVINE,J.M. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Monthly operating repts for Mar

SUBJECT:

Generating Station Units 1,2 3.W/900417 llor. Verde Nuclear DISTRIBUTION CODE: IE24D COPIES RECEIV MLgg E. CL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES: 05000528 Standardized plant.

Standardized plant. 05000529'5000530 D

t RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 8 PD5 LA ,3 3 PD5 PD 1 1 PETERSON,S. 1 1 CHAN,T 1 1 INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DS P/TPAB 1 1 IRM TECH ADV 2 2 NRR/DLPQ/LPEB10 1 1 NRR/DOEA OEABll 1 1 NUDOCS-ABSTRACT 1 1 G 1 1 RGN5 1 1 EXTERNAL: EG&G STUART,V.A 1 1 LPDR 1 1 NRC PDR 1 1 NSIC

-R NOTES: 1 1 "D

'D NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASIEI CONTACT THE, DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION FOR DOCUMENTS YOU DON'T NEEDI 'INIS TOTAL NUMBER OF COPIES REQUIRED: LTTR 30 ENCL 30

~ e Arizona Public Service Company PO. BOX 53999 ~ PHOENIX, ARIZONA 850724999 254-00833-JML/KFP April 17, 1990 Docket Nos. STN 50-528/529/530 Document Control Desk U. S. Nuclear Regulatory Commission Mail Station P1-37 Washington, D.C. 20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Monthly Operating Reports for March 1990 File: 90-024-404/90-056-026 Attached are the Monthly Operating Reports for March 1990 prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Operating Licenses. By copy of this letter, we are also forwarding the Monthly Operating Reports to the Regional Administrator of the Region V Office.

If you have any questions, at (602) 340-4187.

please contact Mr. K. F. Porter, Very truly yours, M. Levine ice President Nuclear Production JML/KFP Attachments cc: T. L. Chan (all w/attachments)

J. B. Martin D. H. Coe INPO Records Center 900423062 ~

PDR ADO 90033~

R

+8 4+

~

O~OOO~2~

PDC I

II

0' t 4 I t

[,

II II

0 NRC MONTHLY OPERATING REPORT DOCKET NO. 50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K F Porter OPERATING STATUS

1. Unit Name: Palo Verde Nuclear Generatin Station Unit 1
2. Reporting Period: March 1990
3. Licensed Thermal Power (MWt): 3800 4, Nameplate Rating (Gross MWe): 1403

.5. Design Electrical Rating (Net MWe): 1270

6. Maximum Dependable Capacity (Gross MWe): 1303
7. Maximum Dependable Capacity (Net MWe): ~122
8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons: N A

9. Power Level to Which Restricted, If Any (Net MWe): None
10. Reasons For Restrictions, If Any: N A This Month Yr.-to-Date Cumulative
11. Hours in Reporting Period 44 2 160 36 576
12. Number of Hours Reactor Was Critical 0 0 0 0 17 262.1
13. Reactor Reserve Shutdown Hours 0 0 0 0 0.0
14. Hours Generator On-Line 0 0 0 0 16 826 9
15. Unit Reserve Shutdown Hours 0 0 0 0 0 0
16. Gross Thermal Energy Generated (MWH) 60 931 221
17. Gross Electrical Energy Generated (MWH) 21 163 100
18. Net Electrical Energy Generated (MWH) 19 793 190
19. Unit Service Factor 0 0 0 0 46 0%
20. Unit Availability Factor 0.0a 0.0 46.0
21. Unit Capacity Factor (Using MDC Net) 0 0 0.0a 44 3 22 Unit Capacity Factor (Using DER Net) 42 6a 23 Unit Forced Outage Rate 0 Os 28 1 s Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

'f 24 N A 25 Shutdown At End of Report Period, Estimated Date of Start-up:

Ma 02 1990 Forecast Achieved INITIAL CRITICALITY ~05 85 05/525 85 INITIAL ELECTRICITY 06 85 06 10 85 COMMERCIAL OPERATION ll 85 01 28 86 1

I 1

I h

h f,

I

~ ~

\

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K F Porter MONTH: MARCH 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 17 18 19 20 21 22 23 24 25 10 26 27 12 28 13 29 14 30 15 31 16 2

~O l

I

REFUELING INFORMATION DOCKET NO. 50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K F Porter

1. Scheduled date for next refueling shutdown.

01/04/92, 3rd refueling.

2. Scheduled date for restart following refueling.

04/07/92

3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment'P To be determined.
4. Scheduled date for submitting proposed licensing action and supporting information.

To be determined.

5. Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

To be determined.

