DOCKET N

05000528 05000529 05000530 ACCEMRATED

. ~STRJBUTION DEMONS~ATION SYSTEM REGUL~RY INFORMATION DISTRIBUTE% SYSTEM (RIDS)

FACIL:ST¹50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi AUTH.NAME AUTHOR AFFILIATION PORTERPK.F.

Arizona Public Service Co. (formerly Arizona Nuclear Power LEVINE,J.M.

Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Jan 1990 for Palo Verde Nuclear Generating, Station Units 1,2

& 3.W 00214 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL /

SIRE:

TITLE: Monthly Operating Report (per Tech Spec

)

NOTES: Standardized plant.

Standardized plant.

05000528 /

05000529 05000530 A.

RECIPIENT ID CODE/NAME PDS LA PETERSONsS.

INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/LPEB10 NRR/DREP/PRPB11 ES FIDE~01~

EXTERNAL'GGG S IMPSON s F

NRC, PDR NOTES:

COPIES LTTR ENCL 3

3 1

1 10 10 1

1 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD5 PD AEOD/DOA IRM TECH ADV NRR/DOEA/OEAB11 NUDOCS-ABSTRACT RGN5 LPDR NSIC COPIES LTTR ENCL 1

1 1

1 2

2 1

1 1

1 1

1 1

1 1

1 S

NOTE LO ALL "RIDS" RECIPZEPXS:

PLEASE HELP US 'IO REDUCE RATE!

CCkVACT 'IHE DOCUMEÃZ CON'IDOL DESK, RQCN Pl-37 (EXT. 20079)

TO EKZMINLTR RÃ3R MHE PKH DISTRIBUTION LISTS H3R DOCUMEHZS KRJ DGNiT NEZD!

D S

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 30 ENCL 30

1 4

e V

0

~

~

f i~I

'I 1

l' I

Arizona Public Service Company PO. BOX 53999

~ PHOENIX, ARIZONA850724999 254-00757-JM'./KPP February 14, 1990 Docket Nos.

STN 50-528/529/530 Document Control Desk U. S. Nuclear Regulatory Commission Mail Station Pl-37 Washington, D.C.

20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3

Monthly Operating Reports for January 1990 File:

90-024-404/90-056-026 Attached are the Monthly Operating Reports for January 1990 prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A

(Technical Specifications) to the Palo Verde Nuclear Generating

Station, Units 1,

2, and 3

Operating Licenses.

By copy of this letter, we are also forwarding the Monthly Operating Reports to the Regional Administrator of the Region V Office.

If you have any questions, please contact Mr. K. F. Porter, at (602) 340-4187.

Very truly yours, M. Levine ice President Nuclear Production JML/KFP Attachments cc:

T. L. Chan (all w/attachments)

J.

B. Martin D. H.

Coe INPO Records Center 9002220245 900131 PDR ADOCK 05000528 PDC

0

~

~

t r<

1

NRC MONTHLY OPERATING REPORT DOCKET NO.

50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K F Porter OPERATING STATUS l.

2.

3.

4.

5.

6.

7.

8.

9.

10 Unit Name:

Palo Verde Nuclear Generatin Station Unit 1 Reporting Period:

Januar 1990 Licensed Thermal Power (MWt):

3800 Nameplate Rating (Gross MWe):

1403 Design Electrical Rating (Net MWe):

~12 0 Maximum Dependable Capacity (Gross MWe): 1303 Maximum Dependable Capacity (Net MWe):

1221 If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

N A Power Level to Which Restricted, If Any (Net MWe):

None Reasons For Restrictions, If Any:

N A 11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24

'ours in Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate Shutdowns Scheduled Over Next N A This Month 744 Yr.-to-Date 744 0.0 0 0 0.0 0 0 0 0 0 0 0.0 0.0 0 0 0 0 0.0%

0 Oa 0.0%

0.0 0

0%

0.0%

0.0%

6 Months (Type, Date and Duration of Each):

Cumulative 35 160 17 262.1 0 0 16 826.9 0 0 60 931 221 21 163 100 19 793 190 47 9

47 9

46 1

44 3

28.1 a

25 If Shutdown At End of Report Period, Estimated Date of Start-up:

A ril 1 1990 INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Forecast

~05 85

~06 85 11 85 Achieved

~05 25 85 06 10 85 01 28 86 1

~

~

0 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-528 UNIT NAME PVNGS-I DATE COMPLETED BY K F. Porter MONTH:

JANUARY 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 17 18 19 20 21 22 23 24 25 10 26 27 28 13 29 30 15 31 16

0

REFUELING INFORMATION DOCKET NO.

50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K F Porter 1.

Scheduled date for next refueling shutdown.

