AC CELE RATED DI~ BUTTON DE M0%
STATION SYSTEM REGULATORY INFORMATION DXSTRIBUTION SYSTEM (RXDS)
ACCESSXON NBR:8905240416 DOC.DAT NOTARIZED: NO DOCKET FACXL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION BORST,S.G.
Arizona Nuclear Power Project (formerly Arizona Public Serv HAYNES,J.G.
Arizona Nuclear Power Project (formerly Arizona Public Serv R RECXP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating repts for Apr 1989 lo Verde Nuclear Generating Station Units 1,2 890517 tr.
DXSTRIBUTION CODE:
XE24D COPXES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:Standardized plant.
Standardized plant.
Standardized plant.
05000528 05000529 ~
05000530 D
RECIPIENT ID CODE/NAME PD5 LA CHAN,T DAVIS,M.J.
INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 1 1 NRR/DREP RPB 10 EG 01 EXTERNAL EGGG S IMPSON i F NRC PDR NOTES:
COPIES LTTR ENCL 4
4 1
1 1
1 10 10 1
1 1
1 1
1 1
1 1
1 1
1 1
-1=
RECIPIENT ID CODE/NAME PD5 PD DAVIS,M AEOD/DOA IRM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN5 LPDR NSIC COPIES LTTR ENCL 1
1 1
1 1
1 2
2 1
1 1
1 1
1 1
1 1
1 IIRIDSII RECIPIENIS, PIZASE HELP US IO REDUCE HASTE CXÃIACT '%HE DOCUMENZ CXKHKLDESKi ROOM Pl-37 (EXT. 20079)
KO EZiQGZATE YOUR NME PRCH DISTRIBUTION LISTS FOR DOCUKWIS YOU DGH'T NEEDt D
S, TOTAL NUMBER OF COPIES REQUIRED:
LTTR 33 ENCL 33
() ~
I
P e
NRC MONTHLY OPERATING REPORT DOCKET NO.
50-528 UNIT NAME PVNGS-1 DATE 05 08 89 COMPLETED BY S G
Borst TELEPHONE 602 3 1-4092 OPERATING STATUS 1.
2.
3.
4.
5.
6.
7.
8.
9.
10 Unit Name:
Palo Verde Nuclear Generatin Station Unit Reporting Period:
A ril 1989 Licensed Thermal Power (MWt):
3800 Nameplate Rating (Gross MWe):
1403 Design Electrical Rating (Net MWe):
1270 Maximum Dependable Capacity (Gross MWe):
1303
'Maximum Dependable Capacity (Net MWe):
~122 If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
A Power Level to Which Restricted, If Any (Net MWe):
None Reasons For Restrictions, If Any:
N A This Month Yr.-to-Date Cumulative 2 880 0
20 28 536 0
11.
12.
Hours in Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)
Unit Capacity Factor (Using DER Net) nit Forced Outage Rate Shutdowns Scheduled Over Next A
1 522 0
17 262 1
13 16 826.9 1 522 0
14.
15.
" 16 60 931 221.0 5 565 298.0 1 933 700.0 1 96550 17 21 163 100.0 18 19 793 190 0 59 Oa 52 8
19.
20.
21.
59 0
52 8
56 8a 51 1%
0 6 Months (Type, Date, and Duration of Each):
54.. 6s 28 1
23." U blU24.
ct'O FiOQ.
I N
OO 00O 00O Zo OA r
N OQ 9A 03Q.Q' If Shutdown At End of Report Period, Estimated Date of Startup:
See Note in Shutdown and Power Reductions Section.
Achieved 05/525 85 Forecast
~05 85 INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION 06/610 85 06 85
~01 28 86 11 85
'The normal F.O.R. is not meaningful since the unit went from a forced outage to a planned outage with no service hours.
A more meaningful calculation for this case.
would be forced outage hours divided by period hours (23.3$ ).
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-528 UNIT NAME PVNGS-1 DATE 05 08 89 COMPLETED BY S G. Borst TELEPHONE 602 3 1-4092 MONTH: APRIL 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 17 18 19 20 21 22 0
23 24 25 10 26 27 12 28 13 29 14 30 15 16
~.
