ACCELERATED DISTIIXBUTION DEMONSTFWTION SYSTEM
~
~
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9004060342 DOC-DATE: 90/03/21 NOTARIZED-NO DOCKET I FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION CONWAY,W.F.
Arizona Public Service Co.
(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Provides updated status of actions to upgrade emergency operating procedures.
DISTRIBUTION CODE:
A003D COPIES RECEIVED:LTR Q ENCL 0 SIZE:
TITLE: OR/Licensing Submittal:
Suppl 1 to NUREG-0737(Generic Ltr NOTES: Standardized plant.
Standardized plant.
D 8
82-33)
/
05000528 05000529 05000530 D
RECIPIENT ID CODE/NAME PD5 LA PETERSON,S.
INTERNAL:, NRR/DLPQ/LHFB11 OC/LFMB RES/DSIR/EIB EXTERNAL: LPDR NSIC NOTES COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD5 PD BSTRACT REG FIL 01 NRC PDR COPIES LTTR ENCL D
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTEl CONTACT THEJX)CUMENT CONTROL DESK, ROOM PI-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISIRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED:
LTTR 18 ENCL D
8
/
A D,
D S
I Qt
~5 r
f I i
<<l
Arizona Public Service Company P.O. 8OX 53999
~
PHOENIX, ARIZONA85072<999 WILLIAMF. CONWAY EXECUTIVEVICEPRESIDENT NUCLEAR 102-01641-WFC/TRB/SBJ March 21, 1990 U.
S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Reference:
A)
Letter from W. F. 'Conway, Executive Vice President
- Nuclear, to US NRC dated June 6,
1989 B)
Letter from R.
P.
Zimmerman, Director, Division of Reactor Safety and Projects, to Mr. D. Karner, Executive Vice President, dated April 28, 1989
Dear Sirs:
Subj ect:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2,
and 3
Docket Nos.
STN 50-528 (License No. NPF-41)
STN 50-529 (License No. NPF-51)
STN 50-530 (License No. NPF-74)
Emergency Operating Procedures le 90-00
-493 This letter provides an updated status of our actions to upgrade the Emergency Operating Procedures (EOPs).
The schedule for the completion of the EOP upgrade has been revised to incorporate increased work scope and the limited availability of the simulator for procedure validation.
Attachment 1
delineates the current schedule.
The scope of the EOP upgrade program was expanded to include guidance provided in NUREG 1358 as recommended by the NRC (Reference B).
In addition, efforts to resolve human factor concerns within procedures have added more man-hours to procedure preparation than originally anticipated.
The EOP validation schedule includes use of the plant simulator to perform procedure walkdown, verification, and validation.
APS originally intended to complete validation of the upgraded EOP's by May 22, 1990.
- However, the extensive changes currently in progress to improve the simulator fidelity, as discussed with the NRC, preclude use of the simulator until changes are complete.
Therefore in order to minimize the delay caused by these
- changes, the validation of the revised EOPs will be accomplished in two phases.
An initial validation will be performed by computer simulation, table top discussion, and walkdown.
This will minimize the time requirements for validation on the simulator.
The simulator validation will then be performed when the simulator is available in the second quarter of 1991.
9004060342 900321 PDR ADOCK 05000528 F
PDC oo~
0 1
~
~'I
Document Control Desk Page 2
If you have any questions, on this matter, please contact Mr. T.
R. Bradish, Compliance Manager, at (602) 393-2521.
Very truly yours, WFC/TRB/SBJ/kj Attachment cc:
J.
B. Martin D.
H.
Coe A. C. Gehr J.
R.
Newman
0
~w 4
I'4
ATTACHMENT 1 MILESTONE PROJECTED COMPLETION DATE Revise EOPs Verification of EOPs Validation Phase 1* of EOPs Simulator Validation of EOPs (Phase II)
Train Licensed Personnel Revised EOP's effective June 4, 1990 August 30, 1990 April 15, 1991 July 31, 1991 September 3,
1991 September 30, 1991 This validation consists of computer simulation, table top discussion, and walkdown.