01/04/92, 3rd refueling.

2.

Scheduled date for restart following refueling.

04/07/92 3.

Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

To be determined.

4.

Scheduled date for submitting proposed licensing action and supporting information.

To be determined.

5.

Important Licensing considerations associated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

To be determined.

6.

The number of fuel assemblies.

a)

In the core.

241 b)

In the spent fuel storage pool.

188 7.

Licensed spent fuel storage capacity.

1329 Intended change in spent fuel storage capacity.

None 8.

Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2004 (18 Month reloads and full core discharge capability).

3

t 4

k A

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.

50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K.F. Porter Januar 1990 01/01 01/09 01/31 00:00 02:50 24:00 Unit began the month in Mode 6, 2nd Refueling Outage.

Unit entered Mode 5.

Unit ended the month in Mode 5.

4

ik I

I t

SHUTDOWNS AND POWER REDUCTIONS DOCKET NO 50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K.F. Porter Method of Duration Shutting System No.

Date Type Hours Reason Down Reactor LER No.

Code~

Cause and Corrective Component Action to Code~

Prevent Recurrence 89/03 04/08/89 S

744 C

4 N/A N/A N/A Continuation of 2nd refuel g

outage.

~F-Forced S-Scheduled

~Reason:

A-Equipment Failure(Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 6 License Examination F-Administrative G-Operational Error H-Other (Explain)

~Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20% or Greater in the Past 24 Hours 9-Other-(Explain)

~Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)

~Exhibit H-Same Source 5

NRC MONTHLY OPERATING REPORT DOCKET NO.

50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K F Porter OPERATING STATUS 1.

2.

3.

4.

5.

6.

7.

8.

9.

10 Unit Name:

Palo Verde Nuclear Generatin Station Unit 2 Reporting Period:

Januar 1990 Licensed Thermal Power (MWt):

3800 Nameplate Rating (Gross MWe):

1403 Design Electrical Rating (Net MWe):

1270 Maximum Dependable Capacity (Gross MWe): 1303 Maximum Dependable Capacity (Net MWe):

1221 If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

N A Power Level to Which Restricted, If Any (Net MWe):

None Reasons For Restrictions, If Any:

N A 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Yr.-to-Date 744 744.0 0.0 744 0 0.0 2 806 069 985 700 930 392 100.0a 100 0

102.4%

98.5%

0.0%

(Type, Date and Duration of Each):

This Month Hours in Reporting Period 744 Number of Hours Reactor Was Critical 744.0 Reactor Reserve Shutdown Hours 0.0 Hours Generator On-Line 744.0 Unit Reserve Shutdown Hours 0.0 Gross Thermal Energy Generated (MWH) 2 806 069 Gross Electrical Energy Generated (MWH) 985 700 Net Electrical Energy Generated (MWH) 930 392 Unit Service Factor 100.0%

Unit Availability Factor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate Shutdowns Scheduled Over Next 6 Months Refuelin Outa e

- 02 24 90 - 95 Da s Cumula tive 29 544 19 995 1

0 0 19 491 2

0.0 71 434 422 24 955 570 23 313 204 66.0%

66 0 64 6s 62 1

10 1%

25 If Shutdown At End of Report Period, Estimated Date of Start-up:

N A INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Forecast

~03 86 06 86

~11 86 Achieved

~04 18 86 05 20 86 09 19 86 6

]I 1r J

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K.F Porter MONTH:

JANUARY 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1251 17 1252 1252 18 1253 1252 1255 1253 20 1257 1253 1257 1253 22 1255 1255 23 1255 1253 24 1257 1250 25 1257 10 1250 26 1260 1251 27 1248 12 1250 28 1259 13 1247 29 1257 14 1249 30 1259 15 1249 31 1257 1256

tl

REFUELING INFORMATION DOCKET NO.

50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K F Porter 1.

Scheduled date for next refueling shutdown.

02/24/90, 2nd refueling.

2.

Scheduled date for restart following refueling.

06/04/90 3.

Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

Fig. 3.1-1A, Tables 3.1-2, 3.1-3, 3.1-5, Fig. 3.2-2, Fig. 3.2-2a Fig. 3.1-3, Fig. 3.1-4, Tech Spec 3.2.7 4.

Scheduled date for submitting proposed licensing action and supporting information.

Issued ll/06/89 5.

Important Licensing considerations associated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design~or performance analysis methods, significant changes in fuel design, new operating procedures.

To be determined 6.

The number of fuel assemblies.

a)

In the core.

241 b)

In the spent fuel storage pool.

108 7.

Licensed spent fuel storage capacity.

1329 Intended change in spent fuel storage capacity.

None 8.

Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2004 (18 Month reloads and full core discharge capability).

