ML17304B074

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Feb 1989 for Palo Verde Units 1, 2 & 3
ML17304B074
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 02/28/1989
From: Borst S, Haynes J
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
254-00104-JGH, 254-104-JGH, NUDOCS 8903240220
Download: ML17304B074 (32)


Text

/

A'gCE~RATED DI~BUTION DEMONSTRATION SY) TEM 1

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) il FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1,'rizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION BORST,S.G.

Arizona Nuclear Power Project (formerly Arizona Public Serv HAYNES,J.G.

Arizona Nuclear Power Project (formerly Arizona Public ServR RECIP.NAME RECIPIENT AFFILIATION I

SUBJECT:

Month ing repts for Feb 1989 for Palo Verde Units 1, 2

.W/890314 r.

DISTRIBUTION 9

D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:Standardized plant.

Standardized plant.

Standardized plant.

RECIPIENT ID CODE/NAME PD5 LA CHAN,T DAVIS,M.J.

INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 11 NRQP)RE 10 EG FILE EXTERNAL: EG&G SIMPSON,F LPDR

'NSIC NOTES COPIES LTTR ENCL 1

0 1

0 1

0 10 10 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD5 PD DAVIS,M AEOD/DOA ARM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN5 EG&G WILLIAMS,S NRC PDR COPIES LTTR ENCL 5

5 1

0 1

1 2

2 1

1 1

1 1

1 1

1 1

1 05000528 05000529A.

05000530 D

R I

MIX 'IO ALL "RIDS" RECIPIENIS'IZASE HELP US TO REDUCE WASTE CONIACI IHE DOCX3MENI CONIBOL DESK1 ROOM Pl-37 (EXT. 20079)

KO EILtHINATE YOUR K@K FRCH DISTRIK7ZIQN LISTS FOR DOCUMEKZS YOU DGNiT NEED)

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 35 ENCL 31

,zr tL

" 4)4 y

/

NRC MONTHLY OPERATING REPORT DOCKET NO.

50-528 UNIT NAME PVNGS-1 DATE 03 14 89 COMPLETED BY S G

Borst TELEPHONE 602 371-4092 OPERATING STATUS 1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

Unit Name:

Pa o Verde Nuclear Generatin Stat on Unit Reporting Period:

ebruar 1989 Licensed Thermal Power (MWt):

3800 Nameplate Rating (Gross MWe):

1403 Design Electrical Rating (Net MWe):

~12 0 Maximum Dependable Capacity (Gross MWe):

1303 Maximum Dependable Capacity (Net MWe):

~122 If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

A Power Level to Which Restricted, If Any (Net MWe):

one Reasons For Restrictions, If Any:

N A 11.

12.

13.

14.

15.

16 17.

18.

19.

20.

21.

22 23 24 Hours in Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate Shutdowns Scheduled Over Next Refuelin Outa e

- 04 08 89 This Month 6

0 672 0

Yr.-to-Date 1 416 0

416 0

Cumulative 2

0 0

1 156 1

0 0 620 0 0 1 416 0

0 0 16 720 9

0 0 2 385 008 0

823 00 0 778 0

1 0 100.0 100 0

0.0 5 160 479. 0 1 797 00 0

1 02 359 0

100.0 100 0

0.0 60 526 402.0 21 027 100 0

19 698 974 0 61 8

61 8

94.8a 98 5a 59.6 5

3 25.

6 Months (Type, Date, and Duration of Each):

5 Da s

25. If Shutdown At End of Report Period, Estimated Date of Startup:

N A INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION 8903240220 890228 PDR ADOCK 0500052.

R PDC Forecast

~05 85

~06 85 11 85 Achieved 05 25 85

~06 10 85

~01 28 86'~(

~ p

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-528 PVNGS-1 03 14'9 S

G Borst 602 371-4092 MONTH: FEBRUARY 1989 DAY AVERAGE DAILY POWER LEVEL 1 258 DAY 17 AVERAGE DAILY POWER LEVEL 1 192 1 256 18 1 165 1 25 19 1 084 1 255 20 410 1 259 21 541 262 22 1 005 1 263 1 260 23 24 1 214 1 214 1 259 25 1 213 10 1 235 1 023 26 27 1 210 1 212 12 1 134 28 1 211 13 1 25 14 1 25 15 1 259 16 1 255

I 4 fl

REFUELING INFORMATION DOCKET NO.

