Forwards Insp Repts 50-528/89-19,50-529/89-19 & 50-530/89-19 on 890424-28.No Violations Noted.Corrective Actions Noted in 881229 Response to Notice of Violation & Imposition of Civil Penalties Have Not Been Totally Effective
ML17304B255
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 05/31/1989
From: Scarano R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17304B256 List:
References
NUDOCS 8906210250
Download: ML17304B255 (6)


See also: IR 05000528/1989019

Text

4

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RZDS)

DOCKET ¹

05000528

05000529

05000530

SUBJECT:

Forwards

Insp Repts

50-528/89-13,50-529/89-13

& 50-530/89-13

on 890424-28.No violations noted.

DISTRIBUTION CODE:

ZE06D

COPIES

RECEIVED:LTR L ENCL /

SIZE:

I

TITLE: Environ

& Radiological

(50 DKT)-Insp Rept/Notice of Violation

espons

l

NOTES:Standardized

plant.

05000528

Standardized

plant.

05000529

Standardized

plant.

05000530

~l

ACCESSION NBR:8906210250

DOC.DATE- 89/05/31

NOTARIZED: NO

FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi

STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi

STN-50-530 Palo Verde Nuclear Station,

Unit 3, Arizona Publi

AUTH.NAME

AUTHOR AFFILIATION

ARANO,R.A.

~

~

~

~

Fuel Process.

& Fab.

Branch

(Pre

790727)

RECIP.NAME

RECIPIENT AFFILIATION

CONWAY,W.F.

Arizona Public Service

Co. (formerly Arizona Nuclear

Power

RECIPIENT

ID CODE/NAME

PD5

LA

CHAN,T

DAVIS,M.

COPIES

LTTR ENCL

1

0

1

1

1

1

RECIPIENT

ID CODE/NAME

PD5

PD

DAVIS,M

COPIES

LTTR ENCL

1

1

1

1

INTERNAL: ACRS

NMSS/LLOB

5E4

NRR/DLPQ/PEB

10

NRR/DREP/EPB

10

'NRR/PMAS/ILRB12

OGC/HDS1

RES

RGN5

FILE

Ol

RGN4 MURRAY,B

2

AEOD/DSP

1

NMSS/SGDB

4E4

1

NRR/DOEA/EAB 11

1

NRR/DREP/RPB

10

1

BSTRACT

1

02

1

RGN5

DRSS/RPB

1

RGN2 COLLINSi D

1

1

1

1

1

1

1

2

2

1

1

1

1

2

2

1

1

EXTERNAL: EG&G SIMPSONiF

NRC

PDR

NOTES:

2

2

1

1

1

1

LPDR

NSIC

1

1

1

1

NVZE 'ZO ALL "RIDS" RZCIPIENZS:

PIZASE HELP US

ZQ REDUCE HASTE.'OHZACI'IHE DOCUMERl CGNTRDL DESK,

ROCN Pl-37

(EXT. 20079) K) XXZCQR YOUR 5MB PRCH DZSXVGEOTICN

LISTS FOR DOCUMEMIS YOU DCRPT NEEDt

D

S

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

31

ENCL

30

Docket Nos.

50-528,

50-529

and 50-530

Arizona Nuclear

Power Plant

P.

0.

Box 52034

Phoenix,

Arizona 85072-2034

Attention:

Mr.

W.

F.

Conway

Executive Vice President

Nuclear

Gentlemen:

SUBJECT:

NRC INSPECTION

OF

PALO VERDE UNITS 1,

2 and

3

This letter refers to the routine inspection

conducted

by Mr.

M. Cillis of

this office on April 24, 1989,

through April 28, 1989, of activities

authorized

by

NRC License

Nos.

NPF-41,

NPF-51 and NPF-74,

and to the

discussion of our findings held by Mr. Cillis with Mr. J.

E. Kirby and other

members of your staff at the conclusion of the inspection

on April 28,

1989.

Areas

examined during this inspection

are described

in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

No violations of NRC requirements

were identified within the

scope of this

inspection.

The enclosed

inspection report indicates

the corrective actions

described

in

your

December

29, 1988,

response

to the

NRC Notice of Violation and Imposition

of Civil Penalties

dated

December

1, 1988,

have not been totally effective.

The report describes

many deficiencies identified by your Oversight Group to

monitor the adequacy of the radiation protection program being provided during

Unit 1 refueling activities.

We would expect that the corrective actions

described

in your December

29,

1988, letter, to be lasting and effective in

preventing the types of deficiencies identified by the Oversight Group.

The

enclosed

inspection report is worthy of your careful consideration.

While the

NRC enforcement policy encourages

licensees

to identify and correct

deficiencies,

we also expect corrective actions to be lasting and effective.

We would expect that

ANPP management will continue to closely monitor the

adequacy of performance of the radiation protection program implementation.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosure

will be placed in the

NRC Public Document

Room.

Should you have

any questions

conerning this inspection,

we will be glad to

discuss

them with you.

GFi~QI ~~8~

Division Radiation Safety

and Safeguards

Enclosure:

Inspection

Report

Nos.

50-528/89-19,

50"529/89-19

and 50-530/89-19

cc w/enclosure:

J.= G.

Haynes,

ANPP

W.

F. quinn,

ANPP

R.

Papworth,

ANPP

L. Souza,

ANPP

T.

D. Shriver,

ANPP

C.

N.

Russo,

ANPP

D.

Canady,

ANPP

L. Bernabei,

GAP

J.

R.

Brown,

ACC

A.

C.

Gehr,

Esq.,

Snell

8 Wilmer

bcc w/enclosure:

Project Inspector

Resident

Inspector

docket file

G.

Cook

B. Faulkenberry

J. Martin

R.

Nease,

NRR

bcc w/o enclosure:

J. Zollicoffer

M. Smith

REGION V/dot

MCillis

Garcia

5/3I /89

5'/ /89

GPYuhas

54<

89

RASca

5/p]r/89

UEST

COPY

J

ST

COPY ]

EST

COPY

J

RE

T COPY

J

Y

/

NO

Y

S /

NO

S /

NO

NO

0

PDR

3

ES

NO

]