6. The number of fuel assemblies.

a) In the core. 241 b) In. the spent fuel storage pool. 188

7. Licensed spent fuel storage capacity. 1329 Intended change in spent fuel storage capacity. None
8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2004 (18 Month reloads and full core discharge capability).

3

I 4 14 yl I

1 1

I 4

1

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K F Porter March 1990 03/01 00'00 Unit began the month in Mode 5, 2nd Refueling Outage.

03/31 24:00 Unit ended the month in Mode 5, 2nd Refueling Outage.

4

SHUTDOWNS AND POWER REDUCTIONS DOCKET NO 50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K.F. Porter Method of Cause and Corrective Duration Shutting System Component Action to No. Date Type Hours Reason Down Reactor LER No. Code Code Prevent Recurrence 89/03 04/08/89 S 744 N/A N/A N/A Continuation of 2nd refueling'utage.

1F-Forced Reason: 3Method: Exhibit F-Instructions S-Scheduled A-Equipment Failure(Explain) 1-Manual for Preparation of the Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation from (NUREG 0161)

E-Operator Training 6 License Previous Month Examination 5-Reduction of 20% or F-Administrative Greater in the Past Exhibit H-Same Source G-Operational Error 24 Hours H-Other (Explain) 9-Other-(Explain) 5

~j t

1 k

f

(

NRC MONTHLY OPERATING REPORT DOCKET NO. 50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K F Porter OPERATING STATUS

l. Unit Name: Palo Verde Nuclear Generatin Station Unit 2
2. Reporting Period: March 1990
3. Licensed Thermal Power (MWt): 3800
4. Nameplate Rating (Gross MWe): 1403
5. Design Electrical Rating (Net MWe): 1270
6. Maximum Dependable Capacity (Gross MWe): 1303
7. Maximum Dependable Capacity (Net MWe): 1221
8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons: N A

9. Power Level to Which Restricted, If Any (Net MWe): None
10. Reasons For Restrictions, If Any: N A This Month Yr.-to-Date Cumulative
11. Hours in Reporting Period 744 2 160 30 960
12. Number of Hours Reactor Was Critical 0 0 1 295 0 20 546 1
13. Reactor Reserve Shutdown Hours 0 0 0.0 0 0
14. Hours Generator On-Line 0 0 1 295 0 20 042 2
15. Unit Reserve Shutdown Hours 0.0 0 0 0 0
16. Gross Thermal Energy Generated (MWH) 0 4 8 0 700 3 499 053
17. Gross Electrical Energy Generated (MWH) 0 25 682 3 0
18. Net Electrical Energy Generated (MWH) 0 1 624 008 24 006 820 19 Unit Service Factor 0.0% 64 7 20 Unit Availability Factor 0.0 64.7 21 Unit Capacity Factor (Using MDC Net) 0.0s 63 5a 22 Unit Capacity Factor (Using DER Net) 61 1%

23 Unit Forced Outage Rate 0 Os 9 9 24 Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

N A 25 If Shutdown At End of Report Period, Estimated Date of Start-up:

June 09 1990 Forecast Achieved INITIAL CRITICALITY ~03 86 ~04 18 86 INITIAL ELECTRICITY ~06 86 05 20 86 COMMERCIAL OPERATION 11 86 09 19 86 6

I r

I

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K F Porter MONTH: MARCH 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 17 18 19 20 21 22 23 24 25 10 26 27 12 28 13 29 14 30 15 16 7

V ~

REFUELING INFORMATION DOCKET NO. 50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K F Porter

1. Scheduled date for next refueling shutdown.

09/15/91, 3rd refueling.

2. Scheduled date for restart following refueling.

12/19/91

3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

To be determined.

4. Scheduled date for submitting proposed licensing action and supporting information.

To be determined.

5. Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

To be determined.

6. The number of fuel assemblies.

a) In the core. 241 b) In the spent fuel storage pool. 204

7. Licensed spent fuel storage capacity. 1329 Intended change in spent'uel storage capacity. None
8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2004 (18 Month reloads and full core discharge capability).

8

I t

1 I

t

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K F Porter March 1990 03/01 00:00 Unit began the month in Mode 5, 2nd Refueling Outage.

03/11 03:34 Unit entered Mode 6.

03/22 14:12 Last fuel bundle removed from core. Unit is defueled.

03/31 24:00 Unit ended the month defueled.

9

C SHUTDOWNS AND POWER REDUCTIONS DOCKET NO 50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K.F. Porter Method of Cause and Corrective Duration Shutting System Component Action to No. Date Type Hours Reason Down Reactor LER No. Code Code Prevent Recurrence 90/01 02/23/90 S 744 N/A N/A N/A Continuation 2nd Refueling Outage.

