ACCELERATED D TIUBUTION DEMONS'HMTION SYSTEM pa%
~i
~
A REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
FACIL:STN-50-528 Palo Verde Nuclear Station, STN-50-529 Palo Verde Nuclear Station, STN-50-530 Palo Verde Nuclear Station, AUTH.NAME AUTHOR AFFILIATION PORTER,K.F.
Arizona Public Service Co.
LEVINE,J.M.
Arizona Public Service Co.
RECIP.NAME RECIPIENT AFFILIATION NOTARIZED:
NO DOCKET g
Unit; 1, Arizona Publi 05000528 Unit 2, Arizona Publi 05000529 Unit 3, Arizona Publi 05000530 (formerly Arizona Nuclear Power (formerly Arizona Nuclear Power I
SUBJECT:
Monthly o er
'ng repts for Feb 1990 for Palo Verde Units 1, 2
8( 3.
00314 tr, DISTRIBUTION CODE IE24D COPIES RECEIVED LTR ENCL SIZE:
TITLE: Monthly Operat:ing Report (per Tech Specs)
D NOTES Standardized plant.
Standardized plant.
05000528 A
05000529 05000530 RECIPIENT ID CODE/NAME PD5 LA PETERSON,S.
INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/LPEB10 NR REP/PRPB11 F
EXTERNAL: EGGG SIMPSON, F NRC PDR NOTES COPIES LTTR ENCL 3
3 1
1 10 10 1
1 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID'ODE/NAME PD5 PD AEOD/DOA IRM TECH ADV NRR/DOEA/OEAB11 NUDOCS-ABSTRACT RGN5 LPDR NSIC COPIES LTTR ENCL 1
1 1
1 2
2 1
1 1
1 1
1 1
1 1
1 D
D NOTE TO ALL"RIDS" RECIPIENTS:
D D
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED:
LTTR 30 ENCL 30
Arizona Public Service Company P.O. BOX 53999
~ PHOENIX, ARIZONA850724999 254-007890JML/KFP March 14, 1990 Docket Nos.
STN 50-528/529/530 Document Control Desk U. S. Nuclear Regulatory Commission Mail Station P1-37 Washington, D.C.
20555
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3
Monthly Operating Reports for February 1990 File:
90-024-404/90-056-026 Attached are the Monthly Operating Reports for February 1990 prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A
(Technical Specifications) to the Palo Verde Nuclear Generating
- Station, Units 1,
2, and 3
Operating Licenses.
By copy of this letter, we are also forwarding the Monthly Operating Reports to the Regional Administrator of the Region V Office.
If you have any questions, please contact Mr. K. F. Porter, at (602) 340-4187.
Very truly yours, M. Levine ice President Nuclear Production JML/KFP Attachments cc:
T. L. Chan J.
B. Martin D. H.
Coe INPO Records Center (all w/attachments) 900319 o
050005 90173, 900228, l
rgxk I
1
I'
NRC MONTHLY OPERATING REPORT DOCKET NO.
50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K F Porter OPERATING STATUS 1.
Unit Name:
Palo Verde Nuclear Generatin Station Unit 1 2.
Reporting Period:
Februar 1990 3.
Licensed Thermal Power (MWt):
3800 4.
Nameplate Rating (Gross MWe):
1403 5.
Design Electrical Rating (Net MWe):
1220 6.
Maximum Dependable Capacity (Gross MWe): 1303 7.
Maximum Dependable Capacity (Net MWe):
~12 8.
If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
N A 9.
Power Level to Which Restricted, If Any (Net MWe):
one 10.
Reasons For Restrictions, If Any:
N A 11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23 24.
Hours in Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)
Unit Capacity Factor (Using DER Net)
Unit Forced Outage Rate Shutdowns Scheduled Over Next 6
A This Month 6
2 Yr.-to-Date 1 416 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Months (Type, Date and Duration of Each):
Cumulative 35 832 1
262 1
0 0 16 826 9
0 0 60 931 221 21 163 100 19 93 190 4
Oa 47 0
45 2
43 5
28 1
- 25. If Shutdown At End of Report Period, Estimated Date of Start-up:
A ril 4 1990 INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Forecast
~05 85 06 85 11 85 Achieved 05/525 85 06 10 85 01 28 86 1-
r.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-528 UNIT NAME PVNGS-1 DATE NCHl-COMPLETED BY K F Porter MONTH:
FEBRUARY 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 17 18 19 20 21 0
22 23 24 25 10 26 27 0
12 28 13 14 15 16
N
REFUELING INFORMATION DOCKET NO.
50-528 UNIT NAME PVNGS-1 DATE "K
1 ~
Scheduled date for next refueling shutdown.