~
t
DOCKET NO.
50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY S G. Borst APRIL 1989 04/01 04/08 04/11 04/14 04/30 0000 0000 2301 2220 2400 Unit begins month in Mode 3.
Unit begins refueling outage.
Unit entered Mode 4.
Unit entered Mode 5.
Unit ends month in Mode 5.
(I
DOCKET NO.
50-528 UNIT NAME PVNGS-1 DATE 05 08 89 COMPLETED BY S G
Borst TELEPHONE 602 371-4092 1.
Scheduled date for next refueling shutdown.
03/01/91 2.
Scheduled date for restart following refueling.
06/03/91 3.
Will refueling or resumption of operation thereafter require a
Technical Specification change or other license amendment?
- Yes, as a minimum it will include the following:
3/4 1.3.6, 3/4 2.3, 3/4 2.4.
4.
Scheduled date for submitting proposed licensing action and supporting information.
Submitted on 01/12/89.
5.
Important Licensing considerations associated with refueling, e.g.,
new ox different fuel design or
- supplier, unreviewed design or performance analysis
- methods, significant changes in fuel design, new operating procedures.
The fuel vendor for the next reload will be Combustion Engineering.
6.
The number of fuel assemblies a)
In the core.
241 b)
In the spent fuel storage pool.
7.
Licensed spent fuel storage capacity.
80 1329 Intended change in spent fuel storage capacity.
None 8.
Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2004 (18 Month reloads and full core discharge capability).
SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY S.
G. Zorst No.
Date Typei Duration Hours Method of Shutting System.
Component Reason2 Down Reactor LER No.
Code4 Code5 Cause and Corrective Action to Prevent Recurrence 89/02 03/05/89 F
89/03 04/08/89 S
168 552 N/A N/A 1-89-004 JC CPC N/A Continuation of forced outaget begun in March.
2nd refueling outage.
- PVNGS-1 as of March 31, 1989 requires NRC approval prior to restart in accordance with Confirmatory Action Letters of March 7, 1989 and March 28,
.1989.
~Unit was in Mode 3 at the beginning of the refueling outage.
F-Forced S-Scheduled Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refuel ing D-Regulatory Restriction E-Operator Training II License Examination F-Administrative G-Operational Error H-Other (Explain) Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20K or Greater in the Past 24 Hours 9-Other-(Explain)
Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER) File (HUREG 0161)
Exhibit H-Same Source
~
~
NRC MONTHLY OPERATING REPORT DOCKET NO.
50-529 UNIT NAME PVNGS-2 DATE 05 08 89 COMPLETED BY S G
Borst TELEPHONE 602 3 1-4092 OPERATING STATUS 1.
2.
3.
4, 5.
6.
7.
8.
9.
10.
Unit Name:
Palo Verde Nuclear Generatin Station Unit 2 Reporting Period:
A ril 1989 Licensed Thermal Power (MWt):
3800 Nameplate Rating (Gross MWe):
1403 Design Electrical Rating (Net MWe):
~12 0 Maximum Dependable Capacity (Gross MWe):
1303 Maximum Dependable Capacity (Net MWe):
~122 If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
N A Power Level to Which Restricted, If Any (Net MWe):
None Reasons For Restrictions, If Any:
N A 11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
Hours in Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve
- Shutdown, Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)
Unit Capacity Factor (Using DER Net)
Unit Forced Outage Rate Shutdowns Scheduled Over Next Refuelin Outa e
- 09 15 89 This Month 20 0 0 0 100 6 Months (Type, 58 Da s Yr.-to-Date 2 880 0
1 4 5.3 Cumulative 22 920 0
16 500 4 1 461 16 201.8 0 0 0 0 5 487 540.0 1 911 100.0 1 762 088.0 50 50 7
59 414 317. 0 20 779 570 0
19 446 141.0 50 1
69.5%
66 8
12.3
- Date, and Duration of Each):
- 25. If Shutdown At End of Report Period, Estimated Date of Startup:
See Note in Shutdowns and Power Reductions Section INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Forecast Achieved
~03 86 04/618 86
~06 86 05/520 86
~11 86
~09 19 86
~ I
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.