50-528 UNIT NAME PVNGS-1 DATE '3 14 89 COMPLETED BY S G

Borst TELEPHONE 602 371-4092 1.

Scheduled date for next refueling shutdown.

04/08/89 2.

Scheduled date for restart following refueling.

06/21/89 3.

Will refueling or resumption of operation thereafter require a

Technical Specification change or other license amendm'entV

Yes, as a minimum it will include the following:

3/4 1.3.6, 3/4 2.3, 3/4 2.4.

Scheduled date for submitting proposed licensing action and supporting information.

Submitted on 01/12/89.

5.

Important Licensing considerations associated with refueling, e.g.,

new or different fuel design or

supplier, unreviewed design or performance analysis
methods, significant changes in fuel design, new operating procedures.

The fuel vendor for the next reload will be Combustion Engineering.

6.

The number of fuel assemblies a)

In the core.

241 b)

In the spent fuel storage pool.

80 7.

Licensed spent fuel storage capacity.

1329 Intended change in spent fuel storage capacity.

None 8.

Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2004 (18 Month reloads and full core discharge capability).

P

,h

t t

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO ~

50-528 UNIT NAME PVNGS-1 DATE 03 14 89 COMPLETED BY S G

Borst TELEPHONE 602 3 1-4092 FEBRUARY 1989 02/01 02/10 02/13 02/17 0000 2300 0124 1748 Reactor power is at 100$.

Reactor power reduced to 80$ for surveillance testing.

Reactor power is at 1008.

Reactor power reduced for suspected feedwater heater leak.

02/19 02/21 02/22 1509 1600 1700 Reactor power Reactor power Reactor power further reduced for suspected condenser tube leak.

I i

increase commenced.

is at 1008.

02/28 2400 Reactor power is at 100%.

SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY S.

G. Borst No.

Date Typei Duration Hours Reason2 Method of Shutting System Component Down Reactor LER No.

Code4 Code5 Cause and Corrective Action to Prevent Recurrence 89/01 02/19/89 F

88 N/A N/A N/A N/A Power reduction to investigate suspected le on the secondary side.

F-Forced S-Scheduled Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training S License Examination F-Administrative G-Operational Error H-Other (Explain) Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20K or Greater in the Past 24 Hours 9-Other-(Explain)

Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER) File (HUREG 0161)

Exhibit H-Same Source

e 4

I

NRC MONTHLY OPERATING REPORT DOCKET NO.

50-529 UNIT NAME PVNGS-2 DATE 03 14 89 COMPLETED BY S G

Borst TELEPHONE 602 3 1-4092 OPERATING STATUS 1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

Unit Name:

Palo Verde Nuclear Generatin Station Unit 2 Reporting Period:

Februar 1989 Licensed Thermal Power (MWt):

3800 Nameplat:e Rating (Gross MWe):

1403 Design Electrical Rating (Net MWe):

~12 0 Maximum Dependable Capacity (Gross MWe):

1303 Maximum Dependable Capacity (Net MWe):

1221 If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

N A Power Level to Which Restricted, If Any (Net MWe):

one Reasons For Restrictions, If Any:

N A 11.

12.

13.

14.

15.

16.

17.

18

'9.

20.

21.

22.

23.

24.

Hours in Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit: Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate Shutdowns Scheduled Over Next one This Month 672 0

372 7

Yr. - to-Date 1 416 0

1 116 Cumulative 21 456 0

16 141 8

0 0 363 8

0 0 110 8

0 0 15 848 5

0 0 1 383 148 0

483 900 0 440 4 7 0 54 1

54 1

0 0 4 183 991 0

1 460 200 0 1 359 5

8 0 8

2 8

2 0 0 58 110 68.0 20 328 670.0 19 043 631.0 73 9

3 9

53 7

8 6

69 9

6 8

6 Months (Type, Date, and Duration of Each):

25. If Shutdown At End of Report Period, Estimated Date of Startup:

N A INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Forecast Achieved

~03 86 04/618 86

~06 86 05/520 86

~11 86

~09 19 86

II

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.

