ML17304B283

From kanterella
Jump to navigation Jump to search
Requests Extension Until 890831 to Respond to Generic Ltr 89-06 & Task Action Plan,Item II.D.2, SPDS Per 10CFR50.54(f). Generic Ltr Not Received Until 890516
ML17304B283
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/27/1989
From: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TASK-1.D.2, TASK-TM 161-02062-WFC-R, 161-2062-WFC-R, GL-89-06, GL-89-6, NUDOCS 8906300140
Download: ML17304B283 (6)


Text

- gc CE1ZRATED DISTKBUTION DEMONSTRATION SYSTEM o.'..~,

REGULAT ZNFORMATZON DZSTRZBUTZONIZSTEM (RZDS)

ACCESSION NBP.:8k06300140 DOC.DATE: 89/06/27 NOTARIZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529" STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION CONWAYFW.F.

Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Requests extension of time to respond to Generic Ltr 89-06, Task Action Plan Item I.D.2, "Safety Parameter Display...."

DISTRIBUTION CODE:

A004D COP1ES RECEIVED:LTR Q ENCL' SIZE:

D TITLE: Safety Parameter Display System (Item 1.D.2) Generic Ltr 89-06 Respon NOTES:Standardized plant.

05000528'tandardized plant.

05000529 Standardized plant.

05000530 RECIPIENT ID CODE/NAME PD5 LA CHAN,T DAVIS,M.

INTERNAL: NRR/DLPQ/HFB 10 NUDOCS-ABSTRACT 01 EXTERNAL: LPDR NSIC NOTES:

COPIES LTTR ENCL RECIPIENT ZD CODE/NAME PD5 PD DAVIS,M NRR/DRSP/PD-3-3 OC/LFMB RES/DSIR/EIB NRC PDR COP1ES LTTR ENCL 7

1 NCTE 'ZO ALL 'KIDS" RICZPIEHZS:

PLEASE HELP US TO REDUCE HASTE!

COMIRCT 'IHE DOCUMKI'GÃIROLDESK, RDCN P1-37 (EXT. 20079)

%0 ELZKBQXB YOUR NAMB PRCH DZSTBZKTZZQN LISTS FOR DOCXBKMZS YOU DGHFT NEED!

D D

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 22 ENCL

0 i!

Arizona Public Service Company P.O. BOX 53999

~

PHOENIX, ARIZONA850724999 WILLIAMF. CONWAY EXECUTIVEVICEPRESIDENT NUCLEAR 161-02062-WFC/RAB June 27, 1989 Docket Nos.

STN 50-528/529/530 Document Control Desk U. S. Nuclear Regulatory Commission Mail Station Pl-137 Washington, D. C.

20555

Reference:

Task Action Plan Item I.D.2 Safety Parameter Display System 10 CFR 50.54(f)

(Generic Letter No. 89-06)

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2 and 3

Request for Extension of Time to Respond to Generic Letter No. 89-06 File:

89-010-026 Arizona Public Service Co.

(APS) is requesting an extension of time to respond to the referenced letter until August 31, 1989.

We are making this -request for the following reasons.

(1)

APS received the Generic Letter on May 16,

1989, more than one month after it was dated by NRC.

(2)

APS intends to verify that all requirements of NUREG-0737, Supplement 1, for SPDS, have been considered in design and implementation.

This is beyond the requirements of the Generic Letter,

however, we believe that it would be appropriate to do prior to certifying the status of the SPDS at Palo Verde.

(3)

APS must verify installation in all three Palo Verde Units.,

We consider this request to be reasonable when the above three factors are taken into consideration.

If you have any questions, please call Carter Rogers at (602) 371-4041.

Sincerely, WFC/RAB/gle os 890b300140 890b27 PDR ADOCN, 05000528 P

PNU

0

~s

~ 9

~L

Document Control Desk U. S. Nuclear Regulatory Commission Page 2

161-02062-WFC/RAB

.June 27, 1989 CC:

J.

B. Martin T'. L. Chan M. J. Davis T. J. Polich A. C. Gehr

rq,p 4