ML17304B177

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-528/89-17,50-529/89-17 & 50-530/89-17 on 890403-07.No Violations Noted
ML17304B177
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 05/05/1989
From: Yuhas G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Karner D
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17304B178 List:
References
NUDOCS 8905230088
Download: ML17304B177 (6)


See also: IR 05000528/1989017

Text

gC CELKRAIED

Dlc,

TRAPt

'110'E M04 STRA'TlOYi

SYSTEM

J

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

I'SION NBR:8905230088

DOC.DATE: 89/05/05

NOTARIZED: NO

DOCKET

IL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi

05000528

STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi

05000529

STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi

05000530

AUTH.NAME

AUTHOR AFFILIATION

YUHAS,G.P.

Region 5, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

R

KARNER, D. B.

Arizona Nuclear Power Project (formerly Arizona Public Serv

SUBJECT:

Forwards Insp Repts 50-528/89-17,50-529/89-17

& 50-530/89-17

I

on 890403-07.No violations noted.

-D

DISTRIBUTION CODE:

IE06D

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: Environ

& Radiological

(50 DKT)'-Insp Rept/Notice of Violation R spons

NOTES:Standardized

plant.

05000528'j

Standardized

plant.

05000529

Standardized

plant.

05000530 4

INTERNAL:

RECIPIENT

ID CODE/NAME

PD5 LA

CHAN,T

DAVIS,M.J.

ACRS.

NMSS/LLOB

5E4

NRR/DLPQ/PEB 11

NRR/DREP/EPB

10

NRR/PMAS/ILRB12

OGC/HDS1

RES

RGN5

FILE

01

RGN4 MURRAY,B

COPIES

LTTR ENCL

1

0

1

1

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

PD5

PD

DAVIS,M

AEOD/DSP

NMSS/SGDB

4E4

NRR/DOEA/EAB 11

NRR/DREP/RPB

10

NUDOCS-ABSTRACT

W2

RGN5

DRSS/RPB

RGN2 COLLINSID

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

2

2

1

1

1

1

2

2

1

1

. D

EXTERNAL: EG&G SIMPSON,F

NRC PDR

NOTES:

2

2

1

1

1

1

LPDR

NSIC

1

1

1

1

NarE 'Io ALL ~'RZDS~~ RECZPZENrs:

PIZASE HELP US M REDUCE HASTE!

COHrACr 'IHE DOCUNEPZ CXNriRL DESK,

RXM Pl-37

(EXT. 20079)

KO EXAMINATE KKR KQK HEN DISTiKBUTIGN

LISTS FOR DOCUMENIS KRJ DGN~T NEED!

D

Docket Nos.

50-528,

50-529

and 50-530

Arizona Nuclear

Power Project

P.

0. 'Box 52034

Phoenix,

Arizona

85072-2034

Attention:

Mr.

D.

B. Karner

Executive Vice President

Gentlemen:

Subject:

NRC INSPECTION

OF

PALO VERDE UNITS 1,

2 AND 3

This letter refers to the routine inspection

conducted

by Mr.

W. TenBrook of

this office on April 3-7, 1989, of activities authorized

by

NRC License

No.

NPF-41,

NPF-51,

and NPF-74,

and to the discussion of our findings held by Mr.

TenBrook with Mr.

R.

M. Butler and other members of your staff at the

conclusion of the inspection.

Areas

examined during this inspection

are described

in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

Our tindings indicate that cur rent plant design

does not allow for the

reduction of oxygen in auxiliary feedwater to levels consistent with Electric

Power Research

Institute guidelines.

We consider this condition to be

a plant

design

weakness

affecting the long-term maintenance

of safety-related

systems.

This weakness

merits your attention.

No violations of NRC requirements

were

identified within the scope of this inspection.

In accordance

with 10 CFR 2.790(a),

a copy of this letter

and the enclosure

will be placed in the

NRC Public Document

Room.

Should you have any questions

concerning this inspection,

we will be glad to

discuss

them with you.

Sincerely,

Or() in+( S'i,go~

Gregory

P.

Yuhas, Chief

Emergency

Preparedness

and

Radiological Protection

Branch

Enclosures:

Inspection

Report

No. 50-528/89-17,

50-529/89-17,

50-530/89-17

t

Criteria for Measurement

Comparisons

890523008S

890505

PDR

ADOCK 0500052S

9

PDC

cc w/copy of enclosures:

J.

G.

Haynes,

Vice President,

Nuclear Production

W.

F. Quinn, Director, Nuclear Safety

8 Licensing

R.

Papworth, Director, guality Assurance

L. Souza,

Manager, guality Audits

8 Monitoring

T.

D. Shriver,

Manager,

Compliance

C.

N.

Russo,

Manager,

gA Audits/Monitoring

D. Canady,

ANPP

Lynne Bernabei,

Government Accountability Project

(GAP)

Timothy Hogan, Chief Counsel,

Arizona Corp.

Commission

A.

C. Gehr, Esq.,

Snell

8c Wilner

bcc w/copy of enclosures:

Docket File

Project Inspector

Resident

Inspector

G.

Cook

B. Faulkenberry

J. Martin

R.

Nease,

NRR

State of Arizona

bcc w/o enclosures:

M. Smith

LFMB

REGION V/jg

WKTenBrook

</ >/89

EMGarcia

5'/ f/89

GPYu as

o /g/89

UEST

COPY

3

R

UEST

COPY ]

EST

COPY j

ES /

NO

E

/

NO

YES /

NO

TO

PDR

ES /

NO