ML17304B065
| ML17304B065 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 03/03/1989 |
| From: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Karner D ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| References | |
| NUDOCS 8903150021 | |
| Download: ML17304B065 (8) | |
Text
gc Cp~ ~TED DI.
Bt 'T1 ON DE MON STR ON Fr'FTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8903150021 DOC.DATE: 89/03/03 NOTARIZED: NO DOCKET FACIL:STN-50-530 Palo Verde Nuclear Station, Unit 3,'Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION MARTIN,J.B.
Region 5, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION KARNER,D.B.
Arizona Nuclear Power Project (formerly Arizona Public Serv
SUBJECT:
Confirmatory action ltr re actions util intends to take re unusual event on 890303.
I DISTRIBUTION CODE:
IE35D COPIES RECEIVED:LTR ENCL 3 SIZE-TITLE: Emergency Preparedness A-ppraisal/Confirmatory Ac%ion Ltr/Exercrse RepP NOTES:Standardized plant.
05000530~
RECIPIENT ID CODE/NAME PD5 PD DAVIS,M INTERNAL: ARM/DAF/LFMB NRR LRB12 G
ThE 02 G~R
/EPRPB EXTERNAL: LPDR NSIC NOTES:
COPIES LTTR ENCL 1
1 1
1 1
0 1
1 1
1 1
1
.1.
1 1
1 1
1 RECIPIENT ID CODE/NAME DAVIS,M.J.
NRR/DREP/EPB 10 NUDOCS-ABSTRACT RGN5 FILE 01 NRC. PDR COPIES LTTR ENCL 1
1 1
1 1
1
~
1 1
1 1
I D
NOIE 'IO ALL "RIDS" RECIPIEMIS:
PIZASE HELP US 1O RElXJCE %ASXE!
CONI'ACI'IHE DOCUMENI'ONSOL DESKf ROCM Pl-37 (EXT. 20079)
KO EIiDG2QQ!E ARK NAME FRY DISTIKBUTION LISTS POR DOC(MENIS YOU. DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED:
LTTR 14 ENCL 13
0~
~ l I
ggS REC(p P
~4
~
0
~y
~i n
I C
~I O
O n Jfypy 4 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION V 1l60 MARIALANE, SUITE 210 WALNUTCR EEQ@lfORlgf4596.6368 CONFIRMATORY ACTION LETTER yp,+ 0 19')
Docket No. 50-530
'License No. NPF-74 Arizona Nuclear Power Project P.O.
Box 52034 Phoenix, Arizona 85071-2034 Attention:
Mr. Donald B. Karner Executive Vice President 6entlemen:
The purpose of. this letter is to confirm our understanding of the actions you intend to take regarding the Unusual Event which occurred on March 3, 1989.
Based on the discussions held between Mr. A. E. Chaffee, of my staff,. and you, it is our understanding that your actions will include, but will not necessarily be limited to, the following:
1.
You will develop a plan for investigating this event and present it to the NRC prior to comencing troubleshooting of the atmospheri'c dump valves; reactor coolant pump fast transfer circuitry; steam bypass control system; offsite and onsite.power supply breakers, switches and interlocks associated with this event; all valves and dampers which failed to automatically activate when called upon during this event;
- and, the power supply to the Control Room radiation monitor. This plan will include provisions for prior notice to the NRC of your intent to release equipment from quarantine for troubleshooting or other essential purposes.
This notice shall provide sufficient time for NRC representatives to arrange for review of your specific troubleshooting procedures and to be
- present at the job site.
None of the above shall preclude those ANPP actions needed to maintain and ensure plant safety.
2.
You will conduct a thorough investigation and obtain a full understanding of the March 3, 1989, Unusual Event and define the pre-restart and post-restart corrective actions needed as a result of this event.
3.
You will brief the NRC upon completion of your investigation and will not restart (enter Mode 2) the Palo Verde Unit 3 facility prior to receiving NRC concurrence.
The NRC intends to review this event and your investigation of it with an Augmented Inspection Team (AIT) led by Mr. D. F. Kirsch of Region V.
He-.will ar rive onsite at 8:00 a.m.,
March 4, 1989, to introduce his team and discuss the scope of the AIT inspection with ANPP management representatives.
3903150021
. A530 890303 S
2>>
If our understanding concerning your proposed actions, as summarized
- above, is not correct, you should promptly notify this office in writing..
Since ely, cc:
J. Taylor, DEDO T. Hurley, NRR E. Jordan, AEOD G. Knighton, NRR G. Holahan, NRR M. Virgilio, NRR Document Control Desk (RIDS)
I hn B. Hartin Regional Administrator
4l 41 i
-J RV/jk REQUEST C
PY RE EST COPY REQUEST C
PY YES NO E
/
NO YES /
NO REQUEST COPY "NO SN'ES' NO
/
MILLER 3/$
'89 ZIMMERMAN g~/'/3
/89 CHAFFEE MARTIN:
3/M /89 3/ '/89 bcc:
Project Inspector Resident Inspector docket file G.
Cook B. Faulkenberry J. Martin M. Smith J. Zollicoffer
~I r