50-529 UNIT NAME PVNGS-2 DATE 05 08 89 COMPLETED BY S.'G Borst TELEPHONE 602 3 1-4092 MONTH: APRIL 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 17 18 0
19 20 21 22 23 24 25 10 26 0
27 12 28 13 29 14 30 15 31 16
I l
I
DOCKET NO.
50-529 UNIT NAME PVNGS-2 DATE 05 08 89 COMPLETED BY S G
Borst TELEPHONE 602 371-4092 1.
Scheduled date for next refueling shutdown.
01/13/90 2.
Scheduled date for restart following refueling.
04/17/90 3.
Will refueling or resumption of operation thereafter require a
Technical Specification change or other license amendment2 To be determined 4.
Scheduled date for submitting proposed licensing action and supporting information.
07/89 5.
Important Licensing considerations associated with refueling, e.g.,
new or different fuel design or
- supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures'o be determined 6.
The number of fuel assemblies a)
In the core.
241 b)
In the spent fuel storage pool.
7.
Licensed spent fuel storage capacity.
108 1329 Intended change in spent fuel storage capacity.
None 8.
Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2004 (18 Month reloads and full core discharge capability).
\\
DOCKET NO.
50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY S G
Borst APRIL 1989 04/01 04/28 04/30 04/30 0000 1828 1122 2400 Unit began month in Mode 3.
Unit entered Mode 4.
Unit entered Mode 5.
Unit ended month in Mode 5.
e
~
~
II
SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY S.
G. Borst No.
Date Typei Method of Duration Shutting System Component Hours Reason2 Down Reactor LER No.
Code4 Code~
Cause and Corrective Action to Prevent Recurrence 89/02 03/15/89 F
720 4
N/A N/A N/A Continuation of outage fromt the previous month.
- PVNGS-2 as of March 31, 1989 requires NRC approval prior to restart-in accordance with Confirmatory Action Letter of March 28, 1989.
F-Forced S-Scheduled Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training S License Examination F-Administrative G-Operational Error H-Other (Explain)
Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20K or Greater in the Past 24 Hours 9-Other-(Explain) Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER) File (HUREG D161)
Exhibit H-Same Source
~
~
It
NRC MONTHLY OPERATING REPORT DOCKET NO.
50-530 UNIT NAME PVNGS-3 DATE 05 08 89 COMPLETED BY S G
Borst TELEPHONE 602 3 1-4092 OPERATING STATUS 1.
2.
3.
4, 5.
6.
7.
8.
9 10.
Unit Name:
Palo Verde Nuclear Generatin Station Unit 3 Reporting Period:
A ril 1989 Licensed Thermal Power (MWt):
3800 Nameplate Rating (Gross MWe):
1403 Design Electrical Rating (Net MWe):
~12 0 Maximum Dependable Capacity (Gross MWe):
1303 Maximum Dependable Capacity (Net MWe):
1221 If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
N A Power Level to Which Restricted, If Any (Net MWe):
None Reasons For Restrictions, If Any:
A This Month Yr.-to-Date Cumulative 11.
12.
13.
14.
15.
Hours in Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours
'Hours Generator On-Line Unit Reserve Shutdown 20 0
2 880 0 1 106.1 1 095.0 11 496.0 9 307.8 9 273.0 16.
17.
18.
19.
20.
21
'2.
23.
24.
Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)
Unit Capacity Factor (Using DER Net)
Unit Forced Outage Rate Shutdowns Scheduled Over N
N A 4 090 086.0 34 402 824.0 1 420 500.0 1 327 900.0 50 7
50 7%
12 06 700.0 11 363 465.0 86 1%
86 1%
50.4%
86.4%
83 0%
9.1%
0 0%
- 31. 1%
ext 6 Months (Type, Date, and Duration of Each):
25 If Shutdown At End of Report Period, Estimated Date of Startup:
See Note in Shutdowns and Power Reductions Section.
INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Forecast 07787 07 87 09 87 Achieved
~10 25 87
~11 28 87 01 08 88
~
~
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-530 UNIT NAME PVNGS-3 DATE 05 08 89 COMPLETED BY S G
Borst TELEPHONE 602 3 1-4092 MONTH: APRIL 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 17 18 19
'20 21 22-
'3 25 10 26 27 12 28 13 29 14 30 15 31 16
I 1
DOCKET NO.
50-530 UNIT NAME PVNGS-3 DATE 05 08 89 COMPLETED BY S G
Borst TELEPHONE 602 3 1-4092 1.
Scheduled date for next refueling shutdown.
11/17/90 2.
Scheduled date for restart following refueling.
02/19/91 Will refueling or resumption of operation thereafter require a
Technical Specification change or other license amendments
- Yes, these are expected to include the following:
2.1.1.1, 3/4 1.1.2, 3/4 1.1.3, 3/4 1.3.1, 3/4 1.3.6, 3/4 2.1, 3/4 2.3, 3/4 2.4, 3/4 2.5, 3/4 2.8, 3/4 3.1, 3/4 3.2.
4.
Scheduled date for submitt'ing proposed licensing action and supporting information.
Submitted on 12/14/88 5.
Important Licensing considerations associated with refueling, e.g.,
new or different fuel design or
- supplier, unreviewed design or performance analysis
- methods, significant changes in fuel design, new operating procedures.
The fuel vendor for the next reload will be Combustion Engineering.
6.
The number of fuel assemblies a)
In the core.
241 b)
In the spent fuel storage pool.
7.
Licensed spent fuel storage capacity.
1329 Intended change in spent fuel storage capacity.
None 8.
Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2005 (18 Month reloads and full core discharge capability).
1
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.
50-530 UNIT NAME PVNGS-3 DATE 05 08 89 COMPLETED BY S G
Borst TELEPHONE 602 371-4092 APRIL 1989 04/01 04/02 04/30 0000 1400 2400 Unit began month in Mode 5.
Unit entered Mode 6.
Unit ended month in Mode 6.
~
)
SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY S.
G. Rorst No.
Date Type" Method of Duration Shutting System Component Hours Reason Down Reactor LER No.
Code Code Cause and Corrective Action to Prevent Recurrence 89/03 03/08/89 S
720 N/A N/A N/A Continuation of unit refueling outage.
- PVNGS-3 as of March 31, 1989 requires NRC approval prior to restart in accordance with Confirmatory Action Letters of March 7, 1989 and March 28, 1989.
F-Forced S-Scheduled Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training S License Examination F-Administrative G-Operational Error H-Other (Explain)
Hethod:
1-Hanual 2-Hanual Scram 3-Automatic Scram 4-Continuation from Previous Honth 5-Reduction of 20K or Greater in the Past 24 Hours 9-Other-(Explain) Exhibit F-instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)
Exhibit H-Same Source
~
~
t
Arizona Nuclear Power Project P.O. BOX 52034
~
PHOENIX. ARIZONA85072-2034 254-00181-JGH/SGB May 17, 1989 Docket Nos.
STN 50-528/529/530 Document Control Desk U.
S. Nuclear Regulatory Commission Mail Station Pl-137 Washington, D.C.
20555
Dear Sirs:
Subj ect:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2 and 3
Monthly Operating Reports for April 1989 File'9-024-404 89-056-026 Attached are the Monthly Operating Reports for April 1989 prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A
(Technical Specifications) to the Palo Verde Nuclear Generating Station, Units 1, 2 and 3
Operating Licenses.
By copy of this
- letter, we are also forwarding the Monthly Operating Reports to the Regional Administrator of the Region V Office.
If you have any questions, please contact Mr. S.
G. Borst, at (602) 371-4092.
Very truly yours, J.
G.
Haynes Vice President Nuclear Production JGH/SGB/dim Attachments cc:
M. J.
Davis J.
B. Martin T. J. Polich J.
A. Amenta INPO Records Center (all w/attachments)
j'r 4
I It