ML17304A999
| ML17304A999 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 01/18/1989 |
| From: | Marlone Davis Office of Nuclear Reactor Regulation |
| To: | Karner D ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| References | |
| TAC-68184, TAC-68185, TAC-68186, NUDOCS 8902010307 | |
| Download: ML17304A999 (4) | |
Text
January 18, 1989 Docket Nos. 50-528, 50-529, and 50-530 Hr. Donald B. Karner Executive Vice President Arizona Nuclear Power Project Post Office Box 52034 Phoenix, Arizona 85072-2034
Dear Hr. Karner:
SUBJECT:
ACCEPTANCE OF CHANGES TO THE OPERATIONAL QUALITY ASSURANCE PROGRAM FOR PALO VERDE (TAC NOS. 68184,
- 68185, and 68186)
The staff has reviewed the changes addressed in the proposed change of March 24, 1988 to the PVNGS FSAR, Section 1.8.
>Ie find that it continues to meet the requirements of 10 CFR 50 Appendix B; therefore the change is acceptable.
If there are any questions concerning this review please contact me at (301)492-1368 Sincerely,
/s/
Michael J. Davis, Project Manager Project Directorate V
Division of Reactors Projects - III, IV, V and Special Projects DISTRIBUTION
(~
NRC
& Local PDRs PD ¹5 Reading HVirgi1 io JLee HDavis OGC (for infro only)
EJordon BGrimes ACRS (10)
Docket No. 50-528,529,530 DRSP/PD5+~
DRSP/PD5 HDavis:rw TChan 1/IS/89 1/Ig/89 DR 5
GK on 1/I /89 DEST/SPLB CNichols ~
1/>S'/89 C 3902010307 390113 PDR ADOCK 05000523 P
U V
t "N )
~
lt I'l N
U
~
t ll V
IU N
I N
I,I I
h I II, IU
'N V
t
~
I I
N
t UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 January 18, 1989 Docket Nos. 50-528, 50-529, and 50-530 Nr. Donald B. Karner Executive Vice President Arizona Nuclear Power Project Post Office Box 52034 Phoenix, Arizona 85072-2034
Dear Nr. Karner:
SUBJECT:
ACCEPTANCE OF CHANGES TO THE OPERATIONAL QUALITY ASSURANCE PROGRAN FOR PALO VERDE (TAC NOS.
- 68184, 68185, and 68186)
.The staff has reviewed the changes addressed in the proposed change of March 24, 1988 to the PVNGS FSAR; Section 1.8.
We find that it continues to meet the requirements of 10 CFR 50 Appendix B; therefore the change is acceptable.
If there are any questions concerning this review please contact me at (301)492-1368 S incer e ly, I
Michael J. Davis, Project IIanager Project Directorate V
Division of Reactors Projects - III, IV, V and Special Projects
Hr. Donald B. Karner Arizona Nuclear Power Project Executive Vice President Post Office Box 52034 Phoenix, Arizona 85072-2034 Palo Verde CC:
Arthur C. Gehr, Esq.
Snell
& Wilmer 3100 Valley Center Phoenix, Arizona 85073 Hr. James M. Flenner, Chief Counsel Arizona Corporation Commission 1200 West Washington Phoenix, Arizona 85007 Charles R. Kocher, Esq. Assistant Council James A. Boeletto, Esq.
Southern California Edison Company P. 0.
Box 800
- Rosemead, California 91770 Mr. Hark Ginsberg Energy Director Office of Economic Planning and Development 1700 West Washington - 5th Floor Phoenix, Arizona 85007 Hr. Wayne Shirley Assistant Attorney General
'ataan Memorial Building Santa Fe, New Mexico 87503 Hr. Tim Polich U.S. Nuclear Regulatory Ceanission HC-03 Box 293-NR Buckeye, Arizona 85326 Regional Administrator, Region V
U. S. Nuclear Regulatory Ceaoission 1450 Maria Lane Suite 210 Walnut Creek, California 94596 Ms. Lynn Bernabei Government Accountability Project of the Institute for Policy Studies 1901 Que Street, NW Washington, DC 20009 Hr. Charles B. Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.
7910 Woodmont Avenue Suite 1310
- Bethesda, Maryland 20814