50-529 UNIT NAME PVNGS-2 DATE 03 14 89 COMPLETED BY S G

Borst TELEPHONE 602 3 1-4092 MONTH: FEBRUARY 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1 241 17 1 241 18 1 243 19 1 248 20 1 259 21 261 22 1 263 23 1 261 24 1 262 25 10 1 259 26 1 260 27 12 1 260 28 13 1 260 14 60 15 1 260 16 155

REFUELING INFORMATION DOCKET NO.

50-529 UNIT NAME PVNGS-2

'DATE

'3 14 89 COMPLETED BY S G

Borst TELEPHONE 602 3 1-4092 1.

Scheduled date for next refueling shutdown.

09/15/89 2.

Scheduled date for restart following refueling.

11/12/89 3.

Will refueling or resumption of operation thereafter require a

Technical Specification change or other license amendments To be determined 4.

Scheduled date for submitting proposed licensing action and supporting information.

07/89 5.

Important Licensing considerations associated with refueling, e.g.,

new or different fuel design or

supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

To be determined 6.

The number of fuel assemblies a)

In the core.

241 b)

In the spent fuel storage pool.

108 7.

Licensed spent fuel storage capacity.

1329 Intended change in spent fuel storage capacity.

None 8.

Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2004 (18 Month reloads and full core discharge capability).

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.

50-529 UNIT NAME PVNGS-2 DATE 03 14 89 COMPLETED BY S G

Borst TELEPHONE 602 371-4092 FEBRUARY 1989 02/01 02/16 02/28 02/28 02/28 0000 0346 1502 1752 2400 Reactor power is at 100%.

Reactor and Turbine trip on low,steam generator level.

Reactor is critical.

Reactor is in Mode 1.

Reactor is in Mode 1.

Generator is not synchronized.

SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY S.

G. Borst No.

Date Typei Method of Duration Shutting System Component Hours Reason Down Reactor LER No.

Code Code Cause and Corrective Action to Prevent Recurrence 89/01 02/16/89 F

308.3 N/A N/A N/A The LER has not been submit~

for this event.

Prelimin investigation has identified a malfunction of the Feedwater Control System which resulted in a reactor trip due to low Steam Generator Level.

Root Cause and Corrective actions are yet to be determined.

F-Forced S-Scheduled Reason:

A-Equipment Failure (Explain) 8-Haintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training

& License Examination F-Administrative G-Operational Error H-Other (Explain)

Method:

1-Hanual 2-Hanual Scram 3-Automatic Scram 4-Continuation from Previous Honth 5-Reduction of 20K or Greater in the Past 24 Hours 9-Other-(Explain)

. Exhibit F-instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER) File (HUREG 0161)

Exhibit H-Same Source

NRC MONTHLY OPERATING REPORT DOCKET NO.

50-530 UNIT NAME PVNGS-3 DATE 03 14 89 COMPLETED BY S G

Borst TELEPHONE 602 3 1-4092 OPERATING STATUS l.

2.

3.

4.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

Unit Name:

Palo Verde Nuc ear Generatin Station Unit 3 Reporting Period:

Februar 1989 Licensed Thermal Power (MWt):

3800 Nameplate Rating (Gross MWe):

1403 Design Electrical Rating (Net MWe):

~12 0 Maximum Dependable Capacity (Gross MWe):

1303 Maximum Dependable Capacity (Net MWe):

1221 If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

N A Power Level to Which Restricted, If Any (Net MWe):

None Reasons For Restrictions, If Any:

A Cumulative This Month 6 2 0 Yr.-to-Date 1 416 0 10 032 0

9 258 8

Hours in Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate Shutdowns Scheduled Over Next Refuelin Outa e

- 03 04 89 672 1

1 057 1

0 0 0 0 0 0 9 224 0 1 046 0

672.0 0 0 0 0 0 0 34 221 929 0

12 003 800 0

11 310 850 0

3 909 191 0

2 515 761 0

1 356 600 0

887 500.0 1

2 5

3 5 0 841 186 0 100 0

91 9

100 0 100 0

91 9

100 Oa 102 5

96 6

3 8

89 0 26.la 6 Months (Type, Date, and Duration of Each):

5 Da s 8 la If Shutdown At End of Report Period, Estimated Date of Startup:

N A Achieved

~10 2~58 Forecast

~087 INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

~08

~11 2~88 01 08 88 09 8

-ll-

AVERAGE DAILYUNIT POWER LEVEL MONTH: FEBRUARY 1989 DAY AVERAGE DAILY POWER LEVEL 1 264 DAY 17 DOCKET NO.

