Provides Updated Status of Actions to Upgrade Emergency Operating Procedures
ML17305A629
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/21/1990
From: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-NUREG-1358 102-01641-WFC-T, 102-1641-WFC-T, NUDOCS 9004060342
Download: ML17305A629 (8)


Text

ACCELERATED DISTIIXBUTION DEMONSTFWTION SYSTEM

~ ~

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9004060342 DOC-DATE: 90/03/21 NOTARIZED- NO DOCKET I FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION CONWAY,W.F. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Provides updated status of actions to upgrade emergency D operating procedures.

DISTRIBUTION CODE: A003D COPIES RECEIVED:LTR TITLE: OR/Licensing Submittal: Suppl 1 Q ENCL 0 SIZE:

to NUREG-0737(Generic Ltr 82-33) 8

/

NOTES: 05000528 Standardized plant. 05000529 Standardized plant. 05000530 D

RECIPIENT COPIES RECIPIENT COPIES D ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA PD5 PD PETERSON,S.

INTERNAL:, NRR/DLPQ/LHFB11 BSTRACT OC/LFMB REG FIL 01 RES/DSIR/EIB EXTERNAL: LPDR NRC PDR NSIC NOTES D

8

/

A D,

D NOTE TO ALL "RIDS" RECIPIENTS:

S PLEASE HELP US TO REDUCE WASTEl CONTACT THE JX)CUMENT CONTROL DESK, ROOM PI-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISIRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR 18 ENCL

I Qt ~5 r

f I i

<<l

Arizona Public Service Company P.O. 8OX 53999 ~ PHOENIX, ARIZONA 85072<999 WILLIAMF. CONWAY 102-01641-WFC/TRB/SBJ EXECUTIVEVICE PRESIDENT NUCLEAR March 21, 1990 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Reference:

A) Letter from W. F. 'Conway, Executive Vice President Nuclear, to US NRC dated June 6, 1989 B) Letter from R. P. Zimmerman, Director, Division of Reactor Safety and Projects, to Mr. D. Karner, Executive Vice President, dated April 28, 1989

Dear Sirs:

Subj ect: Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528 (License No. NPF-41)

STN 50-529 (License No. NPF-51)

STN 50-530 (License No. NPF-74)

Emergency Operating Procedures le 90-00 -493 This letter provides an updated status of our actions to upgrade the Emergency Operating Procedures (EOPs). The schedule for the completion of the EOP upgrade has been revised to incorporate increased work scope and the limited availability of the simulator for procedure validation. Attachment 1 delineates the current schedule.

The scope of the EOP upgrade program was expanded to include guidance provided in NUREG 1358 as recommended by the NRC (Reference B). In addition, efforts to resolve human factor concerns within procedures have added more man-hours to procedure preparation than originally anticipated.

The EOP validation schedule includes use of the plant simulator to perform procedure walkdown, verification, and validation. APS originally intended to complete validation of the upgraded EOP's by May 22, 1990. However, the extensive changes currently in progress to improve the simulator fidelity, as discussed with the NRC, preclude use of the simulator until changes are complete. Therefore in order to minimize the delay caused by these changes, the validation of the revised EOPs will be accomplished in two phases. An initial validation will be performed by computer simulation, table top discussion, and walkdown. This will minimize the time requirements for validation on the simulator. The simulator validation will then be performed when the simulator is available in the second quarter of 1991.

oo~

9004060342 900321 PDR ADOCK 05000528 PDC F

0 1

~ 'I

~

Document Control Desk Page 2 If you have any questions, on this matter, please contact Mr. T. R. Bradish, Compliance Manager, at (602) 393-2521.

Very truly yours, WFC/TRB/SBJ/kj Attachment cc: J. B. Martin D. H. Coe A. C. Gehr J. R. Newman

0 ~w 4

I'4

ATTACHMENT 1 MILESTONE PROJECTED COMPLETION DATE Revise EOPs June 4, 1990 Verification of EOPs August 30, 1990 Validation Phase 1* of EOPs April 15, 1991 Simulator Validation of EOPs (Phase II) July 31, 1991 Train Licensed Personnel September 3, 1991 Revised EOP's effective September 30, 1991 This validation consists of computer simulation, table top discussion, and walkdown.