ML17304A608
| ML17304A608 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 09/20/1988 |
| From: | Pate R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Karner D ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| Shared Package | |
| ML17304A609 | List: |
| References | |
| NUDOCS 8810040136 | |
| Download: ML17304A608 (5) | |
See also: IR 05000528/1988023
Text
ACCELEBRATED
DISTRIBUTION
DEMONSTRATION
SYSTEM
SUBJECT:
Forwards Insp Repts 50-528/88-23,50-529/88-23
& 50-530/88-22
on 880705-0813.No violations or deviations noted.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:Standardized
plant.
Standardized
plant.
Standardized
plant.
05000528
S
05000529
05000530 j
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8810040136
DOC.DATE: 88/09/20
NOTARIZED: NO
DOCKET
FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi
05000528
STN-50-529 Palo Verde Nuclear Station, Unit 2,. Arizona Publi
05000529
STN-50-530 Palo Verde Nuclear Station, Unit 3,,Arizona Publi
05000530
AUTH.NAME
AUTHOR AFFILIATION
PATE,R.J.
Region 5, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
KARNER,D.B.
Arizona Nuclear Power Project (formerly Arizona Public Serv
RECIPIENT
ID CODE/NAME
PD5
DAVIS,M
INTERNAL: ACRS
DEDRO
NRR/DLPQ/PEB 11
NRR/DOEA DIR 11
NRR/DREP/RPB
10
NRR/PMAS/ILRB12
02
RGN5
FILE
EXTERNAL: LPDR
NOTES
COPIES
LTTR ENCL
1
1
2
2
2
2
1
1.
1
1
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
CHAN,T
LICITRA,E
NRR MORISSEAU,D
NRR/DLPQ/QAB 10
NRR/DREP/EPB
10
NRR/DRIS DIR 9A
NUDOCS-ABSTRACT
OGC/HDS1
RES/DSIR
DEPY
NRC PDR
COPIES
LTTR ENCL
2
2
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
R
I
A
8
'h
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
30
ENCL
30
2 0
)Ogg
Docket Nos.
50-528
50-529
50-530
Arizona Nuclear
Power Project
P.
0.
Box 52034
Phoenix,
85072-2034
Attention:
Mr.
D.
B.
Kame r
Executive Vice President
Gentlemen:
Subject:
NRC Inspection of Palo Verde Units 1,
2 and 3.
This refers to the inspection
conducted
by Messrs.
T. Polich, J. Ball and
G. Fiorelli of this office on July 5, through August 13, 1988, of
activities authorized
by
NRC License
Nos.
and
to the discussion of our findings held with members of your staff at the
conclusion of the inspection.
Areas
examined during this inspection
are described
in the enclosed
inspection report.
Within these
areas,
the inspection consisted of
selective
examinations
of procedures
and representative
records, inter-
views with personnel,
and observations
by the inspectors.
No violations or deviations of NRC requirements
were identified within
the scope of this inspection.
In accordance
with 10 CFR 2.790(a),
a cqpy of this letter and the en-
closure will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this inspection,
we will be
pleased
to discuss
them with you.
GX( i~ ~
Robert J.
Pate,
Chief
Reactor
afety Branch
Enclosure:
Inspection
Report Nos. 50-528/88-23,
50-529/88-23
and 50-530/88-22.
8820040136
8809'20
ADOCK 0500052'
cc w/enclosure:
J.
G.
Haynes,
Vice President,
Nuclear Production
W. f. quinn,
Manager,
Licensing
T.
D. Shriver,
Manager,
Compliance
L.
Papworth, Director, equality Assurance
L.
Souza,
Manager,
equality Audits 8 Monitoring
J.
Kirby, Director, Site Services
A.
C. Gehr,
Esq.
Ms.
L. Bernabei,
GAP
D. Railsback,
Arizona Corporation
Commission
bcc w/enclosure:
docket file
G.
Cook
B. Faulkenberry
J. Martin
Resident
Inspector
Project Inspector
bcc w/o enclosure:
LFMB
M. Smith
REGION V/ooack
- JBal A ,i
f ~ GFiorelli l.gpB TPolic
%<
SRic
rd
at
REgUES
Y j
REQUES
j
COPY
g
R
UEST
COPY )
UE T COPY j
YES
N
YES
NO
YES /
NO
S /
NO
ES /
NO
S
ND TO
PDR j
E
/
NO