50-530 UNIT NAME PVNGS-3 DATE 03 14 89 COMPLETED BY S G

Borst TELEPHONE 602 3 1-4092 AVERAGE DAILY POWER LEVEL 1 263 1 262 1 269 18 19 1 262 1 261 1 268 122 20 21 1 263 1 263 122 123 22 23 1 263 1 24 1 26

!'4 1 240 1 269 25 1 240 10 1 26 104 26 27 1 23 1 232 12 1 231 28 1 236 13 1 268 14 1 268 15 1 268 16 1 267

1

REFUELING INFORMATION DOCKET NO.

50-530 UNIT NAME PVNGS-3 DATE 03 14 89 COMPLETED BY S G

Borst TELEPHONE 602 3 1-4092 1.

Scheduled date for next refueling shutdown.

03/04/89 2.

Scheduled date for restart following refueling.

05/17/89 3.

Will refueling or resumption of operation thereafter require a

Technical Specification change or other license amendment?

Yes, these are expected to include the following:

2.1.1.1, 3/4 1.1.2, 3/4 1.1.3, 3/4 1.3.1, 3/4 1.3.6, 3/4 2.1, 3/4 2.3, 3/4 2.4, 3/4 2.5, 3/4 2.8, 3/4 3.1, 3/4 3.2.

4.

Scheduled date for submitting proposed licensing action and supporting information.

Submitted on 12/14/88 5.

Important Licensing considerations associated with refueling, e.g.,

new or different fuel design or

supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

The fuel vendor for the next reload will be Combustion Engineering.

6.

The number of fuel assemblies a)

In the core.

241 b)

In the spent fuel storage pool.

0 7.

Licensed spent fuel storage capacity.

1329 Intended change in spent fuel storage capacity.

None 8.

Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2005 (18 Month reloads and full core discharge capability).

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.

50-530 UNIT NAME PVNGS-3 DATE 03 14 89 COMPLETED BY S G

Borst TELEPHONE 602 3 1-4092 FEBRUARY 1989 02/01 02/10 02/12 02/28 0000 2348 0800 2400 Reactor power is at 100%.

Reactor power decreased to support surveillance testing.

Reactor power is at 100%.

Reactor power is at 1008.

4 g I f

'A

SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-536'ATE

~03 1~48 COMPLETED BY S.

G. Borst Method of Duration Shutting System Component No.

Date Type1 Hours Reason2 Down Reactor LER No.

Code4 Code5 Cause and Corrective Action to Prevent Recurrence No significant power reductions during reporting period.

F-Forced S-Scheduled Reason:

A-Equipment Failure (Explain) 8-Haintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training S License Examination F-Administrative G-Operational Error H-Other (Explain)

Hethod:

1-Hanual 2-Hanual Scram 3-Automatic Scram 4-Continuation from Previous Honth 5-Reduction of 20K or Greater in the Past 24 Hours 9-Other-(Explain) Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER) File (HUREG 0161)

Exhibit H-Same Source

Vi

W,~

~

I Cv..

Arizona Nuclear Power Project P.O. BOX 52034

~

PHOENIX. ARIZONA85072-2034 254-00104-JGH/SGB March 14, 1989 Docket Nos.

STN 50-528/529/530 Document Control Desk U.

S. Nuclear Regulatory Commission Mail Station Pl-137 Washington, D.C.

20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2 and 3

Monthly Operating Reports for February 1989 File'9-024-404 89-056-026 Attached are the Monthly Operating Reports for February 1989 prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A

(Technical Specifications) to the Palo Verde Nuclear Generating Station, Units 1, 2 and 3

Operating Licenses.

By copy of this

letter, we are also forwarding the Monthly Operating Reports to the Regional Administrator of the Region V Office.

If you have any questions, please contact Mr. S.

G. Borst, at (602) 371-4092.

Very truly yours, J,

G. Haynes Vice President Nuclear Production JGH/SGB/dim Attachments cc:

M. J.

Davis J.

B. Martin T. J. Polich J.

A. Amenta INPO Records Center (all w/attachments)

P J3II g//1

'I f

N

\\