01/04/92, 3rd refueling.
2.
Scheduled date for restart following refueling.
04/07/92 3.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment2 To be determined.
4.
Scheduled date for submitting proposed licensing action and supporting information.
To be determined.
5.
Important Licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
6.
To be determined.
The number of fuel assemblies.
a)
In the core.
241 b)
In the spent fuel storage pool.
188 7
~
Intended change in spent fuel storage capacity.
None 8.
Pro)ected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2004 (18 Month reloads and full core discharge capability).
3-
II l',
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.
50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K F Porter Februar 1990 02/28 24:00 02/01 00:00 Unit began the month in Mode 5, 2nd Refueling Outage.
Unit ended the month in Mode 5.
4
k i(
SHUTDOWNS AND POWER REDUCTIONS DOCKET NO 50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K.F. Porter Method of Duration Shutting System No.
Date Type Hours Reason Down Reactor LER No.
Code Cause and Corrective Component Action to Code Prevent Recurrence 89/03 04/08/89 S
672 C
4 N/A N/A N/A Continuetfon of 2nd refuel outage.
F-Forced S-Scheduled Reason:
A-Equipment Failure(Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination I
F-Administrative G-Operational Error H-Other (Explain)
Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20% or Greater in the Past 24 Hours 9-Other-(Explain)
Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)
Exhibit H-Same Source 5
I II I
NRC MONTHLY OPERATING REPORT UNIT NAME PVNGS-2 DATE COMPLETED BY K F Porter OPERATING STATUS l.
2.
3.
4, 5.
6.
7.
8.
9.
10.
Unit Name:
Palo Verde Nuclear Generatin Station Unit 2 Reporting Period:
Februa 1990 Licensed Thermal Power (MWt):
3800 Nameplate Rating (Gross MWe):
1403 Design Electrical Rating (Net MWe):
~l 0
Maximum Dependable Capacity (Gross MWe): 1303 Maximum Dependable Capacity (Net MWe):
~22 If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
N A Power Level to Which Restricted, If Any (Net MWe):
None Reasons For Restrictions, If Any:
A 11.
12
'3.
14.
15.
16
'7.
18
'9.
20.
21
'2.
23.
24.
Hours in Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)
Unit Capacity Factor (Using DER Net)
Unit Forced Outage Rate Shutdowns Scheduled Over Next 6
N A This Month 6
2 Yr.-to-Date 1 416 551 0
0 0 551 0
0 0 1 295 0
0 0 1 295.0 0 0 2 064 631 4 870 700 6 800 693 616 82 0 82 0 1
12 500 1 624 008 91 5
91 5s 84 5
93 9
Months (Type, Date and Duration of Each):
Cumulative 30 216 20 546 1
0 0 20 042 2
0 0 3 499 053 25 682 370 24 006 820 66 3a 66 3
65.la 62.6a 9
9
- 25. If Shutdown At End of Report Period, Estimated Date of Start-up:
A 3
90 INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Forecast
~03 86 06 86 11 86 Achieved
~OL 18 86 05 20 86 09 19 86 6
P I'
I
(
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-529 UNIT NAME PVNGS-2 DATE
- K MONTH:
FEBRUARY 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1256 17 1259 125 18 1255 1260 19 1258 1259 20 1254 1260 21 1256 1259 22 124 1258 23 1006 1259 24 1258 25 10 1259 125 26 27 12 125 28 13 1241 14 1260 15 1261 16 1261 7
t H
l' g
4
REFUELING INFORMATION DOCKET NO.
50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K F Porter 2.
Scheduled date for next refueling shutdown.
09/15/91, 3rd refueling.
Scheduled date for restart following refueling.
12/19/91 3.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
To be determined.
4.
Scheduled date for submitting proposed licensing action and supporting information.
To be determined.
Important Licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
6.
To be determined.
The number of fuel assemblies.
a)
In the core.
241 b)
In the spent fuel storage pool.
108 7.
Licensed spent fuel storage capacity.
1329 Intended change in spent fuel storage capacity.
None 8.
Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2004 (18 Month reloads and full core discharge capability).
8
i t
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH N=
UNIT NAME PVNGS-2 DATE "K
Februa 1990 02/01 02/22 02/23 02/24 02/25 02/28 00'00 21:41 23:01 19:53 05'57 24:00 Unit began the month in Mode 1, 100$
RX power.
RX power reduced to 90% due to problems with the plant comput: er.
RX/Turbine manually tripped from 20$ power to begin the 2nd refueling outage.
Unit entered Mode 3.
Unit entered Mode 4.
Unit entered Mode 5.
Unit ended the month in Mode 5, 2nd Refueling Outage.