1F-Forced Reason: Method: Exhibit F-Instructions S-Scheduled A-Equipment Failure(Explain) 1-Manual for Preparation of the Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation from (NUREG 0161)

E-Operator Training & License Previous Month Examination 5-Reduction of 20% or F-Administrative Greater in the Past Exhibit H-Same Source G-Operational Error 24 Hours H-Other (Explain) 9-Other-(Explain) 10

NRC MONTHLY OPERATING REPORT DOCKET NO. 50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K F Porter OPERATING STATUS

l. Unit Name: Palo Verde Nuclear Generatin Station Unit 3
2. Reporting Period: March 1990
3. Licensed Thermal Power (MWt): 3800
4. Nameplate Rating (Gross MWe): 1403
5. Design Electrical Rating (Net MWe): 1270 6 ~ Maximum Dependable Capacity (Gross MWe): 1303
7. Maximum Dependable Capacity (Net MWe): 1221
8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons: A

9. Power Level to Which Restricted, If Any (Net MWe): None
10. Reasons For Restrictions, If Any: A This Month Yr.-to-Date Cumulative
11. Hours in Reporting Period 744 2 160 19 536
12. Number of Hours Reactor Was Critical 744 0 1 752 0 0 0 ll 0.0 163 2
13. Reactor Reserve Shutdown Hours 0 0
14. Hours Generator On-Line 744 0 1 673 6 10 947 6
15. Unit Reserve Shutdown Hours 0.0 0 0 0 0 16 Gross Thermal Energy Generated (MWH) 2 94 286 5 551 764 39 962 155 Gross Electrical Energy

'7.

Generated (MWH) 991 000 1 953 400 14 021 200

18. Net Electrical Energy Generated (MWH) 939 009 1 818 128 13 181 593
19. Unit Service Factor 100 0 77 5a
20. Unit Availability Factor 100 0 56 0%
21. Unit Capacity Factor (Using MDC Net) 103 4 68 9 55.3a
22. Unit Capacity Factor (Using DER Net) 99.4s 53.1%
23. Unit Forced Outage Rate 11.7%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

N A

25. If Shutdown At End of Report Period, Estimated Date of Start-up:

N A Forecast Achieved INITIAL CRITICALITY ~07 87 ~10 25 87 INITIAL ELECTRICITY 077D8 ~11 2~88 COMMERCIAL OPERATION 09 8 01/108 88 11-

r l

I

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K F Porter MONTH MARCH 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1249 17 12 1231 18 12 5 1255 19 12 2 1252 20 1269 1253 21 12 2 1255 22 1271 1254 23 12 2 1255 24 1267 1257 25 1270 10 1272 26 1272 1255 27 1269 12 1264 28 1270 13 1276 29 12 3 14 12 7 30 12 4 15 1276 31 1271 16 1242

y N

II I

REFUELING INFORMATION DOCKET NO. 50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K F Porter

1. Scheduled date for next refueling shutdown.

03/16/91, 2nd refueling.

2. Scheduled date for restart following refueling.

06/20/91

3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment2 To be determined.
4. Scheduled date for submitting proposed licensing action and supporting information.

To be determined.

5. Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

To be determined.

6. The number of fuel assemblies.

a) In the core. 241 b) In the spent fuel storage pool. 104

7. Licensed spent fuel storage capacity. 1329 Intended change in spent fuel storage capacity. None Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2005 (18 Month reloads and full core discharge capability).

13

r

(

t t

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K.F Porter March 1990 03/01 00:00 Unit began the month in Mode 1, 98% RX powers Evaluation of secondary system performance continued.

03/09 17:47 Evaluation of secondary system performance completed. RX power increased to 100%.

03/31 24:00 Unit ended the month in Mode 1, 100% power.

14-

I SHUTDOWNS AND POWER REDUCTIONS DOCKET NO 50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K.F. Porter Method of Cause and Corrective Duration Shutting System Component Action to No. Date Type Hours Reason Down Reactor LER No. Code Code Prevent Recurrence No outages or power reductions of greater than 20% occurred during the month.

1F- Forced Reason: Method: Exhibit F-Instructions S-Scheduled A-Equipment Failure(Explain) 1-Manual for Preparation of the Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation from (NUREG 0161)

E-Operator Training & License Previous Month Examination 5-Reduction of 20% or F-Administrative Greater in the Past Exhibit H-Same Source G-Operational Error 24 Hours H-Other (Explain) 9-Other-(Explain)

- 15

\

0 e ig

.t fl, J