8

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.

50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K.F Porter Januar 1990 01/01 01/31 00:00 24:00 Unit began the month in Mode 1, 100%

RX power.

Unit ended the month in Mode 1, 100%

RX power.

9

t 1

SHUTDOWNS AND POWER REDUCTIONS DOCKET NO 50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K.F. Porter No.

Method of Duration Shutting Syst: em Date Type Hours Reason Down Reactor LER No.

Code~

Component Code~

Cause and Corrective Action to Prevent Recurrence No outages or power reductions of greater than 20% occurred during the month.

~F-Forced S-Scheduled

~Reason:

A-Equipment Failure(Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error H-Other (Explain)

~Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20% or Greater in the Past 24 Hours 9-Other-(Explain)

~Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)

~Exhibit H-Same Source 10-

NRC MONTHLY OPERATING REPORT DOCKET NO.

50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K F Porter OPERATING STATUS 1.

2.

3.

4.

5.

6.

7.

8.

9.

10 Unit Name:

Palo Verde Nuclear Generatin Station Unit 3 Reporting Period:

Janua 1990 Licensed Thermal Power (MWt):

3800 Nameplate Rating (Gross MWe):

1403 Design Electrical Rating (Net MWe):

~12 0 Maximum Dependable Capacity (Gross MWe): 1303 Maximum Dependable Capacity (Net MWe):

1221 If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

N A Power Level to Which Restricted, If Any (Net MWe):

None Reasons For Restrictions, If Any:

N A 11.

12.

13.

14.

15.

16.

17.

18 19.

20.

21.

22 23.

24.

Hours in Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate Shutdowns Scheduled Over Next N A This Month 44 Yr.-to-Date 44 336 0

0 0 257 6

0 0 336.0 0.0 257.6 0 0 46 446 46 446 148 500 148 500 110 109 34 6

34.6 110 109 34 6

34 6

12 1

12 1

65 1s 6 Months (Type, Date and Duration of Each):

Cumulative 18 120 9 747 2

0.0 9 531 6

0.0 34 877 837 12 216 300 ll 473 574 52.6a 52 6

51 9s 49.9 13 2s

25. If Shutdown At End of Report Period, Estimated Date of Start-up:

N A INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Forecast

~07 87

~08 09 87 Achieved 10/D25 87 11 28 87 01I108 88 11

V

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.

50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K.F. Porter MONTH:

JANUARY 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 17 18 19 20 21 53 22 96 23 76 24 189 25 443 10 26 550 27 632 12 28 804 13 29 826 14 30 861 15 31 983 12

r

REFUELING INFORMATION DOCKET NO.

50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K F Porter 1.

Scheduled date for next refueling shutdown.

03/10/91, 2nd refueling.

2.

Scheduled date for restart following refueling.

06/14/91 3.

Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

To be determined.

4.

Scheduled date for submitting proposed licensing action and supporting information.

To be determined.

Important Licensing considerations associated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

To be determined.

6.

The number of fuel assemblies.

a)

In the core.

241 b)

In the spent fuel storage pool.

104 7.

Licensed spent fuel storage capacity.

1329 Intended change in spent fuel storage capacity.

None 8.

Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2005 (18 Month reloads and full core discharge capability).

13

A

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.

50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K F Porter 01/01 00:00 Unit began the month in Mode 3 in an outage to replace the "A" phase main transformer.

01/18 01/19 01/21 01/21 01/21 01/31 00:02 21:47 00:21 05:02 11:06 24:00 Unit entered Mode 2.

Unit entered Mode 1.

Synchronized the main generator to the grid.

Tripped the main generator to perform scheduled turbine overspeed testing.

Synchronized the main generator to the grid.

The unit ended the month in Mode 1, 78%

RX power.

14

t'y il Hr

)

SHUTDOWNS AND POWER REDUCTIONS DOCKET NO 50-530

~

UNIT NAME PVNGS-3 DATE COMPLETED BY K.F. Porfer No.

Method of Duration Shutting System Date Type'ours Reason Down Reactor LER No.

Code4 Component Code Cause and Corrective Action to Prevent Recurrence 89/04 12/30/89 F

480.3 N/A N/A N/A Continuation of outage from the previous month when the generator tripped due to an internal fault in the "A" main transformer.

90/01 01/21/90 S

6.1 N/A N/A N/A Outage for main turbine overspeed testing.

'F-Forced S-Scheduled

'Reason:

Method:

A-Equipment Failure(Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from E-Operator Training 6 License Previous Month Examination 5-Reduction of 20% or F-Administrative Greater in the Past G-Operational Error 24 Hours H-Other (Explain) 9-Other-(Explain) 4Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)

Exhibit H-Same Source 15

~ r J,