9
ill i'
f l
SHUTDOWNS AND POWER REDUCTIONS DOCKET NO 50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K.F. Porte No.
Method of Duration Shutting System Date Type Hours Reason Down Reactor LER No.
Code Cause and Corrective Component Action to Code Prevent Recurrence 90/01 02/23/90 S
121 N/A N/A N/A 2nd Refueling Outage.
F-Forced S-Scheduled Reason:
A-Equipment Failure(Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 6 License Examination F-Administrative G-Operational Error H-Other (Explain) 3Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20% or Greater in the Past 24 Hours 9-Other-(Explain)
Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)
Exhibit H-Same Source 10-
NRC MONTHLY OPERATING REPORT DOCKET NO.
50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K F Porter OPERATING STATUS 1.
2.
3.
4.
5.
6.
7.
8.
io Unit 3 Unit Name:
Palo Verde uc e
G ra Reporting Period:
Februa 1990 Licensed Thermal Power (MWt):
380(8 Nameplate Rating (Gross MWe):
1403 Design Electrical Rating (Net MWe):
~12 0 Maximum Dependable Capacity (Gross MWe): ~0 Maximum Dependable Capacity (Net MWe):
If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since.Last Report, Give Reasons:
A 9.,
Power Level to Which Restricted, If Any (Net MWe):
None 10.
Reasons For Restrictions, If Any:
A 11.
12.
13.
14.
15.
16
'7.
18
'9.
20.
21.
22.
23.
24.
Hours in Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)
Unit Capacity Factor (Using DER Net)
Unit Forced Outage Rate Shutdowns Scheduled Over Next 6 N A This Month 6
2 Yr.-to-Date 1 416 0 0 620 0 0 1 008 0
0 0 929 6
0 0 290 032 813 900 2
5 4 8 962 400 69 010 100 0
100 0
8 9 119 65 6
65 6
93 50 8
Months (Type, Date and Duration of Each):
Cumulative 18 92 0 419 2
0 0 10 203 6
0 0 3
16 869 13 030 200 12 42 584 54 3
54 3
53 4 51 3
12 4
- 25. If Shutdown At End of Report Period, Estimated Date of Start-up:
A INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Forecast
~07 8
09 8
Achieved 10/D25 81.
~11 2~88 01 08 88 11-
1[
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K F Porter MONTH'EBRUARY 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 17 868 1159 18 1216 19 864 20 1261 8 1 21 1261 8 4 22 1259 8 4 23 1263 94 24 1259 11 5
25 1216 10 26 12 5
1232 27 1256 12 1225 28 1255 13 1228 14 1233 15 1231 16 12
4 t
REFUELING INFORMATION DOCKET NO.
50-530 UNIT NAME PVNGS-3 DATE 1.
Scheduled date for next refueling shutdown.
2.
03/10/91, 2nd refueling.
Scheduled date for restart following refueling.
06/14/91 3.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment2 To be determined.
Scheduled date for submitting proposed licensing action and supporting information.
To be determined.
5.
Important Licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
6.
To be determined.
The number of fuel assemblies.
a)
In the core.
241 b)
In the spent fuel storage pool.
104 7.
Licensed spent fuel storage capacity.
1329 Intended change in spent fuel storage capacity.
None 8.
Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2005 (18 Month reloads and full core discharge capability).
13
I J
Il
~y
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.
50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K F Porter Febru 1990 02/01 02/01 02/03 02/08 02/11 00'00 11;50 11:39 22:22 05:15 Unit began the month in Mode 1, 78% RX power.
RX power at 90%
RX power reduced to 70% for Feedwater Pump "B" maintenance.
RX power increase stopped at 90% to evaluate secondary performance.
RX power increased to 95%,
evaluation of secondary performance continued.
02/17 02/18 02/25 02/26 02/28 01:23 00:08 01:10 18:13 24:00 RX power reduced to 70% for Feedwater Pump "A" maintenace.
RX power increased to 98$.
RX power reduced to 95% for MTC testing.
RX power increased to 98%.
Unit ended the month in Mode 1, 98%
RX power.
14-
~
I A
g1 I
SHUTDOWNS AND POWER REDUCTIONS DOCKET NO 50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K.F. Porter Method of Duration Shutting System No.
Date Type Hours Reason Down Reactor LER No.
Code Cause and Corrective Component Action to Code Prevent Recurrence 90/02 02/03/90 S
90/03 02/17/90 S
N/A N/A N/A N/A N/A N/A N/A Feedwater Bmp "A" maintenance.
F-Forced S-Scheduled Reason:
A-Equipment Failure(Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error H-Other (Explain)
Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 208 or Greater in the Past 24 Hours 9-Other-(Explain)
Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)
Exhibit H-Same Source y
~